79_红带_设计阶段 RB_Design_Tollgate.ppt
《79_红带_设计阶段 RB_Design_Tollgate.ppt》由会员分享,可在线阅读,更多相关《79_红带_设计阶段 RB_Design_Tollgate.ppt(9页珍藏版)》请在三一办公上搜索。
1、8/19/2006 Design,Revision 5.1 For Internal Use Only-All Rights Reserved-The Manitowoc Company,1,Design Tollgate设计阶段 Design Module设计模块,Revision 修订本5.1:8-19-06,8/19/2006 Design,Revision 5.1 For Internal Use Only-All Rights Reserved-The Manitowoc Company,2,4.0 设计方案,1.0 定义,2.0 测量,3.0 分析,4.0 设计,5.0 验证,It
2、ems in tan are also DMAIC tasks,and are not specifically re-taught in the DFSS program,8/19/2006 Design,Revision 5.1 For Internal Use Only-All Rights Reserved-The Manitowoc Company,3,4.0 Design Solution,1.0 Define,2.0 Measure,3.0 Analyze,4.0 Design,5.0 Verify,Items in tan are also DMAIC tasks,and ar
3、e not specifically re-taught in the DFSS program,8/19/2006 Design,Revision 5.1 For Internal Use Only-All Rights Reserved-The Manitowoc Company,4,Design Summary设计总结,The activities of Red Belts are to provide design support and are to actively support and drive solutions to“Design Issues”and“Pugh Matr
4、ix”trade off decisions as soon as possible to reduce the risk to the project.The success of every project depends on the sub team contributions红带培训旨在于提供设计支持并且积极地支持和推动“设计问题”的解决,以及利用皮尤矩阵对方案进行对比研究以降低项目的风险。每个项目的成功取决于团队成员的贡献。Key Questions Answered in this step:此步骤关键问题的解答:What are the key design elements
5、that the final design must include?最终设计必须包括哪些关键的设计因素:How do we prioritize these design elements?如何优先排列这些设计因素?How can we distribute the design work among sub-teams?如何分配工作给设计团队?How do we ensure that these sub-teams communicate effectively with each other during the design process?如何确保设计团队成员在设计过程中进行了有效
6、地交流?At what point do we“freeze”the design?在哪个结点上,可以“冻结”设计?How do we test the design to ensure that it will work before implementation?在设计实施之前,通过怎么的试验确保该设计没有问题?How do we identify weak points in the design that may be susceptible to failure?如何界定设计中可能会导致失效的缺点/弱点?How do we plan to pilot to ensure that i
7、t is realistic and produces meaningful results?怎样计划并确保设计产品的可行性并且产出好的产品?,8/19/2006 Design,Revision 5.1 For Internal Use Only-All Rights Reserved-The Manitowoc Company,5,DESIGN Tollgate Review Questions设计阶段评审问题,Customer Requirements客户要求Have the customer requirements changed?客户要求有无变化?Describe the propo
8、sed design and its predicted capability.描述提议的设计方案和预测的能力?Internal Requirements内部要求How many intermediate levels of design are necessary before all decisions are made?在决定之前,有多少中等水平的设计是必须的?What are the key elements of the design that are fulfilled by the work that has been completed?在完成的工作中,实现了哪些关键设计因素?
9、How did we prioritize the design work?如何优先排列设计工作?How do we prioritize the work into sub-teams?如何优先排列设计团队的工作?How do we ensure that the sub teams communicate effectively with each other during the design process?如何确保设计团队成员在设计过程中进行了有效地交流?How do we test the design on paper to get a degree of confidence
10、that it will work before implementation?在设计实施之前,通过怎么的试验,可有有信心的确保该设计没有问题?How do we identify weak points in the design that may be susceptible to failure?如何界定设计中可能会导致失效的缺点/弱点?How do we test the design after it is complete?设计完成后,如何试验该设计?Are the proposed benefits still expected?预计的效益是否还存在?What is the es
11、timated investment?估计的投资是多少?When will the project be completed?项目何时完成?Risk Management风险管理What items in the risk abatement plan are unresolved?风险计划中的哪些项目还没有解决?What will the early warning plan have to include?预警计划中应该包括哪些内容?Other其他Summarize the Robust Design&Tolerance Design Activities.总结稳健设计和公差设计活动Sum
12、marize the part/raw material procurement plan and manufacturing plan.总结部件/原材料采购计划和生产计划.,8/19/2006 Design,Revision 5.1 For Internal Use Only-All Rights Reserved-The Manitowoc Company,6,Design Tollgate 设计阶段,Goal目标Develop high level detailed design 开发高层次详细设计Test Design Components设计部件试验Complete Pilot Te
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 79_红带_设计阶段 RB_Design_Tollgate 79 设计 阶段
链接地址:https://www.31ppt.com/p-2224200.html