管道安装方案 中英文 完整版Pipeline Installation Plan.doc
《管道安装方案 中英文 完整版Pipeline Installation Plan.doc》由会员分享,可在线阅读,更多相关《管道安装方案 中英文 完整版Pipeline Installation Plan.doc(141页珍藏版)》请在三一办公上搜索。
1、文件类型Type 文件页数Total Page 版次Edition 修订说明Revision 受控编号Refer No.GH1470版首次First 管道安装方案 Pipeline Installation Plan02012-12-23Version版次Date日期Compiled by编制Reviewed by审核Approved by批准中国化学工程第十三建设有限公司The 13th construction Co.,ltd of CNCE目 录Catalogue 1概述 Generals42编制依据Compilation Basis43施工程序计划Construction Proced
2、ure Plan63.1施工程序Construction Procedure63.2施工进度计划Conctruction schedule 3.3施工人员安排表 Construction Manpower Schedule 4 施工准备 Construction Preparation95材料验收 Acceptance of Materials115.1材料外观检测 Visual Examination of Materials115.2材料的无损检测Nondestructive Testing of materials135.3阀门的试压检测 Pressure Test of Valve13
3、5.4安全阀定压调试Rated Pressure Test of Safety Valve145.5 焊材检验 Welding Materials Inspection156管道预制 Pipe Prefabrication157管道安装Pipeline Erection197.1管道安装基本要求 Basic requirement of pipeline installation207.2与动设备相连管道安装的要求Installation requirement for pipe connecting to power equipment217.3不锈钢管安装的要求Installation r
4、equirement of stainless steel pipe237.4特殊管道安装要求Installation requirement of special pipe247.5兰连接安装的要求 Installation requirement of flange connection297.6阀门安装的要求Valve installation requirement317.7管道静电接地Electrostatic grounding of pipe327.8架安装 Support installation338管道焊接及焊接检验 Pipe welding and welding ins
5、pection348.1 一般规定 Generals348.2 焊接工艺要求Welding technologic requirement368.3 焊接方法及工艺要求 Welding method and technology requirement408.4焊接进度质量要求 Requirement for welding schedule and quality428.5焊缝检查Weld inspection439管道脱脂和酸洗钝化 Pipe degreasing, pickling and passivation459.1脱脂 Degreasing459.2化学清洗 Chemical c
6、leaning4610管道试压 Requirement for pressure testing of pipeline4710.1管道试压的条件 Conditions4710.2压力试验 Pressure test4811管道吹扫、冲冼 Blowing off and flushing of piping5611.1吹扫、冲洗前的准备工作 Preparation5611.2水冲洗 Water flushing5611.3空气吹扫 Air purge5711.4吹扫、冲洗验收及完善工作 Acceptance and followup work for purge and flush5712质量
7、保证措施 Quality Guarantee Measures5812.1 质量保证目标:Quality Objective5812.2质量保证措施:Quality guarantee measures5813施工机具 Construction tools&machines6314安全保证措施 Safety protective measures6514.1焊接作业 Welding work6514.2高空作业 Work at height6614.3起重吊装 Lifting work6714.4射线防护作业 Radiographic protection work6915安全施工措施评估 A
8、ssessment of safety protective measures71附件一X射线检测方案 Appendix 1 X ray inspection plan78附件二磁粉检测方案 Appendix 2 Magnetic particle testing plan98附件三渗透检测方案 Appendix 3 Penetration Inspection scheme105附件四无损检测安全防护措施Appendix 4 Safety protection measures of Non-destruction test117附件五管道热处理施工方案 plan for piping he
9、at treatment1191概述 Generals本方案为中化蓝天霍尼韦尔新材料有限公司1.2万吨/年HFC-245fa工艺管道安装而编制。工作范围主要包括管材、管件的材料检验;管道的预制、安装;不锈钢管道的脱脂酸洗,以及管线的探伤工作。大概的工作量约有22000米管道、14400个管件和3500个阀门。管道材质为碳钢、不锈钢、合金钢、玻璃钢、衬里管道等,管道预制在现场外预制厂完成。This plan is compiled for process pipe installation of 12,000/Year HFC-245fa project of Honeywell Sinoche
10、m Lantian New Material Co., Ltd. Work scope includes inspection of pipe materials and fittings, pipe prefabrication and installation, degreasing and pickling of stainless steel pipes, and pipeline detection. The work quantity shall include approximately 22000m pipeline, 14400 pcs of pipe fittings an
11、d 3500 pcs of valves. The pipe material shall include carbon steel, stainless steel and alloy steel, glass fiber reinforced plastics and lined pipes etc. The pipeline prefabrication shall be done in the prefabrication shop outside the field. 2编制依据Compilation Basis 机电安装工程招标文件Tender documents of mechn
12、ical and electrical installation project 工业金属管道工程施工及验收规范GB 50235-2010Code for Construction and Acceptance of Industrial Metallic Pipeline Engineering GB 50235-2010现场设备、工业管道焊接工程施工及验收规范GB 50236-2011Code for Construction and Acceptance of Field Equipment and Industrial Pipeline Welding Engineering GB 5
13、0236-2011石油化工有毒、可燃介质管道工程施工及验收规范SH 3501-2011Code for construction and acceptance of petrochemical industry toxic and combustible medium pipeline engineering SH 3501-2011石油化工钢制通用阀门选择、检查及验收SH/T 3064-2003Selection, inspection and acceptance of petrochemical industry steel universal valves,SH/T 3064-2003
14、石油化工工程焊接工艺评定标准SHJ509-88Evaluation standard for welding process of petrochemical industry engineering, SHJ509-88石油化工低温钢焊接规程SH/T 3520-2004Specification for petrochemical industry low-temperature welding, SH/T 3520-2004石油化工不锈钢复合钢焊接规程SH/T 3527-1999Specification for petrochemical industrial S.S compound
15、steel welding, SH/T 3527-1999 脱脂工程施工及验收规范HG20202-2000Code for construction and acceptance of degreasing engineering HG20202-20003施工程序计划Construction Procedure Plan 审图、制作管段预制图Drawing review, and preparation of prefabrication drawing 3.1施工程序Construction Procedure领料及材料检验表面处理、油漆下料、开坡口组对、点焊焊口焊接返修焊缝检验支架预制阀
16、门试压预制厂内预制合格 不合格返修现场安装、部分焊接焊缝检验不合格管线检查 合格 管道试验、冲洗吹扫管道酸洗、钝化移交防腐保温 3.2施工进度计划Conctruction schedule区域描述开始结束HCC-240fa Unit (01)管道安装2013-8-102013-8-30查线、试压、冲洗2013-8-302013-12-10HFC-245fa Unit (02)管道安装2013-6-302013-8-30查线、试压、冲洗2013-8-302013-12-15Intermediate Tank Farm (03)Utility Building (04)管道安装2013-6-302
17、013-8-10查线、试压、冲洗2013-8-102013-11-10UnitDescriptionStartFinishHCC-240fa Unit (01)Piping Installation10-Aug-201330-Oct-2013Check Line, Hydro Test and Flushing30-Oct-201310-Dec-2013HFC-245fa Unit (02)Piping Installation30-Jun-201330-Oct-2013Check Line, Hydro Test and Flushing30-Oct-201315-Dec-2013Inter
18、mediate Tank Farm (03)Utility Building (04)Piping Installation30-Jun-201310-Oct-2013Check Line, Hydro Test and Flushing10-Oct-201310-Nov-20133.3 施工人员安排表 construction manpower schedule2013年2014年工种3月4月5月6月7月8月9月10月11月12月1月管工工长1224444221焊工工长1146666642起重工工长111111111起重工11244542焊工122221管工30609012012012040
19、4010无损探伤工488101010422管道焊工15304560606010105普工15304560606010105架子工68101288832013 2014 OccupationMarchAprilMayJuneJulyAug.Sep.Oct.Nov.Dec.Jan.Piping foreman1224444221Welding foreman1146666642Hoisting forman111111111craneman11244542welder122221Pipe fitter306090120120120404010NDT worker488101010422Pipe w
20、elder15304560606010105Labor15304560606010105scaffolder68101288834 施工准备 Construction Preparation4.1技术交底:开工之前对现场施工人员进行技术交底,使施工人员了解工程概况、工程内容、工期、质量要求、施工重点、难点、要点,明确自己在施工过程中所承担任务的工作责任,对需持证上岗的人员进行检查,对所有参加施工的人员进行三级安全教育。要求参加施工的人员认真阅读图纸,领会设计意图。熟悉工艺流程、管道的主要工艺参数(压力、温度、输送介质、腐蚀情况及管材、焊材)、设计说明及施工要求等。对施工图应进行详细审核,各个尺
21、寸、座标、标高是否错误、遗漏,所有管材、阀门及其它管配件与图纸是否相符,详细核对材料表中所列的材料和配件的材质、规格、数量等是否与图纸相符。在进场施工之前,对所有施工人员再次进行一次全面系统的教育,使施工人员对工程有较深的认识,加强施工人员的质量、安全、文明施工的意识。了解施工现场实际情况,及现场的基本急救设施和紧急集合点。Technical clarification: Technical clarification shall be made to field construction personnel before commencement to make them get to kn
22、ow project generals, content, work period, quality requirement, key points and difficulties, and to clarify each responsibilities and duties in construction. The operators with the certificate shall be checked, and make HSE training to all personnel involved in construction. Responsibility for perso
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 管道安装方案 中英文 完整版Pipeline Installation Plan 管道 安装 方案 完整版 Pipeline

链接地址:https://www.31ppt.com/p-3886491.html