PLC 相关问题外文翻译材料.doc
《PLC 相关问题外文翻译材料.doc》由会员分享,可在线阅读,更多相关《PLC 相关问题外文翻译材料.doc(21页珍藏版)》请在三一办公上搜索。
1、PLC QuestionABSTRACT: This paper describes the main components of the PLC, and attention problems in use (such as the environment in use, the use of pre-note, etc.)Central Processing Unit (CPU) is the brain of a PLC controller. CPU itself is usually one of the microcontrollers. Aforetime these were
2、8-bit microcontrollers such as 8051, and now these are 16-and 32-bit microcontrollers. Unspoken rule is that youll find mostly Hitachi and Fujicu microcontrollers in PLC controllers by Japanese makers, Siemens in European controllers, and Motorola microcontrollers in American ones. CPU also takes ca
3、re of communication, interconnectedness among other parts of PLC controllers, program execution, memory operation, overseeing input and setting up of an output. PLC controllers have complex routines for memory checkup in order to ensure that PLC memory was not damaged (memory checkup is done for saf
4、ety reasons).Generally speaking, CPU unit makes a great number of check-ups of the PLC controller itself so eventual errors would be discovered early. You can simply look at any PLC controller and see that there are several indicators in the form. of light diodes for error signalization. System memo
5、ry (today mostly implemented in FLASH technology) is used by a PLC for a process control system. Aside form. this operating system it also contains a user program translated forma ladder diagram to a binary form. FLASH memory contents can be changed only in case where user program is being changed.
6、PLC controllers were used earlier instead of PLASH memory and have had EPROM memory instead of FLASH memory which had to be erased with UV lamp and programmed on programmers. With the use of FLASH technology this process was greatly shortened. Reprogramming a program memory is done through a serial
7、cable in a program for application development. User memory is divided into blocks having special functions. Some parts of a memory are used for storing input and output status. The real status of an input is stored either as “1”or as “0”in a specific memory bit/ each input or output has one corresp
8、onding bit in memory. Other parts of memory are used to store variable contents for variables used in used program. For example, time value, or counter value would be stored in this part of the memory. PLC controller can be reprogrammed through a computer (usual way), but also through manual program
9、mers (consoles). This practically means that each PLC controller can programmed through a computer if you have the software needed for programming. Todays transmission computers are ideal for reprogramming a PLC controller in factory itself. This is of great importance to industry. Once the system i
10、s corrected, it is also important to read the right program into a PLC again. It is also good to check from time to time whether program in a PLC has not changed. This helps to avoid hazardous situations in factory rooms (some automakers have established communication networks which regularly check
11、programs in PLC controllers to ensure execution only of good programs). Almost every program for programming a PLC controller possesses various useful options such as: forced switching on and off of the system input/outputs (I/O lines), program follow up in real time as well as documenting a diagram
12、. This documenting is necessary to understand and define failures and malfunctions. Programmer can add remarks, names of input or output devices, and comments that can be useful when finding errors, or with system maintenance. Adding comments and remarks enables any technician (and not just a person
13、 who developed the system) to understand a ladder diagram right away. Comments and remarks can even quote precisely part numbers if replacements would be needed. This would speed up a repair of any problems that come up due to bad parts. The old way was such that a person who developed a system had
14、protection on the program, so nobody aside from this person could understand how it was done. Correctly documented ladder diagram allows any technician to understand thoroughly how system functions. Electrical supply is used in bringing electrical energy to central processing unit. Most PLC controll
15、ers work either at 24 VDC or 220 VAC. On some PLC controllers youll find electrical supply as a separate module. Those are usually bigger PLC controllers, while small and medium series already contain the supply module. User has to determine how much current to take from I/O module to ensure that el
16、ectrical supply provides appropriate amount of current. Different types of modules use different amounts of electrical current. This electrical supply is usually not used to start external input or output. User has to provide separate supplies in starting PLC controller inputs because then you can e
17、nsure so called “pure” supply for the PLC controller. With pure supply we mean supply where industrial environment can not affect it damagingly. Some of the smaller PLC controllers supply their inputs with voltage from a small supply source already incorporated into a PLC.PLC which should pay attent
18、ion in the application is specially the control device which serves for the industrial production, usually does not need to take any measure, may use directly in the industry environment. But, when the production environment is too bad, the electromagnetic interference is special intense, or install
19、s uses improper, cannot guarantee PLC the normal operation, therefore should pay attention to the following question in the use. First, Siemens PLC maintenance 1, maintenance procedures, equipment, periodic testing, adjustment provisions (1) half-yearly or quarterly inspection PLC cabinet terminal c
20、onnections, and if time to re-loose strong local connection; (2) of the cabinet to the host power supply voltage of the monthly re-survey work; Second, the provisions of cleaning equipment on a regular basis (1) every six months or a quarter of the PLC to clean, cut off power to the PLC power supply
21、 to the power rack, CPU board and input / output board in turn be removed to purge, clean and then in turn installed in situ, will all link to resume evacuation call and start the host PLC. PLC box carefully sweeping health; (2) every three months to replace the power rack below the filter; three ma
22、intenance preparation, maintenance of order (1) ready before maintenance tools; (2) To protect the components and the template does not function no fault damage, must be protection devices and serious preparations for anti-static; (3) maintenance scheduling and operator contact before and well, be l
23、inked to overhaul licensing office hung maintenance card; 4, equipment and method of disassembly sequence (1) downtime, must be two or more monitoring operation; (2) the way the CPU on the front panel select switch from the Run to stop position; (3) Close the PLC power supply mains, and then close t
24、he other to the power supply module Osaka; (4) connected to the power supply rack power cord clear line number in mind and remove the link location, then remove the power rack and rack screws connected, power rack can be removed; (5) CPU motherboard and I / 0 board in the bottom of the screw rotatio
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- PLC 相关问题外文翻译材料 相关 问题 外文 翻译 材料

链接地址:https://www.31ppt.com/p-2324819.html