土木工程专业外文翻译.doc
《土木工程专业外文翻译.doc》由会员分享,可在线阅读,更多相关《土木工程专业外文翻译.doc(9页珍藏版)》请在三一办公上搜索。
1、Large span continuous beam bridge construction control content and method ofKeywords: large span continuous beam bridge; construction control;Abstract: in our country, the suspension bridge, arch bridge, continuous rigid frame bridge and other aspects of research and practice has achieved good resul
2、ts, but for large span prestressed concrete continuous beam bridge construction control technology of the relatively few studies. So the research and application of large span prestressed concrete continuous beam bridge construction control technology has very practical significance in engineering.
3、This paper first analyzes the influence of long-span bridges construction control factors, followed by the construction of the contents and methods of construction control, the control principle are elaborated.1 PrefaceThe construction of long span bridge to go through a complicated process, in this
4、 process will be a lot of certain and uncertain factors, leading to the bridge structure s actual status deviates from the theoretical calculation state. Therefore, the bridge construction control is the focus of the construction process by analyzing deviations which occur in the identification, ide
5、ntify problems and timely rectification, and the structure of the follow-up phase undertakes forecasting, make construction system is always in control.Effects of 2 factors in the construction control of 1Large span continuous beam bridge construction control the main purpose is to make the actual c
6、onstruction condition and maximize the ideal design ( alignment and stress ) coincide. To achieve these goals, we must fully understand the construction state may deviate from the theoretical design status of all the factors, so as to implement effective control of the construction of have a definit
7、e object in view.2.1 structure parameters 2 Regardless of the bridge construction control, the structure parameters are very important factors to consider, structural parameters control in the construction simulation analysis of basic information, whose accuracy directly affects the accuracy of anal
8、ytical results. In fact, the actual bridge structure parameters are generally very difficult to design for structural parameters of identical, there is always some errors, control of construction how to properly credited for these errors, so that the structural parameters of the actual structure par
9、ameters as close as possible to the bridge, is the first problem to be solved. Structure parameter mainly includes structure cross section dimension, structure the elastic modulus of the material, material density, coefficient of thermal expansion of materials, construction loads, prestressing or ca
10、ble force etc.2.2 construction technologyConstruction control for construction services, in turn, construction quality has a direct impact on the implementation of target of control. In addition to the requirements of construction technology must comply with the control requirements, the constructio
11、n control must be included in the construction conditions of non ideal brings the fabrication, installation and other aspects of the error, and make the construction state is maintained in the control of.2.3 construction monitoringConstruction control of bridge monitoring is one of the most basic me
12、thods. Monitoring includes stress monitoring, deformation monitoring. Because the measurement apparatus, instrumentation installation, measurement method, data acquisition, environment, errors exist, therefore, structure always exist error monitoring. In the control process, in addition to the measu
13、ring device, method to try to reduce the measurement error, in the control analysis must be included in the.2.4 changes of temperatureTemperature change on the stress and deformation of the bridge structure has great influence, this effect varies with the temperature change in different time on the
14、structure, state ( stress, deformation ) were measured, the results are not the same, if the construction control of neglected the factors, it is difficult to obtain the true state of the data structure thus, it is difficult to ensure the effectiveness of control, therefore, must consider the influe
15、nce of temperature change. Is generally a day the temperature variation in smaller morning as required to control data acquisition time. But for seasonal temperature difference and the bridge body temperature residual effects to attention.The 2.5 material shrinkage, creepOn the concrete bridge struc
16、ture, material shrinkage, creep of structural internal force, deformation has a greater influence, mainly due to the large span continuous beam bridge construction concrete common loading age short, each stage of age difference between the major cause, control should be carefully studied, in order t
17、o adopt reasonable, practical creep parameters and calculate model. Shrinkage, creep will also influence the bridge after the operational phase of the structure deformation, which is also the setting pre-arch factors need to be considered.Construction of the 3 control tasks and work contentThe bridg
18、e construction control task is to bridge construction process control 3 , to ensure that the construction process of bridge internal force and deformation of structure is always in the allowable safety limits, ensure that a bridge state (including the bridge linear and bridge structure internal forc
19、e ) meets the design requirements. The bridge construction control the control missions, the construction control work mainly includes the following aspects:3.1 geometric ( deformation ) controlThe method of construction, the bridge structure in the construction process to produce deformation ( defl
20、ection ), and the deformation of the structure will be affected by many factors, is very easy to make the bridge structure in the construction process of the actual position ( elevation elevation, position ) state to deviate from the expected state, so that the bridge could not smooth closure, or in
21、to a bridge linear shape and design do not meet the requirements, so we have to carry out control of bridge structure in construction, make its actual location in the state and the desired state between the error in the permissible range and into the bridge linear state meet the design requirements.
22、The 3.2 stress controlBridge structure in the construction process and the stress condition of bridge state and design accord with the construction control is the important issue to clear. Usually by structural stress monitoring to understand the actual stress state, if it is found that the actual s
23、tress state and stress state theory (Computational ) differential overrun must carry checks and regulation, which is within the allowable range change. Structure stress control is not so easy to find if the deformation, stress control not do ones best to structural damage, serious will happen struct
24、ural damage ( China Ningbo Zhaobaoshan Bridge Girder fracture is one example), therefore, must be the implementation of strict control on structural stress. Stress control of the project and the precision is not well defined, according to the actual situation, usually including:The structure caused
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 土木工程 专业 外文 翻译
![提示](https://www.31ppt.com/images/bang_tan.gif)
链接地址:https://www.31ppt.com/p-2325112.html