试井设备介绍英文课件PPT introductionofwelltestingtechnique.ppt
《试井设备介绍英文课件PPT introductionofwelltestingtechnique.ppt》由会员分享,可在线阅读,更多相关《试井设备介绍英文课件PPT introductionofwelltestingtechnique.ppt(55页珍藏版)》请在三一办公上搜索。
1、,Introduction of Well Testing Techniques,March 7,2023,Contents,Definition,Purposes and Tasks of Well TestDevelopment Phases of Well TestMain Operations of Well TestTechnique of Formation TestTechnique of Surface Well TestPreventing Formation Damage during Testing,Definition,Purposes and Tasks of Wel
2、l Test,Well Test is a technologic process performed for those possible hydrocarbon or water zones.In this process,using a set of special equipments and tools to reduce the pressure of fluid column in the well,inducing formation fluids to flow into the well hole and finally obtaining the data of prod
3、uctivity,pressure,temperature,fluids properties,and other formation parameters.,Definition,1)to prove whether the new area and structure have commercial oil and gas.2)to determine the level of oil-bearing and gas-bearing,oil/gas/water boundaries,production capacity and drive mechanism in a reservoir
4、.3)to verify the reliability of logging interpretation.4)to obtain data of fluids properties and reservoir physical properties,determine reasonable production program,supply a basis to reserves calculation and development planning.,Definition,Purposes and Tasks of Well Test,Purposes and Tasks of Wel
5、l Test,First Phase Represented by conventional well testing technique,featuring with Wireline Conveyed Perforating(电缆射孔)and Swabbing(抽汲).Second Phase Represented by formation tester technique,featuring with DST using MFE,HST,APR,PCT testers.Third Phase Represented by combining formation tester techn
6、ique and other techniques,featuring with performing several operation by one trip of pipe string,such as DST+TCP,DST+TCP+SRO(Surface Read Out),DST+SWT(surface well test),and DST+TCP+EP(ejector pumping)etc.,Development Phases of Well Test,wiper tripping find bottom(通井、探井底)well flushing(洗井)pressure te
7、sting(试压)perforating(射孔)formation fluids inducing(诱导地层流体)productivity measuring(求产)formation pressure measuring(测压)well killing(压井)layer plugging and well abandon(封层和封井),Main Operations of Well Test,Running wiper tool into well hole to 1)wipe and clean out solid materials adhering on casing wall,2)c
8、heck through diameter,deformation and breakage of casing,3)check whether the artificial well bottom meets the needs of well test or not,and 4)adjust the properties of kill fluid to meet the need of perforation.,Wiper Tripping&Find Bottom(通井、探井底),Circulating fluid through the well by pump unit to 1)m
9、ake well bore clean,clean out solid materials,heavy oil and wax adhering on casing wall;2)adjust the properties of kill fluid to meet the need of perforation,and prevent dirty fluids inject into formation while formation is perforated.,Well Flushing(洗井),For different purposes,there are Direct Flushi
10、ng(正洗井)and Back Flushing(反洗井)two ways of Well Flushing.,Direct flushing,Back flushing,Well Flushing(洗井),Pressure Testing(试压),Using pump unit to make well hole and wellhead to bear a certain pressure to 1)check quality of cement job 2)check seal ability of casing and wellhead,Shooting the casing with
11、 explosives to form holes which communicate formation and well hole and make fluids flowing path.Operating ways of perforating are classified as WCP(Wireline Conveyed Perforating)and TCP(Tubing Conveyed Perforating).,Perforating(射孔),TCP,Perforating-TCP,It is a process to drop height of fluid column
12、and decrease fluid density in the well,make fluid column pressure less than formation pressure and then,cause formation fluids to flow into well hole or even blow out surface.General ways of Inducing have displacement(替喷),swabbing(抽汲),bailing out(提捞),gas lifting(气举),and water-gas mixture lifting(混气水
13、气举).,Formation Fluids Inducing(诱导地层流体),It is a process to measure productivity of oil,gas and water under a certain producing pressure drop by using a set of equipment and tools.Producing pressure drop is controlled by routine of productivity measuring work(求产工作制度).Routine of swabbing can be describ
14、ed as swab running times per day,swabbing depth,depth of producing fluid level.Routine of a gusher(自喷井)can be described as choke size,tubing head pressure and surface casing pressure.,Productivity Measuring(求产),Using downhole pressure gauge to measure and record formation pressures and formation tem
15、perature.,Formation Pressure measuring(测压),Using downhole pressure gauge to measure and record formation pressures and formation temperature.,Formation Pressure measuring(测压),Using killing fluid to make formation pressure balanced or overbalanced by pressure of fluid column in the well hole so as to
16、 ensure down-hole operations safely.,Well Killing(压井),Layer Plugging means sealing or isolating a test layer temporarily or permanently to ensure that no interference in other testing layers which will be performed.General layer plugging ways:sand filling(填砂),cement plugging(注水泥塞),and bridge pluggin
17、g(桥塞).Well Abandon means plugging a no commercial production well permanently.Generally,use two cement plugs to abandon a well.,Layer Plugging and Well Abandon(封层和封井),Technique of Formation Test,There are DST(drill stem test)and WFT(wireline formation test)two types of formation test operation.Norma
18、lly,the words used in the field,DST is belonged to well test operation services,WFT is belonged to logging operation services.,Technique of Formation Test-DST,Key tools of DST include tester(valve),packer,pressure gauge.Use drill string or tubing string to run DST tools into the well.First,setting p
19、acker to isolate testing layer from kill fluid and other permeable layers,then the valve is opened and closed several times,the formation fluids pressure build-up and drop-off are continuously recorded on a chart of pressure versus time.,The principle of DST operating,Technique of Formation Test-DST
20、,Controlled by raising and lowering pipestringMFE(Multi Flow Evaluator),Johnston companyHST(Hydraulic Spring Tester),Halliburton companyControlled by annulus pressurePCT(Pressure Controlled Tester),Johnston companyAPR(Annulus Pressure Responsive),Halliburton company,Commonly used test valves,Techniq
21、ue of Formation Test-DST,For open-holes and cased-holes,there are single-packer DST and straddle DST two commonly used operating ways.Single-packer DST(单封隔器测试)It is applicable for a single testing layer or multi-layer combined testing.Straddle DST(跨隔测试)It is applicable for a testing layer need to is
22、olate from other underlaid open layers by using two packers.,Commonly used operating ways of DTS,Technique of Formation Test-DST,Commonly used operating ways of DTS,SAWZ-2井测试管柱,The functions of different flow and shut-in periods,Initial flowTo release the higher pressure caused by overblance pressur
23、e of kill fluid during drilling and induce formation fluids to flow into the well.It takes 5-20 minutes normally.Initial shut-inTo buildup formation pressure after initial flow(a short term flowing,no much producing energy lost)to ensure the final pressure measured at this period approximate to init
24、ial formation pressure.,Initial flow,Initial shut-in,Technique of Formation Test-DST,valve opening,valve closing,Technique of Formation Test-DST,The functions of different flow and shut-in periods,Second flowFlowing enough time to ensure to obtain the data of formation fluids properties and producti
25、vity.Second shut-inRecording buildup pressure in a relative long term to ensure that formation parameters can be acquired by pressure records interpretation.,second flow,second shut-in,valve opening,valve closing,A:Initial pressure of kill fluid column,B1-C1:Initial flow,A-B1:Valve opening,C1-D1:Ini
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 试井设备介绍英文课件PPT introductionofwelltestingtechnique 设备 介绍 英文 课件 PPT
链接地址:https://www.31ppt.com/p-2977238.html