1、 ENGINEERING STANDARD FOR START-UP SEQUENCE AND GENERAL COMMISSIONING PROCEDURES 试车程序This standard specification is reviewed and updated by the relevant technical committee on May 2004. The approved modifications are included in the present issue of IPS. CONTENTS : PAGE No. 0. INTRODUCTION.2 1. SCOP
2、E.3 2. REFERENCES.3 3. DEFINITIONS AND TERMINOLOGY.3 4. SYMBOLS AND ABBREVIATIONS.4 5. UNITS.4 6. GENERAL REQUIREMENTS.4 7. PREPARATION PRIOR TO INITIAL START-UP.5 7.1 Operational Check-Out.5 7.2 Hydrostatic Testing.6 7.3 Final Inspection of Vessels.9 7.4 Flushing of Lines.9 7.5 Instruments.11 7.6 A
3、cid Cleaning of Compressor Lines.12 7.7 Breaking-In Pumps.12 7.8 Breaking-In Compressors.13 7.9 Dry-Out and Boil-Out.14 7.10 Catalyst Loading.16 7.11 Tightness Test.16 8. NORMAL START-UP PROCEDURES.17 8.1 General.17 8.2 Prestart-Up Check List.18 8.3 Make Area Safe.18 8.4 Utilities Commissioning.18 8
4、.5 Air Purging and Gas Blanketing of Non-Catalytic Sections.18 8.6 Catalytic Units Reactor Section Air Purging and Gas Blanketing.19 8.7 Heat Exchanger Activation.20 8.8 Vacuum Test.20 8.9 Establish Flow in the Unit.20 8.10 Inhibitor/Chemical Injections.20 8.11 Adjust Operation to Obtain Quality.20
5、APPENDICES :APPENDIX A TYPICAL ACID CLEANING PROCEDURE FOR COMPRESSOR LINES.21APPENDIX B TYPICAL HEATER DRY-OUT PROCEDURE.23APPENDIX C TYPICAL CHEMICAL BOIL-OUT SEQUENCE.25 0. INTRODUCTION The Standard Practice Manuals titled as Fundamental Requirements for the Project Design and Engineering is inte
6、nded for convenience of use and pattern of follow-up and also a guidance. These Standard Engineering Practice Manuals also indicate the check points to be considered by the process engineers for assurance of fulfillment of prerequisitions at any stage in the implementation of process plant projects.
7、 It should be noted that these Iranian Petroleum Standards (IPS), as Practice Manuals do not profess to cover all stages involved in every process project, but they reflect the stages that exist in general in process projects of oil, gas and petrochemical industries of Iran. These preparation stages
8、 describe the following three main phases which can be distinguished in every project and include, but not be limited to: Phase I): Basic Design Stages (containing seven Standards). Phase II): Detailed Design, Engineering and Procurement Stages (containing two Standards). Phase III): Start-up Sequen
9、ce and General Commissioning Procedures (containing two Standards). The process engineering standards of this group include the following 11 Standards: STANDARD CODE STANDARD TITLE I) Manuals of Phase I (Numbers 1-7) IPS-E-PR-150 Basic Design Package and Recommended Practice for Feasibility Studies
10、IPS-E-PR-170 Process Flow Diagram IPS-E-PR-190 Layout and Spacing IPS-E-PR-200 Basic Engineering Design Data IPS-E-PR-230 Piping & Instrumentation Diagrams (P & IDs) IPS-E-PR-250 Performance Guarantee II) Manuals of Phase II (Numbers 8&9) IPS-E-PR-260 Detailed Design, Engineering and Procurement IPS
11、-E-PR-300 Plant Technical and Equipment Manuals (Engineering Dossiers) IPS-E-PR-308 Numbering System III) Manuals of Phase III (Numbers 10-11) IPS-E-PR-280 Start-up Sequence and General Commissioning Procedures IPS-E-PR-290 Plant Operating Manuals This Engineering Standard Specification covers: 1. S
12、COPE This Engineering Standard Specification covers minimum process requirements for plant start-up sequences and general commissioning procedures for Non-Licensed Units or facilities. For Licensed Units, instructions given by the Licenser shall be followed. Although, the start-up sequences and comm
13、issioning procedures differ to some extent from process to process, the basic philosophy and general aspects shall conform to the concepts of this Standard. However, considering the general commissioning and all activities to be performed prior to initial start-up as outlined in this Standard, feed
14、introduction to the Unit shall be according to the stepwise start-up procedure provided by the Contractor in the Unit Operating Manual. Note: This standard specification is reviewed and updated by the relevant technical committee on May 2004. The approved modifications by T.C. were sent to IPS users
15、 as amendment No. 1 by circular No. 231 on May 2004. These modifications are included in the present issue of IPS. 2. REFERENCES Throughout this Standard the following dated and undated standards/codes are referred to. These referenced documents shall, to the extent specified herein, form a part of
16、this standard. For dated references, the edition cited applies. The applicability of changes in dated references that occur after the cited date shall be mutually agreed upon by the Company and the Vendor. For undated references, the latest edition of the referenced documents (including any suppleme
17、nts and amendments) applies. API (AMERICAN PETROLEUM INSTITUTE) API Std. 650, Welded Steel Tanks for Oil Storage, English Edition Latest Edition, ASME (AMERICAN SOCIETY OF MECHANICAL ENGINEERS) ASME Code, Section VIII IPS (IRANIAN PETROLEUM STANDARDS) IPS-E-GN-100 “Engineering Standard for Units” IP
18、S-C-PI-350 Plant Piping System Pressure Testing IPS-E-PR-308 Numbering System 3. DEFINITIONS AND TERMINOLOGY Company or Employer/Owner Refers to one of the related affiliated companies of the petroleum industries of Iran such as National Iranian Oil Company (NIOC), National Iranian Gas Company (NIGC
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 南京 扬子 巴斯夫 一体化 石化 项目 IPS 试车 规范
![提示](https://www.31ppt.com/images/bang_tan.gif)
链接地址:https://www.31ppt.com/p-3863631.html