无锡项目投标方案(电气)中英文对照(中英文翻译电气专业招投标方案).doc
《无锡项目投标方案(电气)中英文对照(中英文翻译电气专业招投标方案).doc》由会员分享,可在线阅读,更多相关《无锡项目投标方案(电气)中英文对照(中英文翻译电气专业招投标方案).doc(42页珍藏版)》请在三一办公上搜索。
1、第三节 电气工程Section 3 Electric Works一、工艺流程图 Technological process Diagraminstallation preparationpipe interior wire layinginstrument installationcable layingequipment installationdebuggingnaked pipe installationcovered pipe installationtray wire fillisterlightning-protection earth engineeringsealed bus-
2、bar arrangement施工准备管路明敷管路暗敷管内穿线器具安装电缆敷设设备安装线槽安装防雷与接地施工调试母线安装二、电气安装质量控制点及控制措施 Quality Control Point and Control Measure on Electric Installation分项工程Sub-item 质量控制点Quality Control Point质量控制措施Quality Control Measure备注Remark施工准备 Construction Preparation材料计划、材料送审、施工方案Material plan, material review and app
3、roval, and construction program认真编制Work out carefully明管安装Openpipe installation位置、标高正确、接地良好The position and elevation are correct, and the grounding is good绘制综合图及管路接地大样图Draw integrated drawing and detail of pipeline grounding桥架线槽安装Installation on crane span structure slot标高准确、吊架安装、穿墙、楼板的防火处理、与其它专业管道的
4、间距Correct level, installation on hanger frame, fire protection treatment of through-wall and floor, clearance with other special pipeline绘制综合图、吊架安装图、防火处理大样图Draw integrated drawing, installation drawing of hanger frame, and detail of fire protection treatment穿线配线Threading distribution接线正误、导线涮锡、导线损伤Wi
5、ring correct error, conducting wire with rinsing tin, conducting wire with damage严格执行接线图、涮锡穿线时注意保护导线Strictly carry out wiring drawing, rinsing tin, pay attention to protecting the wire when threading电缆敷设Cable lay电缆平直、固定牢固、电缆弯扁度、标识Straight cable, firm fixing, cable bending, and identification落实图纸、规范相
6、关要求Implement requirements relating to drawing and specification焊接点Soldered dot焊接部位的接地电阻、焊点表面光滑饱满Ground resistance at welded position, and the surface at welded point is smooth and full焊接完成后测试焊接部位的接地电阻Test the ground resistance of welded position after finishing the welding. 器具安装Appliance installatio
7、n位置正确、安装牢固、观感良好The position is correct and installed firmly, the appearance is good.按绘制的机电综合图、表面器具布置平面图安装Arrange the plan installation according to electromechanical drawn integration diagram and surface appliance 调试Debugging系统运行的稳定性、运行的可靠性、绝缘摇测Operating stability, reliability, and insulating shake-
8、measure in system制订专项调试方案Work out the special debugging plan三、关键工序技术及质量控制保证措 Key Working Procedure and Quality Control Guarantee Measure1、镀锌钢管明敷设 Open Lay of Galvanized Steel Pipe本工程明敷设钢管均采用了镀锌钢管明敷设工艺。All open-lay steel pipes in the project adopt the open-lay technology of galvanized steel pipe. (1)
9、工艺流程 Technological process:Construction preparationSuspender and siphon prefabricatedThe position of the mensuration box and rootSuspender fixationBox fixationPipeline layoutSlot dealingGround line施工准备支吊架、弯管预制测定盒箱及固定点位置支吊架固定盒箱固定管路敷设沉降缝处理跨接地线(2)可上人的吊顶内以及不封闭式竖井通道内的配管为明配管,其管路走向及支架固定均应按明配管要求施工。The distr
10、ibuting pipe in suspended ceilings that can be entered into and shaft passages that are not closed is open. Both its pipeline direction and support fixture should construct according to requirements of open distributing pipes. (3)按设计要求用冷煨法把管子煨出所需的弯度,20mm以下管径的管子用手板煨管器,25mm以上管径用液压煨管器(或专用煨管器),煨弯处凹扁度应符合
11、规范规定。Use the simmering method to simmer pipes with a necessary bend according to design requirements. Pipes that the pipe diameter is less than 20mm may adopt a palm simmer pipe machine. Pipes that the pipe diameter is more than 25mm may use a hydraulic simmer pipe machine (or special simmer pipe ma
12、chine). The concavity at simmering bends should accord with specifications and regulations. (4)断管采用钢锯或无齿锯,需断切的管子尺寸准确,将管子置于压力钳口中心卡紧,断口平齐。断口处用锉将管口内外锉光,无毛刺,管内铁屑清除干净。Broken pipes adopt a hacksaw or a saw without teeth. The size of pipe needing to cut should be exact. Put pipes on the center of pressure
13、jaw, and keep fractures even. At fracture, fill the inner or outer of pipe orifice smoothly without any burr. The scrap iron in pipe should be cleaned clearly. (5)管子套丝采用套丝机,根据管子外径及扣距选用相应板牙,将管子用台虎钳或龙门压架钳紧牢固,再把绞板套在管端,均匀用力,不得过猛,随套随浇冷却液。丝扣不乱且干净清晰,管箍上好后,管口应对严,外露丝扣不应过长。The mantle fiber of pipe may adopt a
14、 mental fiber machine. Select corresponding dies according to the outer diameter and of pipe the pitch. Clamp the pipes firmly by using a vice or planer pressing pliers. Then cover the capstan on pipe ends. Exert evenly not too strongly, and pour the cooling fluid on it while covering. The clasp is
15、not in disorder and cleaned clearly. After pipes are hoped well, pipe orifices should be aimed at accurately. And the exposed clasp should not be too long. (6)镀锌钢管必须采用通丝管箍连接。不得采用熔焊跨接地线,应在连接处的两端用专用接地卡固定跨接接地线,镀锌钢管连接如下图所示:Galvanized steel pipes must adopt harness cord pipe hoops to connect. Do not adop
16、t fusion-welding bridge ground wires. Use the special ground card at two ends of joints to fix and bridge the ground wires. The connection of galvanized steel pipes is shown in the following figure. 镀锌钢管连接方法Connection on Galvanized Steel Pipe符号说明:Symbol Explanation1-镀锌钢管 Galvanized steel pipe2-接地卡Gr
17、ound card3-接地线Ground wire4-通丝管箍 Harness-cord pipe hoop(7)严格按图纸要求敷设管线,坐标与标高准确,固定牢固。管路敷设按规范要求加装接线盒,管箍连接处采用专用接地线卡跨接地线,线管进入盒、箱处,按设计要求预留孔、洞,待稳住盒、箱后再进行下道工序,需加装护口处应及时加装护口。Lay pipelines strictly according to requirements in drawing. Both coordinates and levels are accurate and the pipelines should be fixed
18、firmly. The pipe lay is asked to add a terminal box according to specification requirements. The joint of pipe hoop adopts special ground wire cards to bridge the ground wire. Spools are put into boxes. And holes and orifices are asked to pre-leave according to design requirements. Only after boxes
19、have been stable, carry out the next working procedure. A protective orifice should be added in time at the position that needs to add. (8)钢管沿墙过沉降缝敷设,按照下图进行敷设: Lay steel pipes through settlement joints along with wall, and carry out laying according to the following figure. 镀锌钢管明配过沉降缝安装方法Installing
20、Method of Galvanized Steel Pipe openly Laying Settlement Joints符号说明:Symbol Explanation1-预埋接线盒 Built-in terminal box2-伸缩缝 Expansion joint3-接地线 Ground wire4-金属软管 Metal hose5-锡焊 Soldering(9)管路固定及接地线做法详见下图:Pipeline fixture and ground wire are shown in the following figure. 管路固定及接地线做法Pipeline Fixture and
21、 Ground Wire符号说明:Symbol Explanation:1-镀锌钢管 Galvanized steel pipe2-接地卡 Ground card3-跨接地线 Bridge ground wire4-过路盒 Passing box5-接地线固定螺丝 Fixed screw in ground wire6-通丝管箍 Harness cord pipe hoop(10)管路过梁做法详见下图 The pipeline astillen is shown as in the following figure:管路过梁做法Pipeline Astillen符号说明:Symbol Expl
22、anation1-塑料胀栓 Plastic expanding bolt2-自攻螺钉 Self-tapping bolt3-离墙管卡 Wall-away pipe strap4-镀锌钢管 Galvanized steel pipe5-接地管卡 Ground pipe strap6-接地线 Ground wire7-管接头 Union joint8-过路盒 Passing box2、管内穿线 In-pipe Threading(1)工艺流程 Technological Process:选择导线穿带线扫管放线及断线导线与带线绑扎戴护口穿线导线接头线路检查绝缘摇测Lead selectionLine
23、 string Tube clearingLine pulling and cuttingColligation of the lead and lineProtection mouth wearingWiringLead tie-inLine checking and insulation testing(2)选择导线 Select Conducting Wires:1)根据设计要求选择导线规格及型号。Select the specification and model of conducting wire according to design requirements. 2)绝缘层抽检:
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 无锡 项目 投标 方案 电气 中英文 对照 翻译 电气专业
链接地址:https://www.31ppt.com/p-2325611.html