1、安装检查,2 2023/4/25 Confidential|KONE Corporation|training material,目标:,了解现场电梯安装存在的错误问题;避免错误安装存在的安全隐患.,3 2023/4/25 Confidential|KONE Corporation|training material,1、厅门,安装检查,4 2023/4/25 Confidential|KONE Corporation|training material,安装检查,5 2023/4/25 Confidential|KONE Corporation|training material,安装检查,
2、6 2023/4/25 Confidential|KONE Corporation|training material,安装检查,7 2023/4/25 Confidential|KONE Corporation|training material,安装检查,8 2023/4/25 Confidential|KONE Corporation|training material,安装检查,护脚板折勾横向钩入地坎的方孔内,护脚板两端用自攻螺栓固定。,9 2023/4/25 Confidential|KONE Corporation|training material,安装检查,10 2023/4/
3、25 Confidential|KONE Corporation|training material,安装检查,11 2023/4/25 Confidential|KONE Corporation|training material,安装检查,12 2023/4/25 Confidential|KONE Corporation|training material,安装检查,要求:样板放置时注意厅门地坎至井道前壁距离。增加支架延伸板。,13 2023/4/25 Confidential|KONE Corporation|training material,安装检查,14 2023/4/25 Co
4、nfidential|KONE Corporation|training material,安装检查,依厅门样板垂线为基准,地坎30mm,上坎轨道65mm,顶端58mm。,15 2023/4/25 Confidential|KONE Corporation|training material,当开门距LL1100mm时,其上坎中间位置安装二个固定支架,防止上坎变形。,安装检查,16 2023/4/25 Confidential|KONE Corporation|training material,安装检查,角形支架安装位置,其底边应高于、等于上坎轨道底部,否则,门扇碰角形支架。,17 2023
5、/4/25 Confidential|KONE Corporation|training material,安装检查,易造成机械锁钩无法脱钩。,18 2023/4/25 Confidential|KONE Corporation|training material,2.导轨,安装检查,19 2023/4/25 Confidential|KONE Corporation|training material,安装检查,国标:轿厢导轨和设有安全钳的对重导轨接头处台阶用直线度为0.01/1000的平直尺测量,应不大于0.05mm,如超过应修平,修光长度为300mm以上。,20 2023/4/25 Co
6、nfidential|KONE Corporation|training material,安装检查,21 2023/4/25 Confidential|KONE Corporation|training material,安装检查,22 2023/4/25 Confidential|KONE Corporation|training material,安装检查,23 2023/4/25 Confidential|KONE Corporation|training material,安装检查,24 2023/4/25 Confidential|KONE Corporation|training
7、 material,安装检查,25 2023/4/25 Confidential|KONE Corporation|training material,安装检查,26 2023/4/25 Confidential|KONE Corporation|training material,安装检查,压导板必须紧贴导轨侧沿,压导板螺栓必须紧固,防止导轨移位,27 2023/4/25 Confidential|KONE Corporation|training material,安装检查,导轨平行度调整要求:以300mm直尺为基点,其导轨平行度偏差2.5m/s以下速度的电梯应不大于1mm,2.5m/s以
8、上速度的电梯应不大于0.5mm。,28 2023/4/25 Confidential|KONE Corporation|training material,安装检查,4、机房,29 2023/4/25 Confidential|KONE Corporation|training material,安装检查,30 2023/4/25 Confidential|KONE Corporation|training material,安装检查,挡板距轮缘和钢丝绳35mm。,31 2023/4/25 Confidential|KONE Corporation|training material,安装检查
9、,A对应B/C对应D,其偏差值不应大于0.5mm,32 2023/4/25 Confidential|KONE Corporation|training material,安装检查,筑建混凝土台阶。,33 2023/4/25 Confidential|KONE Corporation|training material,安装检查,必须灌注混凝土。,34 2023/4/25 Confidential|KONE Corporation|training material,安装检查,限速器垂直度偏差应小于0.5mm。制动方向对应轿厢制动臂位置,钢丝绳垂直偏差:前后应小于2mm,左右应小于1mm。,3
10、5 2023/4/25 Confidential|KONE Corporation|training material,安装检查,36 2023/4/25 Confidential|KONE Corporation|training material,安装检查,37 2023/4/25 Confidential|KONE Corporation|training material,安装检查,为最大限度的减少电磁干扰,高电位线缆与低电位线缆必须分开100mm距离敷设,如果不可避免必须接触,则两条线缆以90度交叉。,38 2023/4/25 Confidential|KONE Corporatio
11、n|training material,安装检查,39 2023/4/25 Confidential|KONE Corporation|training material,安装检查,40 2023/4/25 Confidential|KONE Corporation|training material,安装检查,41 2023/4/25 Confidential|KONE Corporation|training material,安装检查,钢丝绳的安装必须采用盘旋方式放置,严禁采用抽拉方式,避免曳引绳扭曲变形。,42 2023/4/25 Confidential|KONE Corporati
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 垂直梯安装4 安装检查 垂直 安装 检查

链接地址:https://www.31ppt.com/p-4518239.html