1、我们毕业啦其实是答辩的标题地方,地基处理强夯法(动力固结法),汇报人,指导老师,Introduction,Preliminary evaluation,Design considerations,Contracing procedures,Constraction monitoring,CONTENT,Adjustments duringdynamic compaction,介绍,预先评估,设计考虑,招投标程序,建设监管,The mass of the tampers generally ranges from 5.4 to 27.2 Mg,and drop heights range fro
2、m 12.2to 30.5 m.,Lighter tampers and smaller drop heights result in depths of improvement on the order of 3.0 to 4.6 m.Heavier tampers and greater drop heights result in improvements on the order of 6.1 to 9.1 m,“,”,强夯调整,1,Categorize soil type:(1)Site Investigation(2)General Description of Soil Cate
3、gories,Assess site restraints:(1)Ground Vibrations(2)Lateral Ground Displacements(3)High Water Table(4)Presence of Hard or Soft Layers,2,Determine design requirements:(1)Tolerable Settlement(2)Minimum Soil Property(3)Depth Of Improvement Limitation,3,论文绪论,研究背景,研究方法,研究结果,问题讨论,论文总结,介绍,预先评估,设计考虑,招投标程序,
4、建设监管,强夯调整,Estimate costs:(1)Dynamic Compaction Costs(2)Alternate Ground Improvement Techniques,4,论文绪论,研究背景,研究方法,研究结果,问题讨论,论文总结,介绍,预先评估,设计考虑,招投标程序,建设监管,强夯调整,Selection of the tamper mass and drop height to correspond to the required depth of improvement.Determination of the applied energy to be used o
5、ver the project site to result in the desired improvement.Selection of the area to densify.Determination of the grid spacing and number of phases.Establishing the number of passes.The need for a surface stabilizing layer.,研究背景,研究背景,研究方法,研究结果,问题讨论,论文总结,介绍,预先评估,设计考虑,招投标程序,建设监管,强夯调整,研究背景,研究方法,研究结果,问题讨论
6、,论文绪论,论文总结,论文绪论,研究背景,研究方法,研究结果,问题讨论,论文总结,介绍,预先评估,设计考虑,招投标程序,建设监管,强夯调整,DEVELOPMENT OF DESIGN PLAN,MULTIPLE PASSES,AREA TO DENSIFY,论文绪论,研究背景,研究方法,研究结果,问题讨论,论文总结,论文绪论,研究背景,研究方法,研究结果,问题讨论,论文总结,介绍,预先评估,设计考虑,招投标程序,建设监管,强夯调整,论文绪论,研究背景,研究方法,研究结果,问题讨论,论文总结,介绍,预先评估,设计考虑,招投标程序,建设监管,强夯调整,研究背景,研究方法,研究结果,问题讨论,论文绪
7、论,论文总结,论文绪论,研究背景,研究方法,研究结果,问题讨论,论文总结,介绍,预先评估,设计考虑,招投标程序,建设监管,强夯调整,Design considerations,GRID SPACING AND NUMBER OF DROPS,SURFACE STABILIZING LAYER,APPLIED ENERGY REQUIREMENTS,SELECTION OF TAMPER AND DROP HEIGHT,论文绪论,研究背景,研究方法,研究结果,问题讨论,论文总结,介绍,预先评估,设计考虑,招投标程序,建设监管,强夯调整,研究背景,研究方法,研究结果,问题讨论,论文绪论,论文总结,
8、论文绪论,研究背景,研究方法,研究结果,问题讨论,论文总结,介绍,预先评估,设计考虑,招投标程序,建设监管,强夯调整,SELECTION OF TAMPER AND DROP HEIGHT,n has been found at project sites to range from 0.3 to 0.8.The variation in n is attributed to the:Efficiency of the drop mechanism of the crane.Total amount of energy applied.Type of soil deposit being de
9、nsified.Presence of energy absorbing layers.Presence of a hard layer above or below the deposit being densified.Contact pressure of the tamper.,论文绪论,研究背景,研究方法,研究结果,问题讨论,论文总结,论文绪论,研究背景,研究方法,研究结果,问题讨论,论文总结,介绍,预先评估,设计考虑,招投标程序,建设监管,强夯调整,论文绪论,研究背景,研究方法,研究结果,问题讨论,论文总结,介绍,预先评估,设计考虑,招投标程序,建设监管,强夯调整,论文绪论,研究背
10、景,研究方法,研究结果,问题讨论,论文总结,介绍,预先评估,设计考虑,招投标程序,建设监管,强夯调整,研究背景,研究方法,研究结果,问题讨论,论文绪论,论文总结,论文绪论,研究背景,研究方法,研究结果,问题讨论,论文总结,介绍,预先评估,设计考虑,招投标程序,建设监管,强夯调整,APPLIED ENERGY REQUIREMENTS,研究背景,研究方法,研究结果,问题讨论,AREA TO DENSIFY,Dynamic compaction is generally completed over an area larger than the plan area of the embankme
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 地基处理强夯法英文PPT 地基 处理 强夯法 英文 PPT
链接地址:https://www.31ppt.com/p-2731404.html