轮舵机修理工艺(附图).doc
《轮舵机修理工艺(附图).doc》由会员分享,可在线阅读,更多相关《轮舵机修理工艺(附图).doc(7页珍藏版)》请在三一办公上搜索。
1、MV *Procedure Specification of Steering Gear Repair 1,修理前先进行舵机运转试验检查运动部件的运行情况。Before repair, we will do the steering gear running test to check the running condition.2,进坞后先测量上下舵钮的间隙,上舵承间隙测量,数据记录。舵杆与舵叶联接平面检查,紧配螺栓检查,确定舵杆与舵叶的联接情况。测量重磅平面至撞杆柱塞中心线的高度数据记录。测量撞杆柱塞与十字头的间隙A、B两位置。测量舵叶与假舵的间隙C、D两位置。测量舵杆中心至撞杆柱塞销的距
2、离。(如图1).After drydocking, measure and record rudder pintles clearances and rudder carrier clearances, check the condition of flanges & bolts that connect rudder stock and rudder blade to know how about the connection, Measure and record the distance between ram center line and foundation flange surf
3、ace, measure and record upper clearance & lower clearance AB between ram and tiller fork, measure and record the jumping clearances CD, measure and record the distance between rudder stock center line and Ram pin.图1. 原始数据测量示意图 (drawing for measurement)3,拆除上下舵钮,拆除舵杆与舵叶平面联接紧配螺栓。舵叶吊离船体放妥。Dismantle rudd
4、er pintles, and dismantle the bolts connecting rudder stock flange and rudder blade flange, then lift rudder blade away.4,拆除转舵十字头,拆除转舵轴承总成。测量舵杆轴径,轴承直径,检查平面轴承的贴合面,平面轴承包扎好吊车间放妥。Dismantle rudder tiller and ruuder carrier assembly, measure and record the diameters of rudder stock and rudder carrier bush
5、, check the condition of plane bearing, then pack the plane bearing and transport it to workshop.5,坞修钳工用拉线方法测量假舵上平面至重磅法兰底座的距离允许误差1mm。Measure and record the distance between upper surface of rudder horn and foundation flange by drawing wire, allowed error is within 1mm.6,轮机钳工测量左、右液缸柱塞与压紧密封函法兰的间隙数据记录。
6、以四周壁拉出液缸柱塞的十字线。Measure and record clearance between rams (both sides) and stuffing flanges. To position 4 reference points on 4 sides wall by drawing wire, and mark them, that will be used for positioning the steering gear when refit them later.7,转舵液缸地座前割除前,必须进行加强用。133mm的管子,横向烧焊加强。Before cutting the
7、 steering gear with its foundation frames (both sides), we will weld pipes (dia, 133mm) to the both sides frames to strengthen the whole set to prevent deformation.8,转舵液缸底座焊缝烊掉后,轮机钳工复测左、右液缸柱塞与压紧密封函法兰的间隙前后数据比对。转舵液缸总成连底座一起移至船体可施工即可。After cutting the steering gear with frames, measure and record cleara
8、nce between rams (both sides) and stuffing flanges again, compare these new data with that of point 6. The steering gear with frames will be removed aside until we have enough space to do the steel job.9,船体可以进行舵承甲板换板工程。并新制平面轴承重磅法兰底座。Now we will start the deck plate renewal, and fabricate new foundat
9、ion flange.10,通过拉线初步确定重磅法兰底座的位置,应考虑法兰平面的机加工的切削余量加上先前测量的重磅平面至撞杆柱塞中心线的高度及A、B两点的间隙及舵叶与假舵的间隙C、D两位置数据,通过分析计算最后确定高度。拉线方法可以把上下舵钮作为基准参照,但前提条件是上下舵钮轴承不能磨损太多,否则就要破坏轴承以本体孔为标准。正确的拉线方法是以尾轴中心线为基准点过上下舵钮中心引上去的一根直线。(根据具体情况再确定)Do calculation according to data of point 2 and point 5, we will position the new foundation
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 舵机 修理 工艺 附图
链接地址:https://www.31ppt.com/p-2929946.html