METHOD STATEMENT OF GROUNDING SYSTEM INSTALLATION.doc
《METHOD STATEMENT OF GROUNDING SYSTEM INSTALLATION.doc》由会员分享,可在线阅读,更多相关《METHOD STATEMENT OF GROUNDING SYSTEM INSTALLATION.doc(13页珍藏版)》请在三一办公上搜索。
1、METHOD OF STATEMENT FOR GROUNDING & LIGHTNING SYSTEM INSTALLATION/ BIN PHP THI CNG H THNG TIP A V CHNG ST.1. AIM/ MC TIU:To describe Electrical works associated with installation of Grounding System / Lightning Protection System. Nhm m t cng tc in lin quan ti lp t h thng ni t v chng st.The Grounding
2、 System / Lightning Protection System are designed to ensure the complete safety of both persons and equipments throughout the airport terminal and all associated building and facilities.H thng ni t/chng st c thit k nhm bo m s an ton cho c con ngi v thit b tt c ta nh v phng tin lin quan.Due to BS-66
3、51 for lightning protection standard, required earth resistance lightning directly below 10 Theo tiu chun BS-6651 v h thng chng st yu cu in tr ni t h thng chng st trc tip di 10 .2. SCOPE OF WORKS/ PHM VI CNG VIC:This method statement covers works as shop drawing indicated and schedule. Bin php thi c
4、ng ny bao gm nhng cng vic theo nh tin v bn v thi cng ch r.3. REFERENCES/ THAM KHO:o Specification/ c tnh k thut: ? Chapter?o Shop drawings/ Bn v thi cngo BS-6651 standard/ Tiu chun BS-6651 ?o Phn mm tnh ton h thng tip t ca Loresco-Mo Van ng th ca LPI- c?.au/LPIProducts/EarthingandBonding.aspx4. OPTI
5、MAL DESIGN TO REDUCE POWER BACK LAND/TI U THIT K NHM GIM IN TR To Original lightning position design of the roof will not change. From the air terminal position on the roof to escape lightning ground wire connected to each copper earth rod separately.Phn trn mi s gia nguyn thit k ban u. T cc v tr ki
6、m thu st trn mi nh i dy thot st xung t ni vi tng cc ring l.o Connected copper grouding rods in to the Ground Network by bare copper cable M50Tin hnh kt ni cc cc li bng cp ng trn M50 thnh mt h thng chung.o Changes to copper bonded grounding rod to pure copper grounding rodThay i cc tip t t loi cc m n
7、g sang loi cc ng nguyn cht.o The Buildings have four grounding rods 16 (BR, HP, S4, BS), 3 meters long will bed added more rods to reach earth resistance lightning below 10 . The distance between 2 rods 2 times the length of rod and enhancing put chemical for the trench 5 package/building(1 pack = 2
8、2.7 kg).Nhng nh c thit k ng 4 cc tip a 16 (BR, HP, S4, BS), di 3m s c ng thm cc t in tr t nh hn 10 . Khong cch gia hai cc 2 ln chiu di cc v tng cng ha cht rnh mi nh 5 bao (1 bao = 22,7 k).o The Building have 6 to 8 grounding rods 16 (AR, CF, RB, SR), 3 meters long will bed added more 6 rods 16, leng
9、th 3m. The distance between 2 rods 2 times the length of rod and enhancing put chemical for the trench 7 package/building(1 pack= 22.7 kg).Mt s nh hin ang ng 6 n 8 cc tip a 16 (AR, CF, RB, SR), di 3m s c ng thm 6 cc tip a 16, di 3m. Khong cch gia hai cc 2 ln chiu di cc v tng cng ha cht rnh mi nh 7 b
10、ao (1 bao = 22,7 k).o The Buildings are located closely as the AR-BR-S41 and SR, BS, BR can be linked together by M50 bare copper wire to reduce the earth resistance of the whole system down. To prevent the occurrence of voltage difference in the area of land next to areas where they can use Equipot
11、ential Clamps to linking the two systems to eliminate this voltage difference.Nhng nh c v tr gn nhau nh AR-BR-S41 v SR, BS BR c th lin kt cc nh li vi nhau nhm gim in tr ni t ca c h thng xung thp. ngn nga vic xut hin s chnh lch in p trong khu vc tip t i vi khu vc ni chung c th s dng van ng th (Equipo
12、tential Clamps) lin kt hai h thng nhm loi b s chnh lch in p ny5. SEQUENCE OF WORKS/ TUN T CNG VIC:5.1 Material and Equipment/ Vt t v thit b:1) Copper earth rods/ Thanh ci ni t bng ng.2) Bare copper cable/ Cp ng trn.3) Cable clamp for earth rod and copper cable/ Kp dy cp cho thanh ci ni t v cp ng.4)
13、Copper tape and clips/ Bng keo v kp bng ng.5) PVC pipe/ ng PVC.6) Concrete grounding pit/ H b tng.7) Cable lugs/ u ct.8) Air terminal/ Kim thu st9) Earth bar with disconnecting link/ Thanh ci ni t km mi lin kt ngt10) Furse Weld/ Mi hn.11) Earth Tester/ Dng c kim tra ni t.12) Welding Machine/ My hn.1
14、3) Welding rod/ Que hn.14) Field Tester/ Dng c th ti cng trng.5.2 Type of connection/ Phng php kt ni: o Connect earth rod to bare copper wire ( Detail-1 ).Kt ni thanh ci ni t vo dy ng trn. (Bn v chi tit-1)o Connect rebar to bare copper wire (Detail-2).Kt ni thanh ct thp vo dy ng trn (bn v chi tit-2)
15、o Connect copper bar to bar copper wire ( Detail-3 ).Kt ni thanh ng vo dy ng trn. (Bn v chi tit-3).o Connect cable trays/ladders and pipes to grounding system (Detail of electric continuity for cable tray shall be provided in method statement for trays/ladders installation.).Ni mng cp/ thang cp v ng
16、 cp vo h thng ni t (Bn v chi tit tnh lin tc cho mng cp c cung cp trong bin php thi cng lp t mng cp/ thang cp).5.3 Procedure of installation of Grounding System/ Quy trnh lp t h thng ni t: 5.3.1 Installation of Exothermic Welding System/ Lp t h thng hn nhit:The mould crucible with suitable size shall
17、 be used for exothermic welding.Khun nung vi kch thc ph hp s c s dng cho hn nhit.a) The following procedures shall be followed before conduct the exothermic welding. Quy trnh sau s c theo di trc khi tin hnh hn nhit.i) Ensure that the mould is always clean and free of moisture.Bo m rng khun lun sch v
18、 khng mii) Ensure that the tap hole is always in well-defined condition.Bo m rng l bt trong tnh trng c xc nh.iii) Ensure that the correctness of connection selector.Bo m tnh chnh xc ca b chn la u ni.iv) Ensure that the correctness of welding powderBo m tnh chnh xc ca bt hn.b) Procedure to conduct th
19、e exothermic connections.Quy trnh tin hnh mi ni ta nhiti) Fix the connection selector to the handle clamp as per the require sizes of conductor to be welded.Gn b chn la u ni vi cht iu khin nh trn kch thc yu cu ca dy dn hn.ii) Place the conductor in the mould, ensure that connection selector is used
20、in accordance to the conductor to be welded.t dy dn trong khun, bo m b chn la u ni c s dng tng ng vi dy dn hn.iii) Close the handle clamp and lock in the lock position, drop the metal retaining disc into the bottom of the mould crucible. Ensure that the metal retaining disc is correctly, completely
21、seated and cover up the tap hole.ng cht iu khin v kha cht li, h bn gi kim loi gn vo y khun nung. Bo m rng bn gi kim loi cha ng, v ph l bt.iv) Deposit the welding power into the crucible and spread a little amount on top of the mould edge as a role of starting power.Ph bt hn ln ni nung v phn tn mt t
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- METHOD STATEMENT OF GROUNDING SYSTEM INSTALLATION
链接地址:https://www.31ppt.com/p-3023684.html