电气英文自我评价范文.doc
《电气英文自我评价范文.doc》由会员分享,可在线阅读,更多相关《电气英文自我评价范文.doc(29页珍藏版)》请在三一办公上搜索。
1、电气英文自我评价范文电气英文自我评价范文篇一My name is *, engaged in electrical equipment repair work has been 5 years. Since * * * years to * * company, has been working for more than two years. From entering the company has been engaged in substation operation and maintenance and management. Has participated in and org
2、anized a high-pressure measurement and relay protection setting and calibration; reactive power compensation and voltage setting; DC screen inspection and maintenance; substation secondary circuit fault and processing; high-voltage cabinet failure and treatment; high-voltage cable head Production an
3、d processing; substation in the spring and autumn all overhaul and maintenance; outdoor high voltage overhead line fault handling and maintenance. I always assiduously with high-voltage technology to improve the operating rate of the combination, and actively study the principles of high-voltage equ
4、ipment and maintenance experience, and insist on constantly improve their theoretical and practical skills to solve the substation running a lot Technical problems, in order to improve the power transmission and transmission equipment operating rate and laid a good foundation. Substation is the powe
5、r system in the power of the voltage and current transformation, concentration and distribution of the place. In order to ensure the quality of electrical energy and the safety of the equipment, voltage regulation, power flow and voltage distribution, distribution of power, current and power in each
6、 node and branch of the power system and control of transmission and distribution lines and Protection of major electrical equipment. Now substation over the past two years have experienced the work summarized as follows:1, vacuum circuit breakers in the daily operation of the fault types and treatm
7、ent.November 8, 2018 due to power company line fault on my company large power outage for 3 hours. After receiving the notice, we press the power substation regular power outage procedures for power outages. When the power company to deal with failure after transmission, according to power transmiss
8、ion step. Then found the 35KV main transformer vacuum circuit breaker refused to close, this is my company has just put into operation for two months the first time the substation problems, our company substation 35KV high voltage cabinet vacuum circuit breaker is applied Chint ZN85-40.5 circuit bre
9、akers. In the experimental state found after closing the circuit breaker command, closing electromagnet action, the core plunger will close the pawl top open, closing the spring release energy, driving the circuit breaker closing, but the circuit breaker interrupter can not be together brake. After
10、analysis, indicating that mechanical failure has been excluded, indicating that the secondary line fault, found in the secondary auxiliary plug has a needle and control wire desoldering, vacuum breaker to deal with after closing, fault problem solving. Vacuum circuit breakers in the daily work of th
11、e most prone to failure to be summed up: 1. Positive air circuit breaker refused to sub (gate)2. Vacuum circuit breaker body energy storage, energy storage motor stop 3. Vacuum interrupter interrupter can not be disconnected 2, the current transformer secondary open and deal with* * The end of the m
12、onth, the power company came in February of the electricity details, with my company substation measured by the amount of difference 20182KW.h. I led the technical staff to conduct a comprehensive inspection of high-pressure measurement, due to limited conditions, failed to find fault problems. The
13、company invited the power company metering and testing center substation secondary circuit test. The current transformer, voltage transformer, secondary voltage drop and secondary load, electric energy meter of 35KV and 10KV each switch cabinet are tested. In the power company equipment testing foun
14、d 35KV high back-up protection of the terminal has an indirect open phenomenon. After processing, in the specified time with the power company metering center, the problem has been resolved. Current transformer CT primary winding number of turns is small, the use of a winding in series in the measur
15、ed line, the secondary winding turns, and measuring instruments and relays and other current coil in series, measuring instruments and relays and other current coil impedance is very small , So the normal operation of CT is close to short-circuit state. CT secondary current size determined by the pr
16、imary current, secondary current generated by the magnetic potential, is to balance the current magnetic potential. If the secondary open circuit, the impedance is infinite, the secondary current is equal to zero, the magnetic potential is equal to zero, can not balance the current generated by a ma
17、gnetic potential, then a current will act on the excitation, the core serious saturation. Magnetic saturation increases the iron loss, CT fever, CT coil insulation will be burned by overheating. But also in the core to produce remanence, increasing the transformer error. The most serious is due to t
18、he magnetic saturation, alternating sine wave into a trapezoidal wave, the rapid changes in flux moment, the secondary coil will induce a high voltage, the peak up to several thousand volts, so high Of the voltage on the secondary coil and the secondary circuit, the person and equipment are a seriou
19、s threat.3, to complete the good leadership of the other basic and temporary work assigned.Over the past year, I am learning and working in the gradual growth and maturity, but I know there are many deficiencies, such as lack of ability to work and innovation, lack of political theory to be improved
20、 and so on. In the future I will try to do the following, I hope the leadership and comrades of my supervision and guidance:1, consciously strengthen the study, to the theory of learning, to professional knowledge learning, learning to colleagues around, and gradually improve their theoretical level
21、 and operational capacity.2, to overcome the young gas impatient, so down to earth, improve work initiative, not afraid to do more things, not afraid to do small things, improve the practice in the bit to improve themselves.3, continue to improve their political accomplishment, strengthen the sense
22、of purpose of serving the people, and strive to become an outstanding national civil servants.电气英文自我评价范文篇二This year is coming to an end, in order to be able to work better in the next year, sum up experience, adhere to the advantages and correct deficiencies, according to company requirements, summa
23、rized as follows: in a year's work, through the summary, although made some progress, A lot of shortcomings and deficiencies. As an electrical and mechanical workshop electrical technicians, in the production of work is only constantly sum up the lessons learned and found that in order to make t
24、heir own faster progress.First, in-depth, solid workAs an electrical technician in the electromechanical workshop of the coal preparation plant, my main responsibility is to be responsible for the management of electrical technology in the electromechanical workshop, to work out the maintenance arra
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 电气 英文 自我 评价 范文
链接地址:https://www.31ppt.com/p-4567635.html