1、New Product DevelopmentNPD(新產品開發流程),陳堅慈(Fred Chen),June 14-2002,2,為何需要新產品開發與流程?,新產品開發是什麼?一個團體根據需要,訂定計劃,組織人員,開發設計與驗證樣品,並使之能大量複製與販售之過程稱之新產品開發流程.為何需要新產品開發?一個以服務產生營利之團體,為使之利潤來源能持續不斷,必需在 原有產品利潤降低或開拓新事業領域時,進行新產品開發以維持適當利潤使團體存活.新產品開發風險 大量複製代表大量材料與金錢投入,若產品有任何重大瑕疵,將會造成產品退貨,輕者損失商譽賠錢解決,嚴重可能使公司經營發生困難降低風險提升利潤 經由適
2、當有效流程控制,複製經驗,確保產品開發品質控管機制,以提升量產之品質,減低公司營運風險;經由經驗分享,減少犯錯機會,降低開發時間,使產品快速上市,以取得最佳利潤.,3,PDCA Loop,Plan:To have a plan,(What it is,How and When to do,How to check)Do:Follow plan to do Check:Follow plan to do checking Action:To assess the effectiveness of result with plan,PDCA(Plan/Do/Check/Action),Plan,D
3、o,Check,Action,(Quality/品質,Cost/成本,Delivery/交期),4,Life Cycle of Product,市場Marketing,終止End of Life,企劃Planning,開發設計Design,試作/Sample評價/Evaluation,試產Pilot Run,量產Mass Production,5,Resource of Development,Product Design Capability,POWER,Publication,Product Engineering,ThermalDesign,MechanicalID,BIOSS/WF/W
4、,ElectronicHardware,Reliability Testing,Compatibility Testing,TestingProgram,Testing Fixture,PCBLayoutSimulation,Pre_Load,Manufacturing,EMC/Safety,6,Concept Design,DVT,MVT,EVT,Mass Production,Start,Planning,EVT:Engineer Verification Test,DVT:Design Verification Test,MVT:Manufacturing Verification Te
5、st,Product Development Control Flow,Pass,Pass,Pass,Fail,Fail,Fail,Gating,Gating,Gating,開發設計DevelopmentDesign,樣品製作Sample Build樣品評價VerificationValidation,試產Pilot Run,NPD,NPI,NPD:New Product Development NPI:New Product Introduction,7,NPD/NPI,NPI Operation,Mass Production,ODM Project,OEM Project,NPI Ope
6、ration,NPDOperation,NPI:New Product Introduction Focus on a product be phased in manufacturing related activities.NPD:New Product Development Except the NPI activities,It also included product design and design verification and validation related activities.,Pass,Fail,Gating,NPI Operation,8,NPI(New
7、Product Introduction),NPI:A process to make a product be produced,delivered to customer or market.,Product document transferring,Pilot Run,Mass Production,Yield rate improvement,Technical/Quality requirement,Failure analysis,reliability test,Early Manufacturing Involvement,DFM/DFT review&feedback,Ma
8、nufacturing Readiness Review,Plan,Tooling,spec.,document,Set up project team,Project team list,depends on cooperation model,E.C.M.,Prototyping 1,2,Sample making,E.C.M.:Engineering Change Management:ECR/ECN,9,ECR/ECN in PDM,10,QualityManual,Function Procedures&Product Instructions,Individual Product
9、spec.,Drawing,etc.,(大QM),(500 q),Current Structures,T.P.D.,OF,Product,Material,Method(Process),Machine,BOM,Drawing,Spec.,Instruction,T.P.D.Related,Within Dept.,Cross Dept.Cross Function,New Structures,SOM*/Dept.40 Books10+chapters,TPD in Quality System Structure,Date:Apr.20,2000,Management Manual:Up
10、dated and globalized QM+Gen.etc.(ADM/FD/MIS/Supporting Groups),Revise Upgrade,(0),(1),(2),(3),(4),(5),(6),(7),1999 2000 Standard for International and Global,(8),TQA,TQM,Best Class,INTERNALCEGE,EXTERNAL,FEEDBACK/INTERNAL,FOLLOW UP,EXT.CUSTOMER,ECN,ECR.,CI.,FOLLOW UP CI/ECN.,Procedure,T.P.D,ECR,CI&EC
11、N FLOW,HQ DC,SITE DC,Standardization Implementation,SITE QRB/DC,QRB,DC,PM,MM/TPD,SOM,TPD:Technical Product Document,11,NPI TPD Documentation,12,Concept Design,DVT,MVT,EVT,Mass Production,Start,Planning,EVT:Engineer Verification Test,DVT:Design Verification Test,MVT:Manufacturing Verification Test,Pa
12、ss,Pass,Pass,Fail,Fail,Fail,Gating,Gating,Gating,開發設計DevelopmentDesign,樣品製作Sample Build樣品評價VerificationValidation,試產Pilot Run,NPD,NPI,NPD:New Product Development NPI:New Product Introduction,Product Development Control Flow,13,What is EVT/DVT/MVT?,Purpose:Increase Product Development Quality Reduce
13、Risk of Development and Cost.,EVT:Engineering Sample Verification Test-Early engineering sample meet product specification requirement without severity bugs,the sample may be made by mechanical mockup,earlier version hardware and software.-With small sample quantity,less test resource involvement,Ke
14、y and critical test items to verify the sample.DVT:Design Readiness Verification Test-Design mature engineering sample meet product specification requirement without bugs,the sample should be tooling mechanical parts with near mature hardware and software.-With enough sample quantity,conduct all des
15、ign test item to do verification to ensure product design readiness.,14,MVT:Manufacturing Readiness Verification Test-Manufacturing quality level sample-Pilot run with small quantity manufacturing to come out optimization parameter for mass production-Conduct manufacturing point view verification wi
16、th quantitative sample to test product early life performance-Prepare parts for after service requirement-Got related regulation and certification for product-Ready for mass production,What is EVT/DVT/MVT?,15,Planning,Requirement of Product,Technology Feasibility,Business Feasibility,Project Plan,Sp
17、ecification(H/W,ID/Mechanical,S/W,Regulation)Schedule Statement Of Work(Scope Of Work)PM,Team List Cost Sample plan Budget,Customer Product Marketing,Internal Capability External Supporting,16,Team member and Responsibility,BU Head,PM(Project Manager),H/W(Hardware Design),S/W(Software Design),MD(Mec
18、hanical Design),PowerPCB Layout,EMCHomologation,Safety,Logo Certification,Hardware FunctionTest,Compatibility Function Test,Stability/Reliability Test,Mechanical Test,PE(Product Engineer),Manufacturing Process,Manufacturing Testing,Manufacturing Equipment,Manufacturing QA,PM:Owner to coordinate NPD
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NPD 新产品开发控制课件 新产品开发 控制 课件

链接地址:https://www.31ppt.com/p-2136977.html