1、 Earth and rock damSummaryEarth and rock dam, with another name as local material dam,is mainly built with earth and rock materials near the site. It can be classified based on the materials it used, earth dam mainly with earth, sand, grit, and gravel, and rock dam mainly with rock ballast, gravel,
2、and exploded rocks.Features of earth and rock damStrong pointsWith convenient supply of materials, many building materials such as steel, cement, and timbers can be saved.With granular structure more suitable to foundation deformation, it demands less on the foundation.Very flexible from simple arti
3、ficial filling to highly mechanized construction, the procedure become simple, the construction become efficient, and the quality guarantee become easy.Simply structured, thecost is low, the operation is convenient, worksis reliable, and maintenance and height adding is convient. Weak pointsOverflow
4、 not allowed, spillway has to be built.Diversionless convenient, cost increases.Section larger, earth to be filled is easy to be affected by climate. This kind of difficult means possible extention of time limit and cost increaseEarth and rock dam typesBased on constructing ways, earth and rock dams
5、 can be classified into rolled ones of earth & rock, thrown rock-filled ones,rock-filled ones withdirectional detonation, ones with earth thrown into the water, and ones filled by hydraulic forces.Among them, rolled ones are most popular.Based on the earth proportion and the location of anti-seepage
6、parts, there are homogeneous (even-granular) dams, zoned earth dams, and dams with artificial anti-seepage materials. Strong points of homogeneous dams: one fold materials, simple process weak points: flat gradient, large section, weather-limited, strong water pressure in holes. Zoned dams are class
7、ified into ones with core anti-seepage and ones with front anti-seepage. Less amount of earth, less affect of season. interfering with the filling of the dam body. Less interference with the construction of the dam body. weaker anti-earthquake and uneven sinking. The anti-seepage parts of dams with
8、artificial anti-seepage materials use asphalt concrete, reinforced concrete or other artifical materials. Sometimes, the anti-seepage parts are in the dam front facing the upstream, sometimes, they are at the core of the dam. Working conditionsTrapeziform sectionEarth-rock dam is a water retaining s
9、tructure built with loose granules of earth and rocksfilled and roller compacted. With weaker strength between these granules, both upsteam and downsteam slopes have to be kept at acertain degree to avoid landslide. So the dam section is usuallytrapeziform.It can be destablized in two ways, simple s
10、lope sliding and sametime sliding of slope and foundation caused by shear damage.Its a difference from other structuresSeepage effectsWith a large section, the dam is generally kept from entire sliding unless caused by weak interlayers. Effected by water levels at the upsteam and downsteam, seepage
11、is easy to happen with streams passing the faying surfaces between the dam and foundation, and between dam earth and concrete buildings. The seeping streamsform a free water surface inside the dam. Under the surface, all the earth body is saturated. Dipped in the water, the earth become lighter in e
12、ffect. And its angle of internal friction is narrowed, and cohesive force weakened. With the hydrodynamic pressure from the seeping steams, more sliding of dam slopes is possible. When seeping steamsmove insoil,the dam body and foundation will be deformed from too steep hydraulic gradient.Sometimes
13、the dam even crashes.Scour effectIts anti-scour ability is weak because the cohesive force between earth granules is small. On the one hand, the rain water enters the dam and lower the stability of the dam, and on the other hand, the rain scour the dam surface along the slope. At the same time, the
14、waves inside the reservoir also wash out the dam surface, putting the surface in the risk of being damaged. Sometime,landslide even happens due to this.So effective protecting measures have to be taken for dam slopes both upstream and downstream.Sinking effectThe dam body and foundation will sink un
15、der their self weight and water load besides the space between earth granules. If it sinks too much, the elevation level will not be sufficient, and then the operation of the dam will be affected. And, too much uneven sinkage will cause fracture of the dam boday, and even a seepage passage, putting
16、the dam at risk.Other effectsIn freezing regions, an ice-covered layer will be formed over the reservoir when the temperature is below 0 degree. Then the bank slope and dam slope will be frozen together with the ice. When the ice expands, slopes will be pressed. In this way, the protecting slopes wi
17、ll be damaged. Besides, the clay above the water level will have holes and cracks effected by freezing and thawing. In summer, with water lost, the clay will cracked, making seepage much easier.Earthquakes have to be taken into account. They can make landslide more possible. If the foundation is mad
18、e of silty sand, liquidified damage is more possible.Materials for building earth and rock damObtaining raw material locally is a basic design principle. Generally speaking, familiar earth and rock materials can be used. exceptions include swampy soil, bentonite, surface soil, and other soil materia
19、ls containing organic matter not completely decomposed. therefore, dam type is often determined based on availability of earth and rock materials nearby the site. stockyard must be rich in storage and near in distance. As for the selection, technical and economic factors will be considered. The dam
20、bodyis mainly made up of dam shell, antiseepage, drainage, and protection slope. They work under different conditions, so they demand differently. Materials must be durable and suitable to their purpose.Antiseepage and structure of dam crestSeepage-proofing work for a dam must be based on structural
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 土石坝 水利水电专业英语论文英文对照及翻译 土石 水利水电 专业 英语论文 英文 对照 翻译

链接地址:https://www.31ppt.com/p-2325064.html