1、 BC040: ObjectivesIf I were to introduce the R/3 System to my company, as an IT manager I would ask the following questions:What makes SAP R/3 stand out from the applications that we are currently using?andWhat are the decisive factors for a successful implementation of an SAP R/3 System based on th
2、e experience of several thousand installations?Dr. Uwe HommelDirector of TCC Center SAP AG Course BC040 Covers:Topics central to the technical implementation of R/3The functionality for administering, configuring, and monitoring the R/3 SystemParticular aspects of R/3 Client/Server architecture from
3、 the point of view of computing center operation Policies, procedures, roles, and responsibilities Training and educationThis course gives you comprehensive preparation for your technical R/3 implementation project The technical R/3 Implemenation, OverviewThe typical tasks of an IT operation from th
4、e SAP R/3 point of viewBackground information with respect to the SAP architecture conceringService AreasOverview of Software LogisticsBackground information with respect to the SAP architecture conceringSoftware LogisticDesktop Management, Installation Scenarions (I)Desktop Management, Installation
5、 Scenarions (II)Background information with respect to the SAP architecture conceringDesktop ManagementAbout BC040 - Contents Descriptiono As client/server technology has increased in importance, the task of handling and maintaining the end devices and servers has also become more important. o When
6、you plan a desktop management scenario, you should develop strategies and procedures for using the SAP frontend software.o These strategies and procedures can also be applied to other standard software.o To achieve a uniform desktop configuration, your company must have standards that define a minim
7、um configuration for end devices. Compare your companys existing standards with the SAP requirements for desktops. o Users can be assigned to groups for specific tasks or areas. To do this, you define user profiles, which authorize users to use specific functions. For example, users working in bookk
8、eeping use different functions than users working in human resources management, and therefore need different user profiles. o Hardware planning forms the basis for your desktop configuration. With each new installation, a PC is set up to conform to your companys standards. Take into account the sys
9、tem requirements for SAP Frontend Software.o Each frontend is connected to R/3 through the network, so you must consider which network product is appropriate. See the information brochure “SAP-supported Network Products”.o Your installation strategy influences both the initial installation and the u
10、pgrade strategy, and is an important factor in desktop planning. o SAP Frontend Software can be installed from a local CD-ROM drive, from a server, or to a server (server installation). Each installation strategy has particular advantages and disadvantages, and depends on the network infrastructure
11、and the size of the R/3 System.o 1. Local installation of the SAP Frontend Software from a CD-ROM drive. The software is installed manually on each PC. If the software has to be installed on a large number of desktops, this method is very inefficient.o 2. Installation of the SAP Frontend Software fr
12、om a file server.This method is more efficient. The CD-ROM is made available in the CD-ROM drive of the server or copied to the servers hard disk. The SAP Frontend Software for each desktop is installed from the server. You must ensure that there is sufficient space on the desktop. For more details,
13、 see the SAP Frontend Software installation guide.o With this installation strategy, a high load is only placed on the network during the installation. As the SAPGUI is still available locally, no additional load is placed on the network during productive operation. In addition, the desktops do not
14、depend on the availability of the server.o 3. The SAP Frontend Software is installed directly on the server. A server setup is performed on each desktop in order to install icons pointing directly to the SAPGUI installed on the server. o The space required on each desktop is less (a few KB for the i
15、cons), but the server must have sufficient hard disk space to install the SAP Frontend Software. o The network load is increased because every time SAPGUI is called, the SAPGUI is loaded into desktop memory. This affects the server capacity and network topology, so you should consider this in your n
16、etwork planning.o R/3 documentation is delivered on CD-ROM, and can be used online. You should plan how best to make the documentation available to end users.o You can either make the documentation CD available in a CD-ROM drive, connected to the server, or copy all the documentation to the server.
17、For performance reasons, it is better to copy the documentation to the server. Make sure that there is sufficient space on the server. See the installation guide for more details.o Planning printing infrastructure o It makes little sense to provide each user with his or her own printer connected dir
18、ectly to the desktop. One printer can normally be used by all the people in one office or department. In order to increase the efficiency of printers, make then accessible through the network, and place them in a central location.o You must also consider how your companys standards affect the use of
19、 different different printer types in different departments. Departments must decide whether they require several different printers.o The expected print volume is an important factor in planning. The printers used and the print server must be able to cope.o The network infrastructure must be able t
20、o cope with the workload caused by individual applications, for example Communications requirements in R/3Communication between the servers (server LAN)Communication between frontends and R/3Communication with external systems Communications requirements from further applications (CAD, Office.) Load
21、 generated by the network serverFile sharingPrintingAccess to central data (documentation CD.)o Each application may have different requirements (band width, availability, security.)Your planning should address these factors.o Check the appropriate brochure for the SAP requirements.o In addition to
22、the normal data paths, you must also plan the network server infrastructure to be part of the basic supply line.o The availability of network servers is crucial for software distribution access to online documentation and other information services office communicationo You must plan the server sizi
23、ng, and assignments to clients and subnetworks to cope with increased demand on the network servers (increased number of clients and data volume per client). The dependence of clients on the servers is increased. Without access to a network server, the function of the clients is limited. This makes
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- SAP标准培训教材bc040 PRINT1 SAP 标准 培训教材 bc040
链接地址:https://www.31ppt.com/p-2884237.html