CSQS(中国造船质量标准)English version.doc
《CSQS(中国造船质量标准)English version.doc》由会员分享,可在线阅读,更多相关《CSQS(中国造船质量标准)English version.doc(108页珍藏版)》请在三一办公上搜索。
1、NOTESThere documents are shipbuilding quality standard implemented by our yard presently. They consist of two parts like QUALITY CONTROL THROUGH PRODUCTION and CONSTRUCTION ACCURACY Taken as a main basis for the shipbuilding in our yard, this construction accuracy is made according to the shipbuildi
2、ng quality standard in advanced shipbuilding nations, international conventions as well as rules and regulations of some well-known classification societies. For this purpose, we require:1. detailed workmanship and drawings, if no other specific restriction, comply with the respective requirements s
3、tated in this STANDARD. In case of difference, this STANDARD shall govern all.2. should there be some items in the newbuilding contract or technical specification of higher requirement than this STANDARD, these items should be regarded as an exception and performed according to specific requirement
4、otherwise announced.CONTENTS PART 1 QUALITY CONTROL THROUGH PRODUCTION1 STEEL MATERIAL AND PROCESSING61.1 Steel material .61.2 Steel processing .62 FIXING AND ASSEMBLING72.1 Fixing and assembling of parts and members.72.2 Block assembling73 WELDING.83.1 Preparation before welding.83.2 Welding proces
5、s.83.3 Welding inspection.83.4 Key points of quality control.94 TIGHTNESS TEST.95 FABRICATION,FIXING,TIGHTNESS TESTING AND FLUSHING OF PIPES105.1 Fabrication of pipes.105.2 Fixing of pipes and fittings .115.3 Tightness testing of piping system.125.4 Flushing of pipes126 PAINTING.136.1 Pre-treatment
6、of steel surface136.2 Shop primertouch-up.136.3 Secondary derusting and surface cleaning.136.4 Painting work.137 HULL OUTFITTING137.1 Pre-outfitting of ship equipment137.2 Approval of ship equipment.137.3 Installation of ship equipment147.4 Key points of quality control.148 MACHINERY INSTALLATION.15
7、8.1 Shafting and propeller.158.2 Main engine and accessories178.3 Auxiliary machinery.188.4 Boiler199 ELECTRIC INSTALLATION.199.1 Electric fittings.199.2 Cable laying.209.3 Installation and earthing of electric equipment209.4 Connection and earthing of metal covering of cables.2110 AUTOMATIC CONTROL
8、 AND REMOTE CONTROL,TELEMETRY EQUIPMENT AND THEIR TESTING.2110.1 Sensors.2110.2 Automatic control and remote control.2210.3 Monitoring and alarming.2210.4 Test of unattended engine room.2311 MOORING TEST AND SEA TRIAL.2311.1 Mooring test and sea trial for hull part.2311.2 Mooring test and sea trial
9、for machinery part.2411.3 Mooring test and sea trial for electric part.2512 COMPLETION AND DELIVERY.2512.1 Delivery of cabin equipment, spares and supplies2512.2 Inspection of marking and operation instructions.2512.3 As-built drawings and ship delivery documents2612.4 Certificates to be handed over
10、26PART 2 PLANS FOR APPROVAL AND INSPECITIONS AND TESTS FOR ACCEPTANCE1 PLANS FOR APPROVAL.271.1 General .271.2 Plans and documents to be submitted for review and approval272 INSPECTIONS AND TESTS FOR ACCEPTANCE.322.1 General.322.2 Items of inspection and tests.33PART 3 CONSTRUCTION ACCURACY1 HULL CO
11、NSTRUCTION341.1 Steel materials.341.2 Marking .361.3 Cutting.371.4 Forming.391.5 Fixing and assembling421.6 Welding.491.7 Fairness and finishing.511.8 Principal dimensions and deformation561.9 Draught and freeboard marks.572HULL OUTFITTING.582.1 Rudder 582.2 Mast, deck crane post and derrick boom612
12、.3 Cargo hold hatch cover.632.4 Weathertight closing devices.732.5 cabin outfitting803 MACHINERY INSTALLATION.833.1 Diesel main engine833.2 Shafting 853.3 Auxiliary machinery.863.4 Deck machinery883.5 Installation of steering gear and fastening liner.893.6 Fabrication and installation of piping.894
13、ELECTRIC INSTALLATION.984.1 Cable laying.984.2 Electric equipment installation.1005 PAINTING.1025.1 Pretreatment of steel surface1025.2 Secondary derusting.1035.3 Surface cleaning.1055.4 Quality of coating1075.5 Film thickness of coating.108PART 1QUALITY CONTROL THROUGH PRODUCTION1 STEEL MATERIAL AN
14、D PROCESSING1.1 Steel material1.1.1 Upon arrival in the yard, all marine steel materials are to be checked against quality certificates. Visual inspection is to be done to confirm their quality.1.1.2 All steel materials are to be stowed in pile according to sizes and brand andkept flat.1.1.3 All ste
15、el materials shall be served out against material allocation sheetaccording to the production plan.1.1.4 Visual inspection is to be done to the steel materials before processing.1.1.5 Key points of quality control:a) size, brand, heat number, batch number;b) minus tolerance in thickness for plates a
16、nd sections;c) surface qualities;d) any defects in large forgings and castings.1.2 Steel processing1.2.1 Marking and cutting1.2.1.1 Necessary pre-treatment such as levelling, straightening and derusting are tobe done to the plates and sections before cutting.1.2.1.2 Numerical controlled cutting and
17、other high efficient high-precision cuttingmeans are to be used as far as possible to improve marking and cutting accuracy.1.2.1.3 Material property, heat number, batch number and thickness are to be noteddown for primary members according to the requirement.1.2.1.4 Key points of quality control for
18、 marking:a) size deviation;b) anglar deviation;c) markings such as processing symbols, codes and marks.1.2.1.5 Key points of quality control for cutting:a) cutting accuracy;d) dimensional size;e) lamination.1.2.2 Forming1.2.2.1 Bending Forming by cold or hot bending of steel plates and sections is t
19、o be performed according to the specified requirements for materials of different properties and grades.1.2.2.2 Key points of quality control:a) heating temperature;b) accuracy of forming.2 FIXING AND ASSEMBLING2.1 Fixing and assembling of parts and members2.1.1 The accuracy requirements of block as
20、sembling is to be met for the fixingand assembling of parts and members. Shop pnmer is to be applied after welding.2.1.2 Key points of quality control:a) geometrical dimensions of parts and members;b) installation locations;c) deformation.2.2 Block assembling2.2.1 Block assembling is to be generally
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- CSQS中国造船质量标准 English version CSQS 中国 造船 质量标准
链接地址:https://www.31ppt.com/p-3898575.html