1、 PLANT CONSTRUCTION CONTRACTArticle 1-DefinitionsThe Owner shall mean .The Contractor shall mean .The Plant shall mean all or any part of the machinery, equipment andmaterials forming the permanent installation as specified inAppendix.The Site shall mean all the land where the plant is to be constru
2、cted in accordance with this Contract.The Works shall mean the works to be done by the Contractor under this Contract.The Contract Price shall mean the total sum payable to the Contractor by the Owner for the Works.Article 2-Contractors Responsibilities1. The Contractor shall design, engineer, and c
3、onstruct the Plant at the Site.2. The Contractor shall provide all equipment, materials, tools, facilities,labour and services necessary for the successful constructionof the Plant except those items and facilities to be supplied by the Owner under Article.3. The Contractor shall perform the Works i
4、n accordance with the Schedulein Appendix.4. The Contractor shall provide the Owners personnel with training of peration and maintenance of the Plant in accordance with Appendix.5. The Contractor shall supply the Owner with the spare parts specified in Appendix.6. The Contractor shall supply the Own
5、er with the maintenance equipment specified in Appendix.Article 3-Owners Responsibilities1. The Owner shall make available the Site and grant the Contractor freeand uninterrupted access thereto throughout the duration of this Contract.2. The Owner shall provide those items and facilities specified i
6、n Appendixat the time therein established.3. The Owner will obtain from the relevant Authorities those licenses and permits necessary to construct and operate the Plant on the Site including work permit for the Contractors employees.4. The Owner shall pay the contractor for the Works performed the C
7、ontract Price set out in Article.Article 4-Contract Price1. Within days after the effective date of this Contract, the Owner shall pay the Contractor as full and complete compensation for accomplishing the Works and assuming all obligations under this Contract the Contract Price in the amount of .2.
8、 The Contract Price is not subject to escalation, and the cost of executing he Works shall be the risk of the Contractor who shall be deemed to have btained all information and taken into account all circumstances which may affect the cost in agreeing the Contract Price.Article 5-Drawings1. The Cont
9、ractor shall submit to the Owner for approval and review within he time specified in Appendix _ such drawings as may be required for Construction of the Plant under this Contract. Within one month after receiving such drawings the Owner shall review and approve or disapprove the drawing.2. The Contr
10、actor shall be responsible for any defects, errors or omissions in the above drawings unless such defects, errors or omissions are caused by inaccurate information furnished in writing to the Contractor by the Owner.3. All drawings and technical documentation delivered by the Owner or the Contractor
11、 to the other party shall be treated as confidential by the receiving party unless agreed otherwise, and shall not be used by that party for purposes other than those connected with this ContractArticle 6-Inspection1. The Contractor shall perform all inspection and testing of the Plant required by l
12、aw and normal engineering practice.2. The Owner shall be entitled at all reasonable times and at its own cost to inspect, examine and test the materials and workmanship of the Plant under construction. Such inspection, examination or testing if made shall not release the Contractor from any obligati
13、on under the Contract.3. The completed Plant shall be inspected, examined and tested by the Owner,and the Contractor shall give the Owner reasonable notice in writing of the date on which the Plant will be ready for testing.4. The Contractor shall provide such assistance, labour, materials, electric
14、ity,fuels, apparatus, stores and instruments as may be required and as maybe reasonably demanded to carry out such tests by the Owner properly andefficiently.5. When the Plant shall have passed the above tests, the Owner shall furnish the Contractor with a certificate in writing to that effect. No P
15、lant shall be delivered until any faults discovered during inspection are satisfactorilyrectified.Article 7-Inspection1. The Contractor shall provide at the Site to the reasonable satisfaction of the Owner all materials, labour, equipment, services and facilities that may be necessary for the proper
16、 execution and completion of the Works.2. Without prejudice to the generality of the above, the Contractor shallprovide, as may be necessary, the following:a. Construction equipment.b. Means of transport within the Site including temporary roadways.c. Fencing, lighting and guarding and all other mat
17、erials and servicesnecessary for the safety and security of persons and property.d. Temporary stores, offices and other buildings or structures for materialsand persons engaged in the Words, including persons employed by the Owner.e. Telephones, fire-fighting equipment and first-aid equipment until
18、thewhole Works have been taken over.f. Sanitary and canteen facilities for the use of persons engaged in theWorks.3. The Contractor shall observe all safety and other regulations imposedon the Site by local laws.4. The Contractor shall at all times keep the Owners property and theadjoining premises,
19、 driveways and streets free of construction materialsand rubbish caused by the Works, and at the completion of the Works shallremove all remaining materials from and about the premises and shall leavethe Site and Plant safe, clean and ready for use.Article 8-Inspection1. The Contractor will supply a
20、t his own cost food, transprot and all necessaryfacilities for all his own personnel.2. On signing the Contract, the Contractor shall appoint a project managerwho will represent the Contractor at all times be present at the Site duringworking hours. All communications issued by the Owner to the proj
21、ect managershall be binding as if given to the Contractor.3. The Owner may request the removal and replacement of any person employedby the Contractor on the Site if such person is in the Owners opinionguilty of misconduct, incompetence or negligence.Article 9-Inspection1. The Contractor shall be re
22、sponsible for all losses of or damage to thePlant before final acceptance, and shall make good al such loss or damageat the cost of the Contractor and to the reasonable satisfaction of theOwner provided, however, in the case of loss or damage to the Plant arisingfrom or occasioned by causes for whic
23、h the Contractor is mot responsibleunder the Contract, the same shall be made good by the Contractor but atthe cost of the Owner, if the Owner so directs.2. The Contractor shall indemnify the Owner in respect of all damage andinjury occurring before the issue of the final acceptance certificate toan
24、y property and person and against al l actions, suits, claims, demands, charges and expenses arising in connection therewith which shall be occasio ned by the negligence of the Contractor or any of his sub-contractors or by defective design, materials or workmanship but not otherwise.3. In the event
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- PLANT CONSTRUCTION CONTRACT
链接地址:https://www.31ppt.com/p-4491800.html