英文版DL 50311994 电力建设施工及验收技术规范 管道篇.doc
《英文版DL 50311994 电力建设施工及验收技术规范 管道篇.doc》由会员分享,可在线阅读,更多相关《英文版DL 50311994 电力建设施工及验收技术规范 管道篇.doc(33页珍藏版)》请在三一办公上搜索。
1、ELECTRIC POWER TRADE STANDARD OF THE PEOPLES REPUBLIC OF CHINATHE CODE OF ERECTION AND ACCEPTANCEFOR ELECTRIC POWER CONSTRUCTIONPIPING SECTIONDL 5031-94Chief Editorial Department: Construction Cooperating Department of the Ministry of Power Industry Approved Department: The Ministry of Power Industr
2、y of P.R.C1994 BeijingNoteThis book is the English translation of The Code of Erection and Acceptance for Electric Power Construction Piping section DL 5031-94 In the event of any inconsistency between the Chinese-language text of the Code and the present English-language text of the Code, the Chine
3、se-language text shall be taken as ruling.The Ministry of Power Industry of the Peoples Republic of ChinaThe Notification of Issuing the Electric Power Trade StandardThe Code of Erection and Acceptance for Electric Power Construction (Piping section)Electric Power Technology 1994 No.208All electric
4、power administrations, all electric power bureau, electric power planning institutes, and electric power construction institutes of provinces (municipalities directly under the Central Government, autonomous regions) and Water and Electric Power Press:For adapting the development of electric power i
5、ndustrial technology and insuring the erection quality of pipes of thermal Power plant, the Code of Erection and Acceptance for Electric Power Construction (piping section) DJ 56-79 issued in 1979 had been revised by the ministry. The new code should be looked upon as electric power trade standard a
6、nd the code number is DL 5031-94. The standard is approved and issued now and will be go into effect from Oct.!, 1994 and the older version should be abolished at the same time. Any question in the performing should be notified the Construction Cooperating Department of the ministry please.Apr. 9,19
7、94Contents1.0General rules42.0Glossary63.0Checking of pipes, pipe fittings, pipe accessories and valves63.1General regulations63.2Checking of pies63.3Checking of pipe fittings73.4 Checking of pipe accessories73.5 Checking of valves74.0 Preparation of pipes, pipe fittings and pipe accessories84.1 Gen
8、eral regulations84.2Elbow pipe84.3 Processing of reel pipes, pipe fittings and pipe accessories94.4 Processing of supporting and suspending bracket115.0 Installation of pipes125.1 General regulations125.2 I Installation of high pressure pipe145.3 Installation of medium and low pressure pipe155.4Inst
9、allation of water drainage pipe155.5Installation of valve and flange155.6 Installation of supporting and suspending bracket166.0Test and clean of pipe system176.1Tightness test of pipe system176.2 Cleaning of pipe system187.0 Acceptance of works19Appendix ATypical data in the construction and accept
10、ance of pipe system in power plant20Appendix BInstallation regulation of oxygen pipe and acetylene pipe system31Supplementary instruction:321.0 General rules1.0.1 The code applies to the configuration, construction and acceptance of following pipes of thermal power plant and thermal power network:1.
11、0.1.1 The main steam pipes of 600MW or lower subcritical parameter thermoelectric generating set and corresponding re-heating steam pipes and main water supply pipes;1.0.1.2 General steam and water pipes, thermal power network pipes and compressed air pipes in thermal power plant;1.0.1.3 Temporary p
12、ipes used in construction.1.0.2 The code does not apply to the following:1.0.2.1 Cast iron pipes;1.0.2.2 Reinforced concrete pipes;1.0.2.3 Non-ferrous (titanium, copper and etc.) pipes;1.0.2.4 Nonmetal (plastic and etc.) pipes;1.0.2.5 Nonmetal lining pipes;1.0.2.6 Composite metal pipes.1.0.3 For the
13、 special construction and acceptance of following types of pipes, regulations in corresponding section of the Code of Erection and Acceptance for Electric Rower Construction should be also complied besides the technology requirements in this code:1.0.3.1 All types of pipes in the steam turbine and e
14、lectric generator body;1.0.3.2 All types of pipes in boiler body, and pipes of fume exhaust system, ventilation system, coal system, fuel system, gas burning system and dust removal system;1.0.3.3 Oil pipes and all types of water treatment pipes;1.0.3.4 All types of pipes of hydrogen generating syst
15、em and hydrogen supply system;1.0.3.5 Thermal meter pipes;1.0.3.6 Oxygen and acetylene pipes.1.0.4 Except the sections with other concrete stipulations in construction contract, the provisions in this code must be observed in the construction and acceptance of pipes of imported thermoelectric genera
16、ting set.1.0.5 The piping installation of power plant must be carried out by professional construction team with essential technical force, checking means and management level.1.0.6 The piping construction of power plant should be carried out according to the basic construction program, and followin
17、g conditions are necessary:1.0.6.1 Designing files and other technology documents should be fully ready, and a joint checkup must have been made for construction drawings;1.0.6.2 The construction organizing design and construction plan of piping project of electric power plant should have been compi
18、led, checked and approved;1.0.6.3 Real technology communication and required technical training and examining should have been finished;1.0.6.4 Labor force, materials, machineries and checking means should be completed on the whole;1.0.6.5 Construction should satisfy the demands of environment;1.0.6
19、.6 Water, power and compressed air used in construction should satisfy the demands of construction.1.0.7 Active national or trade (or special) technical standards must be complied for the manufacturing quality and choosing of pipes, pipe fittings and pipe accessories.1.0.8 Active SDJ68 the Maintenan
20、ce and Keeping Regulation for Electric Power Basic Construction Thermal Power Devices and corresponding additional regulations should be observed for the store of all types of pipes, pipe fittings and pipe accessories.1.0.9 All types of pipe should be constructed according to the design drawings, an
21、d it should be submitted t designing unit to treat in term of relevant regulation if the design should be modified or substitute material should be adopted.1.0.10 The relevant regulation in active DL 5007 the Code of Erection and Acceptance for Electric Power Construction (Welding Section of Thermal
22、 Power Plant) should also be observed in the cutting and welding operation f pipes construction besides the relevant regulations in this code.1.0.11 Regulations in SDJ 245 the Code of Erection and Acceptance for Electric Power Construction (Boiler Unit Set Section) should be complied 1ir the heat pr
23、eservation and painting of pipes. And the painting of pipe should be carried out according to the regulation of DL 50I I the Code of Erection and Acceptance for Electric Power Construction (Steam Turbine Unit Set Section).1.0.12 Relevant regulations of active DL 5009.1 the Safety Operating Regulatio
24、n of Electric Power Construction (Thermal Power Plant Section) must be observed for the safety, environment and fire protection in the piping construction of electric power plant.2.0 Glossary2.0.1 Pipe fittings- the general designation of parts and elements which composing piping system with pipes t
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 英文版DL 50311994电力建设施工及验收技术规范 管道篇 英文 DL 50311994 电力 建设 施工 验收 技术规范 管道

链接地址:https://www.31ppt.com/p-2705114.html