1、水利专业名词(中英)A安全储备 safety reserve安全系数 safety factor安全性 safety岸边溢洪道 river-bank spillway岸边绕渗 by-pass seepage around bank slope岸墙 abutment wall岸塔式进水口 bank-tower intakeB坝的上游面坡度 upstream slpoe of dam坝的下游面 downstream face of dam坝顶 dam crest坝顶长度 crest length坝顶超高 freeboard of dam crest坝高 dam height坝顶高程 crest e
2、levation坝顶宽度 crest width坝段 monolith坝基处理 foundation treatment坝基排水 drain in dam foundation坝基渗漏 leakage of dam foundation坝肩 dam abutment坝壳 dam shell坝坡 dam slope坝坡排水 drain on slope坝体混凝土分区 grade zone of concrete in dam坝体排水系统 drainage system in dam坝型选择 selection of dam type坝址选择 selection of dam site坝趾 dam
3、 toe坝踵 dam heel坝轴线 dam axis本构模型 constitutive model鼻坎 bucket比尺 scale比降 gradient闭门力 closing force边墩 side pier边界层 boundary layer边墙 side wall边缘应力 boundary stress变形观测 deformation observation变中心角变半径拱坝 variable angle and radius arch dam标准贯入试验击数 number of standard penetration test冰压力 ice pressure薄壁堰 sharp-c
4、rested weir薄拱坝 thin-arch dam不均匀沉降裂缝 differential settlement crack不平整度 irregularityC材料力学法 method of strength of materials材料性能分项系数 partial factor for property of material侧槽溢洪道 side channel spillway侧轮 side roller侧收缩系数 coefficient of side contraction测缝计 joint meter插入式连接 insert type connection差动式鼻坎 diffe
5、rential bucket掺气 aeration掺气槽 aeration slot掺气减蚀 cavitation control by aeration厂房顶溢流 spill over power house沉降 settlement 沉井基础 sunk shaft foundation沉沙池 sediment basin沉沙建筑物 sedimentary structure沉沙条渠 sedimentary channel沉陷缝 settlement joint沉陷观测 settlement observation衬砌的边值问题 boundary value problem of linin
6、g衬砌计算 lining calculation衬砌自重 dead-weight of lining 承载能力 bearing capacity 承载能力极限状态 limit state of bearing capacity持住力 holding force齿墙 cut-off wall冲击波 shock wave冲沙闸 flush sluice冲刷坑 scour hole重现期 return period抽排措施 pump drainage measure抽水蓄能电站厂房 pump-storage power house出口段 outlet section初步设计阶段 preliminar
7、y design stage初参数解法 preliminary parameter solution初生空化数 incipient cavitation number初应力法 initial stress method船闸 navigation lock垂直升船机 vertical ship lift纯拱法 independent arch method次要建筑物 secondary structure刺墙 key-wall粗粒土 coarse-grained soil错缝 staggered jointD大坝安全评价 assessment of dam safety大坝安全监控 monito
8、r of dam safety大坝老化 dam aging大头坝 massive-head dam单层衬砌 monolayer lining单级船闸 lift lock单线船闸 single line lock挡潮闸 tide sluice挡水建筑物 retaining structure导流洞 diversion tunnel导墙 guide wall倒虹吸管 inverted siphon倒悬度 overhang等半径拱坝 constant radius arch dam等中心角变半径拱坝 constant angle and variable radius arch dam底流消能 en
9、ergy dissipation by hydraulic jump底缘 bottom edge地基变形 foundation deformation地基变形模量 deformation modulus of foundation地基处理 foundation treatment地下厂房 underground power house地下厂房变压器洞transformer tunnel of underground power house地下厂房出线洞 bus-bar tunnel of underground power house地下厂房交通洞 access tunnel of under
10、ground power house地下厂房通风洞 ventilation tunnel of underground power house地下厂房尾水洞 tailwater tunnel of underground power house地下轮廓线 under outline of structure地下水 groundwater地形条件 topographical condition地形图比例尺 scale of topographical map地应力 ground stress地震 earthquake地震烈度 earthquake intensity地质条件 geological
11、 condition垫层 cushion垫座 plinth吊耳 lift eye调度 dispatch跌坎 drop-step跌流消能 drop energy dissipation跌水 drop 迭代法 iteration method叠梁 stoplog丁坝 spur dike定向爆破堆石坝 directed blasting rockfill dam动强度 dynamic strength动水压力 hydrodynamic pressure洞内孔板消能 energy dissipation by orifice plate in tunnel洞内漩流消能 energy dissipati
12、on with swirling flow in tunnel洞身段 tunnel body section洞室群 cavern group洞轴线 tunnel axis陡坡 steep slope渡槽 短管型进水口 intake with pressure short pipe断层 fault堆石坝 rockfill dam对数螺旋线拱坝log spiral arch dam多级船闸 multi-stage lock多线船闸 multi-line lock多心圆拱坝 multi-centered arch dam多用途隧洞 multi-use tunnelE二道坝 secondary dam
13、F发电洞 power tunnel筏道 logway反弧段 bucket反滤层 filter防冲槽 erosion control trench防洪 flood preventi,flood control防洪限制水位 restricted stage for flood prevention防浪墙 parapet防渗墙 anti-seepage wall防渗体 anti-seepage body放空底孔 unwatering bottom outlet非常溢洪道 emergency spillway非线性有限元 non-linear finite element method非溢流重力坝 n
14、onoverflow gravity dam分岔 fork分洪闸 flood diversion sluice分项系数 partial factor分项系数极限状态设计法 limit state design method of partial factor封拱 arch closure封拱温度 closure temperature浮筒式升船机ship lift with floats浮箱闸门 floating camel gate浮运水闸 floating sluice辅助消能工 appurtenant energy dissipationG刚体极限平衡法 rigid limit equi
15、librium method刚性支护 rigid support钢筋混凝土衬砌 reinforced concrete lining钢筋计 reinforcement meter钢闸门 steel gate高边坡 high side slope高流速泄水隧洞 discharge tunnel with high velocity工程管理 project management工程规划 project plan工程量 quantity of work工程设计 engineering design 工程施工 engineering construction工作桥 service bridge工作闸门
16、 main gate拱坝坝肩岩体稳定 stability of rock mass near abutment of arch dam拱坝布置 layout of arch dam拱坝上滑稳定分析 up-sliding stability analysis of arch dam拱坝体形 shape of arch dam拱端 arch abutment拱冠 arch crown拱冠梁法 crown cantilever method拱冠梁剖面 profile of crown cantilever拱内圈 intrados拱外圈 extrados固结 consolidation固结灌浆 con
17、solidation grouting管涌 piping灌溉 irrigation规范 code,specification过坝建筑物 structures for passing dam过滤层 transition layer过渡区 transition zone过木机 log conveyer过木建筑物 log pass structures过鱼建筑物 fish-pass structuresH海漫 flexible涵洞 culvert河道冲刷 river bed scour荷载 load荷载组合 load combination横缝 transverse joint横拉闸门 horizo
18、ntal rolling /sliding gate洪水标准 flood standard虹吸溢洪道 siphon spillway厚高比 thickness to hight ratio弧形闸门 radial gate护岸工程 bank-protection works护坡 slope protection护坦 apron戽琉消能 bucke-type energy dissipation滑坡 land slip滑楔法 sliding wedge method滑雪道式溢洪道 skijump spillway环境评价 environment assessment换土垫层 cushion of
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 水利 专业 名词 中英文 对照

链接地址:https://www.31ppt.com/p-2351287.html