设备培训 500kv GIS的结构原理培训.ppt
《设备培训 500kv GIS的结构原理培训.ppt》由会员分享,可在线阅读,更多相关《设备培训 500kv GIS的结构原理培训.ppt(39页珍藏版)》请在三一办公上搜索。
1、Circuit Breaker ELK SP3,Circuit Breaker ELK SP3,Puffer piston principle,Interrupter Unit ELK SP3,closed,extinguish,open,commutate,Puffer piston principle,Circuit Breaker ELK SP3,for the operation rod of the circuit-breaker,1SF6-gas2impact seal for the OPEN position3seal for axial movement4impact sea
2、l for the CLOSED position,Double Sealing System,Type:HMB8Piston stroke:205 mmSwitching sequence:O-CO-1min-CO or CO-30sec-COMounting position:vertical/horizontalDisk spring assembly:16 x 485 mmWeight(total operating mechanism):468 kg,CB Operating Mechanism HMB8,High pressure part,Differential pistono
3、perating principle,Low pressure part,CB Operating Mechanism HMB8,High pressure part,Low pressure part,CB Operating Mechanism HMB8,Charging Module(HMB8),Pump motorGearOil gaugeHydraulic pump unitOil drain,Control Module(HMB8),Changeover valvePilot valves-two opening valves-one closing valveThrottle s
4、crews open/closeHigh-pressure test connector,Monitoring Module(HMB8),Spring limit switch with rotating shaftSpring tension indicatorPressure release valve,Disconnector ELK T.3,ELK TE3,ELK TX3,ELK TV3,ELK TW3,Overview of types,Disconnector Contacts,Disconnector and Earthing Switches,disconnector,eart
5、hing switch,fast-acting earthing switch,Maintenance Earthing Switch ELK EM3,with operating mechanismand earthing bridge acrossthe isolation,Maintenance Earthing Switch ELK EM3,Fast-acting Earthing Switch ELK EB3,with operating mechanismand earthing bridge across the isolation,Fast-acting Earthing Sw
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 设备培训 500kv GIS的结构原理培训 设备 培训 500 kv GIS 结构 原理
链接地址:https://www.31ppt.com/p-2204309.html