05194OEE Overall Equipment Effectiveness.ppt
《05194OEE Overall Equipment Effectiveness.ppt》由会员分享,可在线阅读,更多相关《05194OEE Overall Equipment Effectiveness.ppt(33页珍藏版)》请在三一办公上搜索。
1、Overall Equipment Effectiveness(OEE),Definitions and Calculations,Definitions,Overall Equipment EffectivenessA measure of the equipments effectiveness in producing parts.It is determined by three factors:Equipment AvailabilityPerformance EfficiencyQuality Rate,Definitions,Equipment Availability The
2、efficiency of the machine with respect to the time the machine was available.Performance Efficiency A measurement of both speed losses and losses associated with idling or minor interruptions resulting from blocked or starved conditions.Quality Rate The efficiency of the machine with respect to the
3、number of defects produced.,Definitions,Total Available Time The total time from start of shift to end of shift.Planned Downtime The time the machine is down due to contractual breaks.Net Available Time The time the equipment is planned to operate during the shift.,Definitions,Operating Time The tim
4、e that the equipment actually operates.Net Operating Time Operating time less the Starved&Blocked time.Note:Starved&Blocked losses affect machine performance,not availablity.,Definitions,Total Parts Run The total number of parts produced on the machine during the shift(including defects).Total Defec
5、ts The total number of rejected,reworked,or scrapped parts produced during the shift.,Definitions,Ideal Cycle Time(seconds per part)The lesser of(i.e.the better of):The design cycle time of the machineThe best cycle time ever achieved and sustained on the machineAn estimate based on experience with
6、similar machinesActual Cycle Time The part-to-part time the machine is running at.,Definitions,Breakdown Time The total time the machine is stopped because of malfunction.Includes the time that the machine is being repaired and tested,until it is ready to operate.Setup Time The total time that the m
7、achine is stopped to prepare to run a different part or to alter the machine to meet end product specifications.,Definitions,Tool Change Time The total time that the machine is stopped due to failure,breakage,deterioration,or wear of a machine tool.Stop Time The total time the machine is stopped due
8、 to interruptions in the process flow requiring operator or job setter intervention.,Definitions,Starved and Blocked Time The total time the machine is stopped due to starved and blocked conditions.Startup Time The total time the machine is stopped,irrespective of cause,during the first hour of the
9、shift.,Definitions,Speed LossesThe lost production time resulting from the operation of the equipment at less than ideal speed.Idling&Minor Stoppage Losses The lost production as a result of minor interruptions in the process flow(losses due to Starved&Blocked conditions).,Sample Baseline Input Data
10、,Total Available Time1100 minPlanned Downtime 100 minBreakdowns*100 minSetup*100 minTool Change*200 minStops*100 min Starved&Blocked*50 minStartup 50 min*=Includes Startup values,Sample Baseline Input Data,Total Parts Run 350 piecesTotal Defective Parts 50 piecesIdeal Cycle Time 0.5 min/pieceActual
11、Cycle Time 1.0 min/piece,OEE Calculations(Launch Plan Page 10),Net Available Time=Total Available Time-Planned Downtime=1100-100=1000 minDowntime=Breakdowns+Setup+Tool Change+Stops=100+100+200+100=500 minOperating Time=Net Available Time-Downtime=1000-500=500 min,OEE Calculations,Equipment Availabil
12、ity=Operating Time/Net Available Time*100=500/1000*100=50%Performance Efficiency=(Ideal Cycle Time*Total Parts Run)/Operating Time*100=(0.5*350)/500*100=35%Quality Ratio=(Total Parts Run-Total Defective Parts)/Total Parts Run*100=(350-50)/350*100=85%,OEE Calculations,Overall Equipment Effectiveness=
13、Equipment Availability*Performance Efficiency*Quality Ratio/10000=50*35*85/10000=15%,Major Losses Calculations-Pieces,Breakdown=Breakdowns(min)/Ideal Cycle Time=100/0.5=200 piecesSetup=Setup(min)/Ideal Cycle Time=100/0.5=200 piecesTool Change=Tool Change(min)/Ideal Cycle Time=200/0.5=400 pieces,Majo
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 05194OEE Overall Equipment Effectiveness 05194 OEE
链接地址:https://www.31ppt.com/p-2989968.html