大型半自磨机.ppt.ppt
《大型半自磨机.ppt.ppt》由会员分享,可在线阅读,更多相关《大型半自磨机.ppt.ppt(73页珍藏版)》请在三一办公上搜索。
1、国外大型半自磨机的设计理念和比例放大规则,选矿工艺:,碎磨,浮选,磁选,重选,碎矿,粗碎,中碎,细碎,球磨机,磨矿分级,磨矿分级,自磨机,返回料,排矿pi,新给矿fi,破碎过程,格子筛高比能 低比能矿浆,自磨机磨矿原理分级,HeightImpact ZoneToe Region,AttritionZone,半自磨机磨矿原理ShoulderRegionBallDrop,Rock,自磨,半自磨,SAG/Auto Mills,Conical ended mill,Flat ended mill,SAG/Auto MillsMill shapes,EGL 2 world class solutions
2、,.au,Deliveringto the minerals industry,Low filling,EGL 1,SAG/Auto MillsEffective Grinding Length(EGL)High filling,SAG Mill and Discharge Trommels,SAG/Auto Mills,.au,Mill Dimensions 尺寸Mill Speed 转速Mill Load/Ball Load 充填率Mill Power 功率Ball Size 球径Lifters 衬板Delivering world class solutionsto the minera
3、ls industry,SAG/Auto Mills磨机参数,SAG/Auto MillsMill Aspect Ratio(D/L),High(1.5-3),Square(1/1),Low(1/1.5 1/3),瑞典AITIK 铜金银矿山,瑞典AITIK 铜金银矿山选矿流程,自磨+砾磨,澳大利亚世纪锌矿,PASMINCO,To Pipeline,PrefloatRougherTank Cells(7),Stockpile,PrimarySizer,ROMHopper,Zinc Rougher Zinc ScavengerTank Cells(7)Tank Cells(11),CENTURYM
4、INE Pb Rougher Pb Scav.Tank Cells(4)Tank Cells(2),Tailings Dam,TailingsThick,ener,LeadThickener,SAG Mill36 x 16,Ball Mill20 x 32,(10”2 clusters x24),Lead StorageTanks(1),Zinc Regrind(6),Conditioner,Zinc Cleaner1,Tank Cells(6),Conditioner,Pb Cleaner 2Tank cells(2),Pb Cleaner 1Tank cells(3),Zinc,Thick
5、ener,Tanks(3),To Pipeline,Zinc Cleaner3 Tank Cells,(8),Zinc Cleaner4 Tank Cells(8),Zinc Cleaner 5Tank Cells(6),Zinc Cleaner 2Tank Cells(14),Cyclones(2”20 clusters x,16)Zinc Storage,Sand Grinders(15),Conditioners(2),Cyclones(6”2clusters x,20),Cyclones(6”2 clusters x,20),FlotationScreen(2.4m w*6.1m l)
6、,Oversize towastedump,澳大利亚世纪锌矿Cyclones,(S)AB 流程:,Ball mill,Flotation/leach,SAG mill,澳大利亚世纪锌矿,F80=80 mm,700 tph,P80=0.060 mm,球磨:6.7 MW,半自磨:12 MW,澳大利亚世纪锌矿,澳大利亚蒙特艾萨铜选厂,Process water12 l/s,Grinding Spillage,Flotation SpillageThickener U/F,Column Concentrate,Combined Scav.Conc.+Cleaner Tailings,REGRIND,R
7、EGRIND MILL,Regrind Mill Bypass,RETREATMENT,Retreatment Concentrate,Grinding and Flotation Flowsheet,From January 1998,Speed 13.99rpm 70%Allis-Chalmers,65mm Balls 0.65 kg/t,09 Ball Mill,05 Ball Mill,Size D=3.2m L=4.8mSpeed 17.9rpm 76%,50mm Balls 0.1kg/t,REGRIND CYCLONES7 D10B Krebs cyclonesin cyclop
8、ak arrangement6-7 operatingInlet diameter=55 mmVortex finder dia.=76 mmSpigot dia.=51 mm,BALL MILLSRated Power 2750 kW,Power Draw 2500 kWSize D=5m L=6m,MIBC 15 g/t,MIBC 15 g/t,SIBX,30 g/t,MIBC 15 g/t,30 g/t,SIBX,MIBC 15 g/t,Dextrin 60 g/t,6 g/t,NaCN,NaCN 4 g/t,09,05,LINE 2 SCAVENGERS,LINE 1 ROUGHERS
9、,01,Rated Power 746 kWPower Draw 550 kW,Media and reagent usages given are,with respect to the total plant feed,N,AG,02,Line 1,SecondaryCyclones,Line 2,Line 1,PrimaryCyclones,Process water 10 l/s,AG01,PrimaryCyclones,NaCN 20 g/t,4 Krebs D26B cyclones incyclo-pak arrangement,Spigot dia=152mm,SECONDAR
10、Y CYCLONES,Line 2,SecondaryCyclones,FULLY AUTOGENOUS MILLS,Rated Power=6600 KWPower Draw=6400 KW,Size D=9.75m L=4.42mSpeed 10.69 rpm 78%,PLANT FEED,Process water 10 l/sPLANT FEED,Scat returnWater jet 25 l/s,Process water15 l/s,Scat returnWater jet 25 l/sProcess water,15 l/s,Combined,RougherConcentra
11、te,LINE 2 ROUGHERS,FLOTATION FEED,Line 2,Line 1,FLOTATION COLUMNSHeight=16mDiameter=2.5m,Minnovex spargersRain tray wash waterarrangement,NaCN 25 g/t,MOUNT ISA MINES LTDCOPPER CONCENTRATOR,COLUMNS,Wash,WaterColumn 3 Tailings,1,2,3,Cleaner,RECLEANERS,CLEANERS,Concentrate,RecleanerWater,RecleanerConce
12、ntrate,Concentrate,Cleaner,FLOTATION BANKS,Agitair model 120,4 cells per bank4 impellers per cell,Volume of bank=45.2 m 3Pipsa Impellers 115 rpm,FINAL CONCENTRATE,To Copper SmelterThickeners,Grade:,25.0%Copper28.0%Iron9.0%Silica,Recovery:94.8%Cu,Cone angle=20,o,PLANT FEEDTarget Milling Rate 680 tph3