轮机英语关联题题库最新整理篇(带翻译)解析.doc
《轮机英语关联题题库最新整理篇(带翻译)解析.doc》由会员分享,可在线阅读,更多相关《轮机英语关联题题库最新整理篇(带翻译)解析.doc(63页珍藏版)》请在三一办公上搜索。
1、Passage 1 (原题库第1篇) Valve drive mechanism The valve drive mechanism commands the inlet and exhaust valves at the required timing. 第3题The valve drive mechanism consists of an inlet and exhaust cam follower (8) each suspended in a plunger of the tappet assembly (7), two tubular push rods (4) with ball
2、joints, two nodular cast iron rocker arms (2) suspended in a rocker arm bearing bracket, two yokes (5) and a yoke guide pins. See Fig. 4-1. The tappet rollers follow the cam profiles and transfer the movements through push rods to the rocker arms. 第4题The rocker arms operate the inlet and exhaust val
3、ves through yokes (5). Lubrication for the rocker arms comes from the engines secondary oil supply manifold throughdrillings in the cylinder head and rocker arm bracket. 第2题The tappet assembly receives lubricating oil via channels in the engine block from the main supply manifold. For the roller and
4、 shaft, the oil is supplied through the guiding plunger. 第4题To compensate for heat expansion a clearance must exist between the rocker arm and yoke.第1题All adjustments have to be done on a cold engine only.1. According to the Passage, the best time to adjust the valve clearance is _.A. before the eng
5、ine is started B. when the engine is runningC. after the engine has just been stopped D. when something has gone wrong with the engine注:根据文章来看,调节阀间隙的最好时间是在发动机启动之前。2. The roller and the tappet assembly are lubricated by means of_.A. the main lube system B. the secondary oil systemC. the special pumpi
6、ng system D. the turbine oil system注:滚轮和挺杆组件借助于主润滑系统润滑。3. According to the Passage, the valve drive mechanism does not include_.A. tappet rollers B. push rods C. nodular cast iron D. yokes and guide pins注:根据文章来看,阀驱动机构不包括球墨铸铁。(包括挺杆滚轮、顶杆、吊梁和导销)4. To close valves tightly, which clearance should be insp
7、ected according to the maintenance schedule?A. The one between the cam and the tappet roller. B. The one between the push rods and the ban joints.C. The one between the rocker arms and the yoke D. The one between two tubular push rods.注:依据保养清单,要紧密的关闭阀件,应检查摇臂和吊梁之间的间隙。Passage 2 (原题库第3篇) Charge air coo
8、lerThe engine is equipped with a charge air cooler. The insert type charge air cooler is mounted in a welded casing (air trunk). The trunk is bolted to the engine block. 第1题Standard is a two-stage cooler mounted. The first stage, through which the charge air flows, is cooled with water from the HT c
9、ooling system and cooks the charge air till approx. 90 100oC. The second stage is supplied with water coming from the LT water system and cooks the charge air further till the required temperature of approx. 50oC. 第2题(B)By controlling the water flow through the LT cooler the charge air temperature c
10、an be kept constant at the required temperature. The circulating coolant water should always be under positive pressure and should be as clean as possible. The operating air temperature should be maintained by controlling the coolant inlet temperature. Whilst the engine is running the air and coolan
11、t temperatures and pressures at inlet and outlet should be checked and logged periodically. 第3题 Variations from normal indicate faults developing such as fouling of the film plates or obstruction of the water tubes.第4题Check daily, during operation of the engine, the working of the telltale hole at t
12、he free end of the charge air receiver. The function of this hole is to inform the operator the presence of water in the charge air receiver. Under normal condition only compressed air should escape from this hole.1. According to the Passage, the expression HT probably means_.A. HIGH TANK B. HIGH TE
13、MPERATURE C. HEAT TRANSMISSION D. HEAT TRANSFER注:根据文章来看, HT的意思是:high temperature,高温。2. In order to maintain the change air temperature we should control_.A. the coolant inlet temperature coming from the first stage coolerB. the coolant flow coming from the second stage coolerC. the coolant outlet te
14、mperature coming from the second stage coolerD. the coolant flow coming from the flint stage cooler注:为维持增压空气的温度,我们应控制来自第二级冷却器的冷却剂流量。3. The charge air temperature departing from normal may indicate that_.A. condensate can be formedB. only compressed air should escape from the telltaleC. the film plat
15、es are becoming dirty or the water tubes are blocked by scaleD. cooling water may have been carried into the cylinders注:增压空气温度偏离正常表明镀膜变脏或水管被水垢堵塞。4. The function of the telltale hole is to_.A. detect whether compressed air has escaped from the holeB. control the coolant inlet temperatureC. determine
16、whether the coolant water is under positive pressureD. inform the operator the presence of water in the charge air receiver注:警报孔或监视孔的作用是同志作业员扫气箱中有水。 telltale hole监视孔,指示孔,警报孔; charge air receiver. 扫气箱Passage 3 (原题库第6篇) 第1题 At the first start, listen carefully for possible jarring sounds. If anything
17、is suspected, stop the engine immediately, otherwise stop the engine after 5 minutes idling. Check at least the temperatures of the main and big end bearings and of all other bearings which have been opened. Make visual inspection from below to the cylinder liners and piston skirts which have been o
18、pened. If everything is in order, restart.第4题(A) Check that there is no leakage of gas, water, fuel or lubricating oil. Especially observe the fuel lines, HP fuel pumps and injectors. 第4题(B) Watch the quantities emerging from the leak oil pipes! Check that the starting air manifold is not hot at any
19、 cylinder (leaky starting valve may cause explosion! After overhaul, the following instructions are important: - check pressure and temperature gauges. - check the automatic alarm and stop devices. - check the pressure drop over the fuel filter and lubricating oil filter.第2题(C) - check the oil level
20、 in the oil sump/oil tank. 第2题(D) Estimate the condition of the oil. - check the de-aerating of the engine circulating water system.第2题(A) - check the quantity of fuel leak. 第4题(C) - check the telltale holes for leaks.- check the circulating water quality第2题(B) - check the cylinder pressures. - list
21、en for jarring sounds. - check the crankcase pressure. - check the starting air manifold. Running-in is mainly intended to let piston rings wear to fit properly in the cylinder liner. 第3题(D) Do not continuously run at constant load during the running -in process (Fig. 4-4). It is important to vary t
22、he load several times. The ring grooves in the piston will have a different tilting angle at each load and consequently the piston ring has a different contact line to the cylinder liner wall.1. Paragraph 1 tells us that_.A. If we hear vibration sounds, we should stop the engine quickly, or allow it
23、 to operate at low speed for 5 minutes, then stop it and check everythingB. If we hear vibration sounds, we should stop the engine quickly, otherwise the engine will be stopped automatically after 5 minutesC. If we hear explosion sounds we should stop the engine then check everythingD. if we hear su
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 轮机 英语 关联 题库 最新 整理 翻译 解析
链接地址:https://www.31ppt.com/p-2326289.html