电气技术员英文自我评价.doc
《电气技术员英文自我评价.doc》由会员分享,可在线阅读,更多相关《电气技术员英文自我评价.doc(22页珍藏版)》请在三一办公上搜索。
1、电气技术员英文自我评价电气技术员英文自我评价篇一This year is coming to an end, in order to be able to work better in the next year, sum up experience, adhere to the advantages and correct deficiencies, according to company requirements, summarized as follows: in a year's work, through the summary, although made some pr
2、ogress, A lot of shortcomings and deficiencies. As an electrical and mechanical workshop electrical technicians, in the production of work is only constantly sum up the lessons learned and found that in order to make their own faster progress.First, in-depth, solid workAs an electrical technician in
3、 the electromechanical workshop of the coal preparation plant, my main responsibility is to be responsible for the management of electrical technology in the electromechanical workshop, to work out the maintenance arrangement of the electrical equipment and the corresponding management rules and tec
4、hnical operation measures, organize the staff to do well in the business training; Often in-depth site, continue to promote new technology and new technologies.Over the past year, I have been working hard, fulfilling my duties seriously, constantly improving myself from the technical and management
5、level, and have made great achievements in all aspects. I work in the workshop with the same below the master of the workers, equipment problems encountered actively to the scene to deal with failures, eliminate hidden dangers. Insist on the scene every day to check the operation of equipment, high
6、and low voltage equipment for power supply and distribution; master production process of coal preparation to learn the principle of centralized control; understand the control signal routing layout, information transmission. Now many aspects have made great progress, for example: the communication
7、2 × × station system, the elevator running system, automatic control system concentrator, filter closed-loop control system, King configuration system, pressurized filter system, the main Plant and new plant coal washing system, from shallow to deep grasp the basic control structure and
8、principle of the system. So I have a very thorough understanding of the production process of coal washing, and have learned the knowledge and the actual production of effective combination for the future to better theory with practice, better promote the production, better reduce the workers The ma
9、ster of the labor intensity, more effective to improve labor productivity, for enterprises and the community to create more benefits laid a solid foundation. Other aspects of meticulous improvement and completion of electrical safety regulations and measures to seriously monitor the implementation o
10、f the annual maintenance in the XX 11, through the replacement and overhaul of the transformer, but also learned a lot of things usually do not see, so I coal washing Plant electrical equipment with a deeper understanding.Material plan to provide timely, comprehensive, accurate spare parts parameter
11、s is the guarantee of normal operation of the equipment, I am responsible for the electrical equipment materials plan to report work, at work, I ran the scene, check the problem, so that spare parts can be more comprehensive and reliable , To avoid the lack of spare parts and delay the status of pro
12、duction. And through the low-voltage power distribution room to find the problem, and other technical staff together proposed the transformation of low-voltage distribution room equipment plan, and through the production of selection, use, the basic solution to the production of spare parts for the
13、purchase of passive, and Resulting in equipment failure problems. Low voltage power distribution room of the new plant are used in the domestic production of electrical components, AC contactor with the use of materials often aging, poor access to auxiliary early, the signal is not normal and so on,
14、 after the decision to use imported Siemens contactor to transform it, So far, basically solved the problem caused by the contactor accident occurred, reducing the accident rate, a substantial increase in the driving rate, to ensure the normal production of coal washing.In the work, the first is str
15、ict on their own, do not allow the staff to do, their firm quit, for the field workers to set an example. In the implementation of the implementation of procedural measures, the strict on-site, the work of a number of measures do not quit. The illegal behavior of workers and non-standard behavior re
16、solutely stop. In the production of security incidents and accidents affecting the production of serious organizational analysis, do not go through the motions, accountability does not take the form, so that the implementation of responsibility, education, alert everyone's purpose. The second is
17、 to consider the work of small, so that the overall balance, that is, there are safety education and specific work arrangements, taking into account the production and taking into account the electrical and mechanical and business, so that the face of all non-leakage control, the work done a layout,
18、 , There are checks. Third, pragmatic, through the daily study, and constantly improve their theoretical level, operational level, practical experience and personal qualities. Fourth, a solid work, the work does not remain on the surface, not afraid of difficulties, not afraid of wounding, truth-see
19、king results, and further improve their management level.Second, join the technical innovation, never in innovationIn the work, seriously to the old comrades to learn, and constantly improve themselves, and use other time, learn more new knowledge. And actively participate in the plant plc program c
20、ontrol system to the transformation, and achieved certain results, including the following: First, seriously involved in the flotation automation system, and basically mastered the flotation automatic control system, mastered the The new control system, learned to solve and deal with problems in way
21、s and methods; followed by the thickener automatic control system transformation, the OMRON plc with updated understanding; Third, the design of the plant ash measurement system configuration screen Designed to make better use of gray instrument in the production, to make the configuration screen, y
22、ou can use the unit time of the various instantaneous ash, the unit time to calculate the average ash to solve the ash analyzer average ash value The design and transformation of the chain of 302 chain-link protection procedures, and in the configuration screen to add 302 chain-link chain protection
23、 alarm, reducing the chain once the parking chain will be mistaken for a broken chain protector Motion problems, and solve the previous chain protection device action, the alarm can also start the car issue, reducing the electrician to determine the fault and solve the problem of processing time; Fi
24、fth, add the belt belt ash tester fault alarm device, the use of Ash measured ash content of the actual value, compared with the set percentage, when the ash over 12.00ash, that is audible and visual alarm (now only the optical signal, not the use of sound alarm), the other is now on the ash measuri
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 电气 技术员 英文 自我 评价
链接地址:https://www.31ppt.com/p-4567581.html