YACHT BUILD AGREEMENT(游艇建造协议).doc
《YACHT BUILD AGREEMENT(游艇建造协议).doc》由会员分享,可在线阅读,更多相关《YACHT BUILD AGREEMENT(游艇建造协议).doc(12页珍藏版)》请在三一办公上搜索。
1、 YACHT BUILD AGREEMENT(游艇建造协议)DATED: _between _s Yacht Company Limited, Hong Kong. (Hereinafter referred to as “the Builder”) and BBB CC, Vietnam, (Hereinafter referred to as “the Buyer”) WHEREAS: 1) The Buyer wishes to acquire a AAAs Cape 65 Trawler Yacht (the yacht) designed by Thanos Condylis, an
2、d built to the Buyers stated requirements and specification, and the Builder has the capability, knowledge and skills to build and supply the same. 2) The Builder has agreed to construct, equip, fit-out, test and deliver the Yacht to the Buyers stated requirements and specification, which the Buyer
3、has agreed to accept upon the terms and conditions here in after specified: Now therefore the Parties hereto have agreed and do hereby agree as follows: ARTICLE I - INTERPRETATION 1) In this Contract the following words and expressions shall have the meaning hereby ascribed to them, except where the
4、 context otherwise admits or requires: “Banking Days” Shall mean days upon which Hong Kong clearing banks are customarily open for business. “the Builders Clarifications” Shall mean the documents so entitled forming part of this Contract and set out as Annexes hereto; (See also Item (2) of this Arti
5、cle.) “Buyers Representative(s)” Shall mean such persons notified from time to time by the Buyer as having authority to act for the Buyer, the extent of such authority being set out in the notice; “Items of Buyers supply” Shall mean any item of equipment and stores for the Yacht ordered by the Buyer
6、 direct from the manufacturer or the supplier, for incorporation in the Yacht by the Builder; “Items of Builders supply” Shall mean any item of equipment and stores for the Yacht ordered by the Builder direct from the manufacturer or the supplier, for incorporation in the Yacht; “the Certifying / Su
7、rvey Body” Shall mean the body responsible for the survey and certification of the yacht to the requirements of the buyer. “the Contract” Shall mean (a) this Contract, and (b) the attached Annexes and schedule more particularly described below. “the Contract Delivery Date” Shall mean no later than _
8、;“the Contract Master Programme” Shall mean the programme for construction of the Yacht, set out in Annex D; “the Contract Price” Shall mean the price stipulated in Article V for the Yacht, Yard Number 005;“the Yacht” Shall mean the yacht the subject of this Contract and generally as described in Ar
9、ticle II, with all the machinery, apparatus, outfit, materials, and equipment appurtenant thereto, but excluding the items of Buyers supply. “the Boatyard” Shall mean AAAs Yacht Company, Xinhui, China. “the Design Specifications” Shall mean the specifications, designs, plans and drawings, set out in
10、 Schedule A, prepared and signed by the Buyer, identified as forming part of this Contract, and including such revised or supplemental specifications, plans and drawings as may subsequently be agreed between the Buyer and the Builder PROVIDED that (i) in the case of any inconsistency between any Art
11、icle or paragraph of this Contract and the Design Specifications, this Contract shall prevail, (ii) in the case of any inconsistency between the Design Specifications and a plan or drawing, the Design Specification shall prevail, and (iii) in the case of any inconsistency between one plan or drawing
12、 and another plan or drawing, the later in date shall prevail; Schedule A Shall mean the agreed schedule of drawings “Annex A” Shall mean the list of materials, components and equipment defining a completed yacht; Annex B Shall mean the agreed weld quality procedures “Annex C” Shall mean the agreed
13、Shot Blasting, Fairing, Painting and foaming Specifications Annex D“ Shall mean the agreed production schedule master program. “Specified” Shall mean stipulated in the specifications and Annex A; “Supplier” Shall mean any person, firm or company, which has entered into a contract with the Builder fo
14、r the supply of materials, machinery, services or equipment (other than items of Buyers supply) for the yacht; The Index, Article and paragraph headings, are inserted for convenience only and shall not affect the construction of this Contract. Words importing the singular shall include the plural an
15、d vice versa. 2) List of Builders clarifications, not covered in Annex A document: “Cradles for Transport” The supply of a Cradle for shipment is excluded from this Contract. “Dressing/Stepping the Mast” The dressing and stepping of mast for the Yacht is included in the Builders supply. “Storage” Th
16、e Builder will arrange secure storage ashore for the Yacht at the Boatyard between completion of build and handover at delivery. “Fabrication” The Builder will supply steel in pre-cut form with a test certificate in accordance with the builders production and quality plan. “Welding” The Contract is
17、based on NDT (non destructive testing) being conducted to the standards required by Det Norske Veritas class Rules for yacht and Small Craft, including 100% visual examination. Radiography will be completed where appropriate, at the Builders cost. All welding will be carried out in accordance with t
18、he quality plan and ISO weld procedures approved by the buyers representative and will be in general accordance with Det Norske Veritas requirements. “Shot Blasting” Shot Blasting of the Yacht will be in accordance with the agreed specification attached in Annex C. “Insulation” The insulation of the
19、 Yacht will be in accordance with the agreed specification attached in Annex C. “Fairing and Painting” The fairing and painting of the Yacht will be in accordance with the Coatings Specification attached in Annex C. “Equipment” The responsibility for the supply of materials and equipment will be as
20、defined and agreed in the Components List (Annex A) for the Yacht. “Quality Plan Documentation” An agreed quality plan will be issued covering all aspects of the Yachts construction, which will include: a) Hull & Deck Fabrication b) Blast and Prime c) Fair and Paint d) Electrical and mechanical Engi
21、neering e) Fit-OutARTICLE II DESCRIPTION 1) The Yacht to be constructed under this Contract is a Motor Yacht of approximately 20.00 metres length overall designed by Thanos Condylis, as described in the specifications, with the following main particulars: Approximate Dimensions Length overall about
22、20.00 metres Length on the water line about 18.03 metres Beam (max) about 5.75 metres Draft about 1.77 metres 2) A distinctive yard Number shall be placed upon each Yacht and her materials and outfit, during construction. The Yard Number of the Yacht shall be KYC-005. ARTICLE III CONSTRUCTION, MATER
23、IALS AND INSPECTION 1) The Yacht and her machinery, outfit, equipment, materials and workmanship shall be in accordance with this Contract and the Design Specifications. 2) In principle the builder will supply all material, components and equipment for the yacht as set out in Annexe A. Any additiona
24、l material, components or equipment procured by the builder will be billed to the buyer at delivered cost plus 15%. However the builder must notify the buyer in writing prior to procurement of the cost and quantity of any items for which the builder intends to be billed to the buyers account. 3) In
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- YACHT BUILD AGREEMENT游艇建造协议 AGREEMENT 游艇 建造 协议
链接地址:https://www.31ppt.com/p-4491737.html