1、 摘 要 该建筑为大型商场,位于药王大街北面,建筑高度为51.80米,总建筑面积约4.5万平方米。本建筑物所有给水排水均按高层建筑给排水要求进行设计。结合实际情况,根据建筑物的性质,用途,和室内设有完善的给水排水卫生设备,具体的给排水系统设计如下:给水系统:本建筑地下一层至地上五层由室外市政管网直接供水,六至十层设有变频调速系统 和水泵、屋顶水箱相接合的给水方式;由于消火栓超过十个,需设两条引入管。从不同的方向引入。既保障了供水安全,又节约了能耗。排水系统:本设计采用污废水合流排放体制。管材采用了具有消声功能的螺旋UPVC排水管,升顶通气方式,为此可进一步提高环境质量。地下室内消防电梯井旁、泵
2、房地面均设有集水坑和废水提升装置。消防系统:该建筑防火等级属于中危险级级,设计内容包括消火栓系统,自动喷淋和水幕系统。在屋顶水箱间内设实验用消火栓装置,消火栓给水管网呈环状布置,各消火栓箱内设消防水泵启动电钮,能直接启动消防泵;室外设地下式水泵结合器,保证消防安全可靠。商场,走廊,办公间,电梯前室设闭式自动喷淋系统,自动扶梯旁的防火卷帘处设置水幕系统。雨水系统:该建筑为大型商场,座落于城市的繁华中心地带,因此对建筑立面要求较高,建筑的屋面高低落差较大故主要采用雨水内排水方式,以及少量的外排水。热水系统:由于该系统用水仅包括商场内服务人员和办公人员饮用开水,所以只设电开水加热设备。各系统中的立管
3、设在管井内或沿墙敷设,水平管根据各系统的特点明敷或暗敷。本设计以经济、环保、节能为原则,通过借鉴以前的设计方法和经验,采用了合理的技术措施,使设计的各个系统达到了很好的使用效果。关键词:给水;排水;消火栓;自动喷淋。AbstractThis building is the large-scale market, is located northern side the god of medicine avenue, the construction is highly 51.80 meters, total floor space approximately 45,000 square met
4、ers. This building possesses for water draining water presses the high-rise construction to request for draining water to carry on the design. Unifies the actual situation, according to the building nature, the use, is equipped with the consummation with the room in for the water draining water sani
5、tary equipment, concrete gives the drainage system design to be as follows:For aqueous system: This construction underground to ground five by outdoor municipal administration pipe network direct water supply, six to ten gives the square water pitcher type which is equipped with the frequency conver
6、sion velocity modulation system and the water pump, the roof water tank joins; Because the fire hydrant surpasses ten, must suppose two lead-in tubes. From different direction introduction. Both has safeguarded the water supply security, and saved the energy consumption. Drainage system: This design
7、 uses the dirt waste water confluence emissions system. The tubing used had the noise elimination function screw UPVC discharge pipe, rose to go against the ventilation way, might further improve the environment quality for this. In the basement nearby the fire electricity stairwell, the pump house
8、ground are equipped with the sump and the waste water lifting gear. Fire prevention system: This building fire protection rank belongs to the dangerous levelThe level, the design content including the fire hydrant system, sprays automatically with the water curtain system. In supposes the experiment
9、al fire hydrant installment in the roof water tank between, the fire hydrant service pipe net assumes the ring-like arrangement, in various fire hydrants box supposes the fire pump to start the push-button, can the line start fire extinguishing pump; Room peripheral equation below water pump coupler
10、, guarantee fire prevention safe reliable. The market, the corridor, the work, in front of the elevator the room supposes the closed type to spray the system automatically, nearby escalator fire protection volume curtain place establishment water curtain system. Rain water system: This building is t
11、he large-scale market, is located in the city lively heartland, therefore sets up the surface request to the construction to be high, the construction roofing height dropping variance compares the death of a parent mainly to use in the rain water to drain water the way, as well as few outside drains
12、 water. Hot water system: Because this system water used only includes in the market the service personnel and the work personnel drinks the boiling water, therefore only supposes the electricity boiling water heater. In various systems pipe riser is located in the tube well or along the wall placin
13、g, the horizontal tube acts according to various systems to point out especially spreads or spreads darkly. This design take the economy, the environmental protection, the energy conservation as a principle, through profits from beforehand design method and the experience, has used the reasonable te
14、chnical measure, enabled the design each system to achieve the very good use effect. Key word: for water ;Draining off water ;The fire hydrant ;Spurting voluntarily pours . 目 录引 言1第一章 工程概况21.1建筑概况21.1.1工程概述21.1.2建筑各层高度以及面积21.2设计任务21.2.1设计要求21.2.2设计的具体内容31.3 设计依据及原始资料31.3.1依据设计31.3.2原始资料3第二章 给水系统的设计与
15、计算52.1设计说明52.1.1给水方式的选择与优缺点52.1.2给水系统的组成52.1.3给水管道布置与安装52.2设计计算62.2.1生活给水设计标准与参数的确定62.2.2设计流量计算62.2.3低区管网水力计算表72.2.4高区和低区干管管道水力计算52.2.5其他72.3节水设施162.4给水安全技术分析162.5管道试压172.5.1技术要求17第三章 开水系统的设计与计算193.1设计说明193.2饮水用水量的确定19第四章 建筑排水系统设计与计算204.1设计说明204.1.1确定系统排水体制204.1.2系统组成及管材选用234.1.3存水弯、地漏、清扫口的设置234.1.4
16、防火套管的布置与敷设234.2设计计算234.2.1设计秒流量234.2.2管道布置和敷设:244.2.3横干管水力计算244.2.4卫生间1排水系统支管水力计算244.2.5排水立管的设计与计算:284.3化粪池计算304.4消防排水324.4.1规范要求:324.4.2集水井及排污泵计算324.5户外排水管及通灌水试验324.5.1排出管管材324.5.2施工原则及试验32 第五章 建筑雨水排水系统设计与计算365.1设计说明365.1.1确定屋面雨水排出方式365.1.2管材选用365.1.3雨水斗及管道的布置原则与方法:365.1.4降雨强度确定:365.2设计计算365.2.1内排水
17、系统计算365.2.2外排水计算385.3雨水灌水试验38第六章 建筑消防系统的设计与计算4061设计说明:406.1.1设计参数:406.1.2消防系统设计:406.2消防管道安装与布置416.2.1消火栓给水系统416.2.2自动喷淋系统416.2.3水幕系统426.3设计与计算426.3.1消火栓系统的设计426.3.2自动喷淋系统的设计与计算:496.3.5水幕系统设计计算61结 论65参考文献66附录68附录A低区管网水力计算草图68附录B高区和低区干管管道水力计算草图68附录C卫生间1/2排水系统枝干管水力计算草图70附录D消火栓给水系统配管水力计算草图71附录E自喷系统A区枝状管
18、网水力计算草图72附录F自动喷洒系统B区水力计算草图73附录G自动喷洒系统C区水力计算草图74谢 辞75引 言近年来,随着我国经济实力的增强,生活水平的提高,人们对生活质量,特别是生活空间居住环境的要求也在日益提高。节水节能已经提上日程。这就要求我们建筑给水排水专业人员更加努力。在做好合理设计的同时,更应开放思维,提高节水节能意识,为创和谐社会贡献一份力量。本次毕业设计为高层大型商场的给水,排水,雨水,热水,消防系统的设计与计算。在给水设计中,结合相关的设计资料提供的数据,本着以经济合理为原则,精确选择供水方案。在给水方面采用多项给水系统和超强节能的变频调速系统,大大增强了给水保障力度,提高了
19、安全系数。排水方面能结合该建筑的特点、市政条件以及周围建筑环境的特点,在设计中力求保证排水畅通,卫生条件较好。本设计中采用了螺旋管排水(韩国专利),依靠良好的消声功能,搏得了人们的喜爱和市场的一致好评。在消防方面主要考虑该建筑的防火等级,涉及方面有消火栓系统、自动喷淋系统和水幕系统。在水幕系统设计中选用气压传动方式,保障商场内的室内环境,同时也能迅速报警,及时将水送入防火卷帘处。在设计中通过各种方式搜集和整理经验数据以及各种资料,力求使设计更加合理,保证各个系统的正常工作。但在设计中由于个人能力和相关资料匮乏的原因,导致某些设计不够理想。本次设计的主要目的:掌握并能熟练运用计算机绘制给排水施工
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 工程 建筑 排水 毕业设计 全套 完整 优秀
链接地址:https://www.31ppt.com/p-2831433.html