1、Form:SWI-F0402BRevision:Rev 0Construction ContractorsPROJECT TITLE:SUBCONTRACTORS NAME:TRADE/SUBCONTRACT PACKAGE:Health & Safety PackTABLE OF CONTENTS:PREAMBLE1.0INTRODUCTION2.0SAFETY POLICY3.0ROLES AND RESPONSIBILITIES4.0DOCUMENT CONTROL5.0HAZARD IDENTIFICATION & RISK ASSESSMENT6.0JOB SAFETY ANALYS
2、IS7.0SKILLS AND COMPETENCIES8.0OHS INDUCTION9.0WORKERS COMPENSATION & REHABILITATION10.0ELECTRICAL11.0HAZARDOUS SUBSTANCES12.0LIFTING GEAR13.0PLANT14.0PERSONAL PROTECTIVE EQUIPMENT (PPE)15.0FIRE PROTECTION16.0TOOL BOX TALKS17.0FIRST AID18.0INCIDENT/ACCIDENT REPORTING19.0ALCOHOL & OTHER DRUGS20.0 Wor
3、king At Heights21.0Emergency Response22.0HSE FormsPreambleThe Contractor Health & Safety Pack has been developed to help formulate a standardized approach to safety management in the construction industry. The Contractor Health & Safety Pack, or its equivalent, is the minimum health and safety requi
4、rement for Contractors who engage in work with African Minerals LimitedThe contents of the Pack may not apply to each and every contract trade. The Pack is designed to assist a company which has no safety management system by providing a standardised approach to help develop such a system. The Pack
5、is not designed to replace the existing safety management system of a company. Where such a system exceeds the requirements of the Contractor Health & Safety Pack then the forms and other documentation provided by such a system will be accepted provided they exceed Health, Safety and Rehabilitation
6、requirements outlined in this Pack.The Company signing this document shall be known throughout the document as the Company except where the Companys name is to be entered.1.0 IntroductionThis document sets out the safety management strategy to be adopted by Insert Company nameduring the course of th
7、e contract on the Insert tradeInsert site nameproject managed by .Insert Principal Contractor nameThe document is not designed to replace the Schedule of Health & Safety requirements as stated in the Special Conditions of Contract, but will be used to provide verification of the actions of . in rela
8、tion to these requirements. Insert Company nameThis document and subsequent additions will be made available to African Minerals Limited for review and auditing purposes. 2.0Company DetailsName of Company:Address:Phone: Fax:Email:Mobile:Will provide as the Project Manager responsible for supervision
9、 of the Scope of Works and its Health and Safety programmes.Our peak number of employees on the site will be:This Company does/does not intend to subcontract all or part of the works.Trade Name:Contract Job Number: Managing Director/General Manager: Address: Phone: Fax: Email:Mobile: Scope of Work:H
10、EALTH & SAFETY POLICYAt . our Health & Safety Policy is based on a belief that the well-being Insert Company nameof people employed at work, or people affected by our work, is a major priority and must be considered during all work performed on our behalf. People are our most important asset and the
11、ir health and safety is our greatest responsibility. The public shall be given equal priority to that of our employees.The objectives of our Safety Policy are: To achieve an accident and incident free workplace. To make health & safety an integral part of every managerial and supervisory position. T
12、o ensure health & safety is risk managed in all planning and work activities. To involve our employees in the decision making processes through regular communication, consultation and training. To provide a continuous program of education and learning to ensure that our employees work in the safest
13、possible manner. To identify and control all potential hazards in the workplace through hazard identification and risk analysis. To ensure all potential accident/incidents are controlled and prevented. To provide effective injury management and rehabilitation for all employees.The success of our hea
14、lth & safety management is dependent on:1. Pro-active planning of all work activities with due consideration given to implementing H&S controls that are suitable to each given situation.2. Understanding the total work process and associated H&S risks.3. Ensuring the work team is totally committed to
15、 achieving our objectives.4. Ensuring that open and honest communication exists between management and all employees. . ././DIRECTORs NAME SIGNATUREDATE. . ././PROJECT MANAGERs NAME SIGNATUREDATE3.0ROLES AND RESPONSIBILITIESThe Company will provide the following key personnel on site. Their roles. a
16、nd responsibilities regarding safety on site are outlined below. Project Manager. is responsible for the health and safety on the project and duties include:Insert name-implementing the company Health, Safety and Rehabilitation procedures;-using the principles of the Hierarchy of Controls (Best to W
17、orst guide in this pack) in all design, fabrication and construct activities to minimise the risk to all personnel in the workplace;-carrying out a design review with the AML ECF Project team to assist in the identification of further risk reduction controls measures. -participating in the planning
18、and design stages of trade activities;-stimulating a high level of safety awareness at all times;-identifying safety training needs;-leading by example;-ensuring safe equipment and plant is provided and maintained;-ensuring correct and safe work practices at all times;-assisting in the identificatio
19、n and preparation of safe work procedures;-reviewing safety reports and inspections and initiating rectification where necessary;-participating in accident/incident investigations;-participating in safety meetings and programs;-monitoring compliance with safe work methods (controls);Site Supervisor.
20、 duties include:Insert name-implementing the company Health, Safety and Rehabilitation procedures;-observing all H&S requirements and Statutory rules and regulations;-ensuring that all works are conducted in a manner safe and without risk to employees health and safety;-planning to do all work safel
21、y;-providing advise and assistance on H&S to all employees;-participating in the planning and design stages of trade activities;-ensuring current H&S and other relevant legislative requirements are met in the workplace;-identifying H&S training programs in advance and allow for employee/s identified
22、 as requiring training to attend the training;-actioning safety reports and carrying out workplace inspections;-preparing and participating in safety meetings and safety programs;-facilitating the preparation of Work Method Statements and Job Safety Analysis for the trade;-insisting and ensuring on
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 建筑承包商健康和安全资料 Construction Contractors Health Safety Pack 非洲矿业有限公司AML HSE安全管理
链接地址:https://www.31ppt.com/p-3029282.html