家乐福超市有限公司工程主合同范本.doc
《家乐福超市有限公司工程主合同范本.doc》由会员分享,可在线阅读,更多相关《家乐福超市有限公司工程主合同范本.doc(44页珍藏版)》请在三一办公上搜索。
1、Contractfor WorksbetweenChengdu Carrefour Supermarket Co. Ltd.and(Sub Contractor)工程合同签约人:*家乐福超市有限公司与(承包人)Contents of the Contract合同内容Item Description Page Cover pageContents of the ContractEmployer / ContractorDefinitionsGeneralContractEmployers facilitiesSite working & AccessCommencement & Completi
2、onInstructions & DecisionsAuthorized VariationsValuations of Authorized variationsNotices & ClaimsProperty in Materials & PlantsIndemnitiesMaintenance & DefectsInsurancePaymentDetermination of the ContractContractors DefaultsDisputesThe Contractors staff & Sub-contractorsSafety, Health, Security & H
3、ousekeeping on siteEnvironmental RequirementsNon-conformance & Corrective actionsSuspension of worksFinal Inspection & Hand-overWorking & Financial schedulesClaims from AliensBusiness Practices Non-waiver BondsGoverning LawLanguage条款名称 页数封面合同内容雇主/承包人定义一般协议合同雇主之设施施工及出入工地工程开始及完成指令与决定变更的认可Page: 3Page:
4、3变更的估价通知与索赔物料及建造工具的所有权赔偿保养与缺陷保险付款合同的解除承包人过错争议承包方的人员及分包人工地的安全, 卫生, 保安及清洁工作环保要求工程错误及修改工程停顿最後检验及移交工程及财务计划书外人的申索业务守则非弃权保证金适用法律语言THIS CONTRACT is made the _ day of _ 2003 BETWEEN a) Chengdu Carrefour Supermarket Co. Ltd.of/whose registered office is at *(hereinafter called the Employer) of the one part A
5、NDof/whose registered office is at(hereinafter called the Contractor) of the other partWHEREAS the Employer has entered into a Contract, particulars of which are set out in the First Appendix heretoAND WHEREAS the Contractor having been afforded the opportunity to read and to be aware of all the ter
6、ms in this contract, has agreed to supply all materials, labour, technical support, supervision team, tools, equipment and plant, transportation, consumables and any other means needed to execute, complete and maintain:hereto and which form part of the works to be executed by the Contractor under th
7、is Contract (hereinafter referred to as the Contract Works).NOW IT IS HEREBY AGREED as follows :1. DEFINITIONS1.1 In this Contract, all following words and expressions shall have the meanings given below unless otherwise provided herein:1.1.1 the Employer means the employer under the Contract as her
8、einafter defined, together with his servants, agents, employees and other representatives, particulars of which are given in the First Appendix hereto.1.1.2 the Employers Representatives shall mean the architect and/or engineer and/or surveyor and/or other party or parties named in the First Appendi
9、x hereto, or such other persons as may be notified from time to time in writing by the Employer to the Contractor, being the parties appointed expressly or impliedly under their Contracts to be the Employers principal representatives.1.1.3 the Period for Completion shall mean the period or periods f
10、or completion of the Contract Works as specified in the Second Appendix hereto.1.1.4 the Contract Price means the sum specified in the Second Appendix hereto as payable to the Contractor for the Contract Works.The Contract Price is a lump sum price.1.1.5 “the Lump Sum Price” includes, but is not lim
11、ited to the costs of the completed works, all taxes and charges, overhead and profit, other similar expenses and fees related directly and / or indirectly to any endorsement until final approval to be obtained from all concerned government offices needed for the completion of works under the Contrac
12、t.The Contractor is responsible for the quantity.Any difference of quantity will not be entertained or considered.1.1.6 “the Unit Rates” will only be utilized for any variation of works: addition or deduction of works.Those items of variation that do not have reference of unit rate basis shall be th
13、e rate provided by the local Quota Book issued by the Province Construction Commission and / or with negociated discount.1.1.7 the Site means the lands and other places provided by the Employer for the purpose of the Contract Works as hereinafter defined.1.1.8 “the Cost Center” means the area where
14、the Contract Works are to be executed, completed and maintained upon the priority and urgency of completion. Decoration&installation work1.1.9 the Contract means this document together with such other documents as are specified in the Third Appendix hereto, but excluding any standard printed conditi
15、ons of the Contractor which may be included in such other documents, unless those standard printed conditions have been separately specified within the Third Appendix as to form part of the Contract.1.1.10 the Contract Works means all the works described in the Contract, unless otherwise stated and
16、as are specified in the First Appendix hereto.1.1.11 “the Contractor” above named shall be an independent Contractor and shall not employ any person related directly or indirectly with the employees of the Employer in any respect.1.1.12 “the Supervision” means the company with a construction supervi
17、sory qualification and is entrusted by the Employer with the task and responsibility to represent the Employer and to supervise the Contract Works under the Contract in accordance with the Construction laws, rules and regulations.1.1.13 “the Design Institute” means the company with a construction de
18、sign qualification and is entrusted by the employer to design the Contract works under the Construction laws, rules and regulations.1.1.14 “the Quantity Surveyor” means the company with a cost consulting qualification and is entrusted by the Employer to perform the cost control for the project.1.2 W
19、ords importing the singular also include the plural and viceversa where the context requires.1.3 The headings, marginal notes and any user notes of this Contract shall not be deemed to be part thereof or taken into consideration in the interpretation or construction thereof or of the Contract.1.4 Al
20、l references herein to clauses are references to clauses numbered in this Contract and not to those in any other document forming part of the Contract unless otherwise stated.2. GENERAL2.1 The Contractor shall execute, complete and maintain the Contract Works in accordance with the Contract and to t
21、he reasonable satisfaction of the Employer and of the Employers Representatives.2.2 The Contractor shall provide all expertise, management, staff, labour, materials, constructional plant, temporary works, working drawings and details and everything whether of a permanent or temporary nature required
22、 for the execution, completion, maintenance of the Contract Works, except as otherwise agreed in accordance with Clauses 3.1 and 3.2.2.3 The Contractor shall not assign the whole or any part of the benefit of this Contract nor sublet the whole of the Contract Works without the previous written conse
23、nt of the Employer.Provided always that the Contractor may without such consent assign either absolutely or by way of charge any sum which is or may become due and payable to the Contractor under the Contract.2.4 The Conditions of this Contract shall prevail over those of any other document forming
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 家乐福 超市 有限公司 工程 合同范本

链接地址:https://www.31ppt.com/p-3682833.html