集装箱码头泊位、岸桥协调调度优化外文文献翻译.doc
《集装箱码头泊位、岸桥协调调度优化外文文献翻译.doc》由会员分享,可在线阅读,更多相关《集装箱码头泊位、岸桥协调调度优化外文文献翻译.doc(17页珍藏版)》请在三一办公上搜索。
1、文献出处: Martin E. The optimization of container berths and shore bridge coordination scheduling J. Journal of the Transportation Research Board, 2015, 6(3): 40-50.原文The optimization of container berths and shore bridge coordination schedulingMartin EAbstractThe global economic development, the contain
2、er quickly raised up into exports. Rapid growth of the import and export cargo throughput brings to the container terminal larger benefits at the same time increase the burden of the port, have higher requirements on the terminal operation efficiency. How is the existing equipment of container termi
3、nals, reasonable resource allocation and scheduling, is common problem facing the container terminal. Therefore, how to improve the terminal facilities such as the maximum utilization of resources, to meet the increasing port demand, improve their competitive advantage, and has more practical meanin
4、g to improve the working efficiency of the container terminal. The main content of this study is berth, gantry cranes and set card co-allocation research, has plans to all ship to the port assignments during mathematical model is established with the target of minimum cost, according to the characte
5、ristics of the scale model by genetic algorithm, finally validates the effectiveness of the model.Keywords: System engineering; Water transportation; Gantry cranes allocation; Dynamic scheduling;1 Introduction Container terminal logistics is an organicsystem, made of interactiveanddynamic components
6、,suchas containers,ships, berths,yards, tracks,quaycranes and yard cranes trucks,laborsandcommunications, inalimitedterminalspace. Itisa complexdiscreteeventdynamicsystemrelated tokindsofcomplicatedproblemsin logisticstransportfield.Berth scheduling (berth allocation) refers to the vessel arrival be
7、fore or after according to each berth free condition and physical condition of the constraint for ship berthing berth and berthing order. To port berth scheduling optimization research has made important progress, but research is only limited to the single scheduling berth and shore bridge. Of berth
8、 scheduling problem in recent years has been based on simple berth scheduling considering more factors, but only for gantry cranes operating sequence when performing a specific loading and unloading of microscopic optimization. Container ships in the port of time depend on how well the berth schedul
9、ing on one hand, on the other hand depends on the completion of tasks of gantry cranes loading and unloading time. Gantry cranes loading and unloading time tasks assigned by the Shore Bridge and gantry cranes scheduling two link form. Gantry cranes allocation is reasonably allocated to the ship to s
10、hore bridge. Scheduling is a bridge across the river shore bridge between loading and unloading task scheduling. For container terminal how to out of berth allocation, and collaborative scheduling shore bridge set card effective allocation and the arrangement of the container yard, etc are the main
11、factors influencing the efficiency of port operations.2 Literature reviewBerth, gantry cranes and set card configuration and operation quality directly determines the operational efficiency of container ports. Container port whether can meet customer demand depends on whether the scheduling of a bet
12、ter, affecting the competitiveness of the port. So how to coordinate the three configurations and scheduling caused the wide attention of scholars both at home and abroad. Most experts and scholars in different circumstances port hardware facilities according to the different methods of berth, gantr
13、y cranes, set card and etc were studied. In recent years, the berth, shore and set scheduling and allocation problem of study to become a hot topic, scholars in a wide range of further research.2.1 Research on berth allocation problemEdmond will berth allocation problem as queuing theory for the fir
14、st time, and establish the mathematical model research berth allocation problem. Lai and Shih to adopt rules first come first service berth allocation problem, and design the corresponding heuristic algorithm for the optimization of the mathematical model of the berth allocation, and to obtain the b
15、erth allocation to wait for the mooring time, and the average berth utilization indicators for evaluation. Prove the feasibility of obtained berth allocation scheme. Kiin mixed integer programming model is established to study the for large container ship berth allocation problem to determine the sh
16、ip docked location and time, the design of simulated annealing algorithm to solve the model. Since then, many scholars study of berth allocation problem scheme compared with Kim. Imai respectively studied and dynamic to static to the port to port berth allocation problem, at the same time the berth
17、allocation in the process of container ship is introduced into the berth time priority, berth allocation was studied for the ship to port. Later, Mr Imai and Sun to adopt continuous geographical space to study the method of continuous berth allocation, established the mathematical model of the minim
18、um vessel waiting time and operation time and coefficient using LaGrange relaxation algorithm to solve. Hansen, considering the schedule and ship docked preference location problems, such as setting the berth scheduling optimization goal for waiting time while minimizing of the ship. At the same tim
19、e describes what preference position of the ship is. Lee also adopt the rules of first come first service to research into the port ship berth allocation problem, design the corresponding heuristic algorithm to solve the berth allocation model. After this, Lee and ship at the port of all research cy
20、cle to overall in the shortest time continuous berth allocation problem for the target research, through random greedy adaptive search algorithm to solve the model.2.2 Research on Shore Bridge factors problemDiazole in 1989 for the first time put forward the concept of gantry cranes scheduling by th
21、e author and a mixed integer programming model was established to solve the model to determine the distribution of each ship to the shore bridge. Park and Kim first studied the static to the port of berth and gantry cranes scheduling problem. Lim under interference constraint made the gantry cranes
22、scheduling decisions made by a branch and bound method will be a period of time the latest ship to minimize the departure time of this algorithm ability is limited but simulated annealing method feasible solution can be obtained for the same question then also has used the genetic algorithm and gree
23、dy algorithm. Mussel and had to use a more realistic shore bridge resources use function to replace the method of linear hypothesis this paper proposes a new model to improve insufficient corrected simulation in the study of land bridge in front of the interference constraint error and put forward a
24、 improved model than other algorithms are good before fast branch and bound method based on one-way operations. Bierwirth to before 2010 to berth allocation problem, task allocation problem shore bridge, gantry cranes scheduling problem of research literature made a detailed statistics and investiga
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 集装箱码头 泊位 协调 调度 优化 外文 文献 翻译

链接地址:https://www.31ppt.com/p-3995014.html