1、桥梁施工中软土地基施工技术的应用研究中英文翻译Bridge construction of soft soil foundation construction technology application research on Chinese and English translation 关键词:软土地基,施工技术,桥梁Key words: soft soil foundation, construction techniques, and Bridges 摘要:桥梁是一个国家通往成功之路的重要标志性建筑物。目前,我国在桥梁的建筑施工方面还存在着一定的问题。我国的桥梁施工人员在桥梁施工当中
2、遇到的主要问题为怎样在软土地基上进行桥梁的施工。软土地基主要以压缩低量较高软弱土层和强度较低的两种软弱土层相组成的,所以要在这种软土地基上面架设桥梁,对于桥梁施工人员来说是一个较为严重的问题。Abstract: the bridge is a national important landmark building of the road to success. At present, our country the construction of the bridge construction still exist some problems. Bridge construction pe
3、rsonnel in the middle of the bridge construction in our country the main problems is how to bridge construction in soft soil foundation. Mainly soft soil foundation with low levels of high compression strength of soft soil layer and the lower phase composition of two weak soil, so be on the soft soi
4、l foundation, build a bridge for bridge construction personnel is a relatively serious problem. 我国在现代桥梁建设当中,面对软土地基方面的问题会经常遇到。桥梁施工当中,软土地基对桥梁施工作业有着较大的影响,在这方面上一定要特别注意桥梁桩基础的施工过程,对其采取有效的技术处理,如果在这方面没有处理好,那会影响到整个桥梁施工的成本、进度、安全和质量问题的存在。在进行桥梁施工之前,施工者要对软土地基有着一定的认识与了解,然后采取合理、有效、科学方面的技术措施,这样做得目的可以保证桥梁的安全稳定性和质量性。
5、以下是对软土地基施工的技术在桥梁施工中的应用、措施、和问题方面的分析:Among the modern bridge construction in our country, facing the problems often encountered in soft soil. Bridge construction, soft soil has important effects on the construction of the bridge, the graces must pay special attention to the construction process of the
6、 bridge pile foundation, to take effective technical processing, if there is no handle in this respect, it will affect the whole bridge construction cost, schedule, safety and quality issues. Before the bridge construction, the builders want to have a certain understanding on soft soil foundation an
7、d understanding, and then take reasonable, effective and scientific aspects of the technical measures, such doing can ensure the safety of the bridge stability and quality. Below is the construction of soft soil foundation of technology application in the bridge construction, measures, and the analy
8、sis of the problems: 一、在软土地基施工当中应该注意的问题One, the problems should be noticed in the construction of soft soil foundation 随着我国社会经济快速发展的步伐,我国在桥梁方面的需求日益增多。因为大多数地区有软土基地的存在而影响了施工工程的进度,所以在进行桥梁工程建筑的时,一定要对桥梁建筑区域的工程地质进行勘测。让所有的施工人员对桥梁工程的工程地质有全面的了解,从而制定科学并且合理的桥梁施工技术方案。在桥梁桩基础的施工中。施工技术人员必须要对软土地基的柔软度、稳定、变形等进行科学合理的计
9、算过程。这样可以避免和减少桥梁桩基础在施工当中开裂、倾斜、位移、失稳和沉降等造成的安全、质量问题。As the pace of our social economy rapid development, the growing demand for Bridges in our country. Because most areas have the existence of the soft soil base and affected the construction progress, so in the bridge engineering construction, must be
10、done to bridge construction area engineering geology reconnaissance. All construction personnel have comprehensive knowledge of bridge project of engineering geology, so as to formulate scientific and reasonable bridge construction technology scheme. During the construction of bridge pile foundation
11、. Construction technical personnel must be on the flexibility, stability and deformation of soft soil foundation, such as scientific and reasonable calculation process. So that you can avoid and reduce the crack of bridge pile foundation in the construction, inclination and displacement, instability
12、 and sedimentation caused by the safety and quality issues. 二、软土地基施工技术在桥梁施工的措施Second, the construction technology of soft soil foundation in bridge construction measures 在软土地基区域建设桥梁工程的时候,因为桩基础方面的埋置比较深,所以当软土地基被深入穿过时,可能会导致软土地基出现沉降方面的现象,尤其要在桥头和路堤的连接处注意桩基础沉降的问题。当发现桩基础出现沉降问题时,一定要及时采取相应有效的技术措施,如果不能对其及时采取相
13、应的技术措施,会对桥梁工程的安全性、抗震性、稳定性产生重要的影响。进行软土地基施工时,机械设备的选择尤为重要,选择机械设备时一定要注意机械设备的安全性、经济性、实用性。当开始对软土地基进行处理的时候,一定要提前对地质方面进行实地考察之后才可以进行处理。Bridge engineering in soft soil area construction, because of the pile foundation embedment of more deep, so when thoroughly through the soft soil foundation, it could lead t
14、o the settlement of soft soil foundation in aspects of the phenomenon, especially must pay attention to in the joint of the bridge and embankment settlement of pile foundation. When found the pile foundation subsidence problems, must adopt corresponding effective technical measures in time, if not f
15、or the corresponding technical measures are taken in time, for the safety of the bridge engineering, earthquake resistance and stability have a major impact. For soft soil foundation construction, machinery and equipment choice is particularly important when selecting equipment must pay attention to
16、 the safety of the machinery and equipment, economy and practicability. When you start to deal with soft soil foundation, must advance after on-the-spot investigation on geological aspects can be processed. 三、软土地基施工技术在桥梁施工中的应用Three, the construction technology of soft soil foundation is applied in b
17、ridge construction 本文对某项桥梁工程选取为列,对软土地基施工技术在桥梁施工中的应用进行了简要分析。桥梁长度为4千米,共有576根桩基础,桩基础最深的深处为70米,最浅为45米。在进行桥梁工程前,相关技术人员根据地质资料和探测结果对其判定,桥梁施工区域大部分土地为软土地基,而桥梁区域的软土主要是由风化岩石层、中细砂土层、软弱土层和粘性土层组成的。Selected in this paper, a bridge project as the column, the construction technology of soft soil foundation applicati
18、on in bridge construction are analyzed in brief. Length is 4 km bridge, a total of 576 root pile foundation, pile foundation, the deepest depths of 70 meters, the most shallow to 45 meters. Before in bridge engineering, related technical personnel according to the geological data and detecting resul
19、t to the judge, bridge construction area most of the land for the soft soil foundation, and the bridge in the area of soft soil mainly consist of weathering layers, composed of fine sand soil, soft soil and cohesive soil. 1、软土地基施工中的钻机选择1, the drilling machine selection in soft soil foundation constr
20、uction 钻机的种类可分为:冲击钻机、旋转钻机、长螺旋干挖钻机、非开挖钻机、深层搅拌钻机、粉喷钻机,在选择钻机的时候可以根据施工技术人员的施工经验和工程地质的勘测结果进行选择。一般施工技术人员会在上部土层使用旋转钻机进行施工钻探,而对下部的土层会使用冲击钻进行施工。旋转钻机的使用分析有三点:第一,旋转钻机的机能是放在自行移动履带式安装地盘上的,可以让跟桩之间的移动进行的比较简单、快速,整个过程只需要简短的几分钟就可以完成,这一点在施工工期上节约了比较多的时间。第二,因旋转钻机的地盘可以伸缩和自动调整,所以关于钻机的深度问题、塔的垂直问题都可以通过操作面板的显示进行操作。第三,旋转钻机形成钻
21、孔和钻进的速度时间会比较短,旋转钻机可以根据土层的结构来选择合适的钻头进行施工。冲击钻的使用分析:在旋转钻机对石层、土层的分界完成时,要把旋转钻机及时移动到下一个桩位,再对冲击钻进行配合,到达指定位置。因在施工过程中会遇到风华岩石层,其风华岩石层的坚硬度比较大,而旋转钻机的冲击力不如冲击钻的冲击速度,所以旋转钻机要和冲击钻进行配合,冲击钻可以加快施工的速度。Drill types can be divided into: the impact drill, rotary drilling rig, long spiral dry drill, trenchless drill, deep mi
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 桥梁施工中软土地基施工技术的应用研究 中英文翻译 桥梁 施工 土地 技术 应用 研究 中英文 翻译
![提示](https://www.31ppt.com/images/bang_tan.gif)
链接地址:https://www.31ppt.com/p-2652953.html