国际项目管理手册The Project Manager’s Manual.doc
《国际项目管理手册The Project Manager’s Manual.doc》由会员分享,可在线阅读,更多相关《国际项目管理手册The Project Manager’s Manual.doc(240页珍藏版)》请在三一办公上搜索。
1、The Project Managers ManualThe Project Managers ManualPREFACEProject Management consists of planning, organizing, directing, monitoring and controlling the activities for the design, procurement, construction and start up of a production facility. Project Management is a team effort with all project
2、 activities under the direct leadership of the Project Manager for the duration of the project.This manual includes a number of guides, checklists and forms to assist the Project Manager in running a successful project and should be read and used in conjunction with standard Company Procedures and D
3、epartmental Procedures.The guidelines and principles herein are applicable to all projects. They are intended to be flexible enough to service all elements of sound project management in a continuing competitive environment.TABLE OF CONTENTSPREFACERECORD OF REVISIONSDISTRIBUTION LISTTABLE OF CONTENT
4、SSECTION 1 - GUIDELINES1 - THE PROJECT MANAGER1 - 1Role of the Project Manager1 - 2Qualities of the Ideal Candidate 1 - 3Assignment to a New Project1 - 4Client Relations1 - 5The Contract1 - 6The Project Team1 - 7Getting Started1 - 8In Production1 - 9Reports1 - 10Communications1 - 11On Completion1 -
5、12 2 - PROJECT ORGANIZATION2 - 1Project Initiation2 - 2Planning2 - 3Estimating2 - 4Cost Control2 - 5Project Accounting2 - 6Engineering2 - 7Procurement2 - 8Subcontracts2 - 9Coordination and Reviews2 - 10 Quality Assurance2 - 11Quality Control, Inspection Construction2 - 12Precommissioning and Commiss
6、ioning 2 - 13Project Closeout and CompletionIndividual Responsibilities2 - 14Project Manager2 - 15Planning Coordinator2 - 16Cost Engineer2 - 16Project Engineering Manager 2 - 16Project Engineers2 - 17Lead Engineers2 - 17Project Procurement Manager2 - 17Project Buyer2 - 17Document Controller2 - 18Qua
7、lity Assurance Engineer2 - 18Construction Department Representative2 - 18Construction Manager2 - 18Project Accountant2 - 183 - PROJECT PRACTICES3 - 1Project Staffing3 - 2Assignment to the Project3 - 2Publicity3 - 2Security and Secrecy3 - 3Working Week3 - 3Overtime Working3 - 3Project Procedures3 - 4
8、Time Sheets3 - 4Code of Accounts3 - 4Annual Vacation3 - 4Business Travel3 - 5Expense Claims3 - 5Correspondence to the Client3 - 5Correspondence from the Client3 - 6Client Instructions3 - 6Correspondence with Licensor and Third Parties 3 - 7Correspondence with Vendors, Subcontractors 3 - 7Meetings wi
9、th the Client, Third Parties, Others 3 - 7Conversations and the Telephone3 - 8Inter-Office Memos3 - 8Drawing Forms, Checking and Signature 3 - 8Document Distribution3 - 9Filing System3 - 10 4 - PROPOSAL PREPARATION4 - 1Proposal Notification4 - 2Bid, No Bid Meeting4 - 3Responsibilities4 - 4The Propos
10、al Manager4 - 5The Proposal Strategy4 - 6Proposal Kick-off Meeting4 - 7Approach to the Estimate4 - 8Man-hour Estimate4 - 9The Proposal4 - 10Transmittal Letter4 - 10Executive Summary4 - 10Project Plan of Approach 4 - 11Project Organization Chart4 - 11Field Organization Chart 4 - 12Proposed Project Sc
11、hedule4 - 12Preliminary Engineering Schedule4 - 13Manpower Histogram4 - 14Scope of Services4 - 14Scope of Supply4 - 14Project Description4 - 15Equipment List4 - 15Site Plan or Overall Layout4 - 16Drawing List4 - 16Clarifications4 - 17Subsequent Presentations4 - 185 - PROJECT INITIATION5 - 1General5
12、- 2Role of the Project Manager 5 - 2New Contract Award 5 - 3Contract Scope5 - 3Project Description5 - 4Scope of Services5 - 4Scope of Supply5 - 5Project Plan of Approach5 - 5Offices and Facilities5 - 6Job Instructions5 - 7Job Bulletins5 - 8Design Basis5 - 8Kick-off Meeting with Client5 - 8Project Or
13、ganization5 - 9Project Organization and Key Personnel5 - 9Project Staffing5 - 9Project Schedule and Milestones5 - 10Project Kick-Off5 - 11Internal Kick-off Meeting5 - 11Project Review Meetings5 - 12Project Controls5 - 13Cost Coding5 - 13Estimating5 - 14Engineering5 - 15Procurement5 - 15Construction5
14、 - 16Project Accounts5 - 17Numbering Systems5 - 17Project Administration & Procedures5 - 186 - PROJECT MEETINGS6 - 1Review Meetings in General 6 - 2Engineering and Design Review6 - 3 Procurement Review6 - 4Planning and Cost Review6 - 5Construction Review 6 - 6Management Review6 - 7Project Managers R
15、eport6 - 2SECTION 11 - CHECKLISTS1 - PROPOSAL PREPARATIONProposal Preparation Checklist Clients InquiryCommercial AspectsApproach to EstimateThe ProposalExecutive SummaryProject Plan of Approach Proposal IndexTechnical Description Process Design By Others Proposal Schedule and Control Engineering, G
16、eneralPlant SiteComputer StrategyFee StructurePayment Schedule2 - SCOPE OF SERVICES CHECKLISTSProject ManagementEstimatingPlanningCost ControlProcess DesignProcess Control and InstrumentationPipelinesSub SeaOffshore Structures, JacketsOffshore Structures, TopsidesWeight ControlMechanical EquipmentHV
17、ACFire ProtectionFabrication Equipment, Vessels & Heat Exchangers MaterialsInsulations and Painting, Piping and Vessels SafetyCivil, Structural, Architectural ElectricalPiping Engineering and Design Computer Aided Design (CAD) Quality AssuranceQuality ControlPurchasing, Expediting, Shipping Material
18、 ControlSite Material Control Construction Subcontracts Construction, Home Office Construction Management at Site Scope of Work By ClientScope of Supply3 - JOB INSTRUCTIONS CHECKLISTProject DescriptionOrganization and PersonnelClient Addresses and Key PersonnelClient Representatives in John Brown Of
19、fice ABB LUMMUS Addresses and Key Personnel Project Organization ChartCorrespondenceTo Client from ABB LUMMUS From client to ABB LUMMUS With other PartiesProject AdministrationDocument Distribution ScheduleClient ApprovalsProgress Reports to ClientCost Control and Project Accounting Project Closeout
20、Project CoordinationGeneral EngineeringProcess DesignDesign and Operating ManualsAs-Built DrawingsPlanningProcurementMaterial ControlConstruction SiteContract DetailsContract with the Client Billing Arrangements Insurance Requirements Project Schedule Project Overview4 - DESIGN BASISEngineering - Ge
21、neral Codes and Specifications Process DesignSafetySite DetailsPlant LayoutsBattery Limit Conditions Fuel SystemsLiquid FuelsUtility Systems CondensateWater SystemsWater AnalysisAir SystemsElectricalRange of Kilowatts Instruments and Controls Climatic ConditionsCivil and Structural Sewers and Waste
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 国际项目管理手册The Project Managers Manual 国际 项目 管理 手册 The Manager

链接地址:https://www.31ppt.com/p-2392133.html