施工图深化设计要求标准(DOC79页).doc
《施工图深化设计要求标准(DOC79页).doc》由会员分享,可在线阅读,更多相关《施工图深化设计要求标准(DOC79页).doc(79页珍藏版)》请在三一办公上搜索。
1、施工设计提交成果Deliverables of Construction Drawings灯光照明Lighting对于灯光照明专业施工图设计深度标准及技术深度文件现规定如下:The design depth and technical scope of special lighting working drawing are specified as follows:一.各区域,各房间的照度计算书及灯具选型、灯位布置;I Illumination calculation sheet and type selection and positioning of lights each in roo
2、m in all areas;二.照明控制系统中所采用设备的说明书;II Instructions of equipment used in the lighting control system;三.灯具资料表(用EXCEL表格做出,格式如下,第一行内容为示范);III Data sheet of lighting (in EXCEL, with the format as follows; contents in the first row are filled in as an example);序号No. 编号S/N设备位置Equipment position品牌Brand 设备型号E
3、quipment model光源Light sources 设备数量Equipment quantity 产地Origin 图片Picture 1VASLED I-Panel/RGB-PL-12030-A9颗whiteLED3000K10W14广州Guangzhou 234567总计1479 / 79四. 对施工图纸的要求如下:IV. Requirements for Construction Drawings 用于设计方案阶段的一套完整的图纸至少应包括封面、图纸目录、工程设计说明及图例、设备材料清单、系统图、平面图。A complete set of drawings used in the
4、 design stage shall at least include the cover, drawing content, engineering design instructions and graphic symbols, list of equipment and materials, system diagram, and plan view.用于施工阶段的图纸至少应包括封面、图纸目录、工程设计说明及图例、设备材料清单、系统图、平面图及设备的安装大样图。A complete set of drawings used in the construction stage shall
5、 at least include the cover, drawing content, engineering design instructions and graphic symbols, list of equipment and materials, system diagram, plan view, and the detail drawing of equipment installation.照明专业图纸范围如下:Scope of drawings for lighting is as follows:必须包括封面、图纸目录、工程设计说明及图例、设备材料清单、系统图、平面图
6、、机房设备布置图、安装大样图。安装详图根据项目情况,应由设计师根据项目的可实现性和各专业分项工程的配合决定绘图深度,设计出满足项目需求的可实施的拓展性安装详图。It shall include the cover sheet, drawing content, engineering design instructions and graphic symbols, list of equipment and materials, system diagram, plan view, layout of equipment in equipment room, and detail drawin
7、g of equipment installation. Feasible and extendable detail drawing for equipment installation shall be designed according to the project situations by the designer who shall decide the depth of drawing according to the project feasibility and coordination between all subdivisional works of each dis
8、cipline to satisfy the project requirements. 4.1封面 Cover封面应包含项目名称、图纸性质(初步设计、施工图、竣工图等)、公司名称、日期。The cover shall bear the project name, drawing property (preliminary design, construction drawing, as built drawing, etc.), company name, and date.4.2图纸目录 Drawing content 图纸目录应包含以下内容:项目名称、项目编号、设计公司名称、专业、图纸名
9、称、图纸编号、图幅、出图日期、制图人及审核人等内容。The drawing content shall include the following: project name, project ID, name of design corporation, discipline, drawing name, drawing number, sheet, drawing finishing date, the person who draws, and the auditor.4.3工程设计说明及图例 Engineering design instructions and graphic sym
10、bols设计总说明须包括但不限于:工程概况、设计依据、各子系统施工内容、施工要求和注意事项、设计特殊要求和施工配合要点、设计范围内智能化系统与相关专业的技术接口要求、图例符号等。The general design instructions shall include, without limitation to: Project profile, design basis, construction contents of each sub system, construction requirements and notices, special design requirements a
11、nd key points in construction cooperation, technical interface requirements for the intelligent system and relevant disciplines within the scope of design, graphic symbols, and so on.4.4设备材料清单 List of equipment and materials在材料表中的图形符号图例应采用国标,其次是部标、行标。未予规定的自拟图形图例,应在图例中标出且加以说明。当使用国标图形图例,又给予不同含义时也应加以说明
12、,一套图纸的图例符号应前后一致。Graphic symbols in the list of materials shall adopt those in national standards, followed by ministerial standards and industry standards. Self made graphic drawings not specified shall be marked in the graphic symbols with explanations. Explanations shall also be given when graphic
13、 symbols in national standards are given different meanings. The graphic symbols used in one set of drawings shall be in consistence with each other. 设备材料清单,按系统开列组成系统主要设备和材料,应标明设备名称、规格型号、主要技术指标、品牌(产地)、数量。非标设备、材料应备注说明技术要求。The list of equipment and materials shall list the major equipment and material
14、s constituting the system, with an indication of the equipment name, specification and model, key technical indicators, brand (origin), and quantity. Technical requirements for nonstandard equipment and materials shall be marked.各个平面图、设备房图应随附图例并标注数量。包括电脑、软件、编程工具、机柜、电源、变压器等设备材料都必须在图纸上或设备材料中体现出来,并且注明型
15、号、规格、数量总和。All plan views and equipment room drawings shall be attached with graphic symbols and quantity. Equipment and materials including computers, software, programming tools, cabinets, power supply and transformers shall be indicated in the drawings or list of equipment materials, with clear in
16、dication of the model, specification and total quantity.4.5系统图System diagram4.5.1照明供配电系统图:应注明系统结构、主要配置、终端分布、主干线缆、供电要求、文字说明等。具体设计原则请参考民用建筑电气设计规范JGJ 16-2008第3章,第4章。当有类似5D剧场有人员参与演出涉及舞台照明时,舞台照明的供电与负荷计算应参照民用建筑电气设计规范JGJ 16-2008第9章9.6节的相关规定。Drawing of lighting power supply and distribution system: With cle
17、ar indication of the system structure, major configuration, terminal distribution, trunk cables, power supply requirements, explanatory notes, etc. For detailed principles for design, please refer to chapters 3 and 4 of JGJ 16-2008 Code for Electrical Design of Civil Buildings.When there are personn
18、el participating in the stage show in likely-to-be 5D theater with stage illumination involved, power supply and load calculation of stage illumination shall refer to the related regulations of Section 9.6, Chapter 9 of JGJ 16-2008 Code for Electrical Design of Civil Buildings.注意:Notes:1.当采用可控硅做调光设备
19、时,其电源变压器宜采用接线方式为/Y0的变压器。When SCR components are used as dimmer device, the supply transformer shall be / Y0 transformer.2.为抑制高次谐波对照明控制装置及其它系统设备的干扰,除应满足民用建筑电气设计规范JGJ 16-2008第22章第22.3节的规定外,还应注意:电声,电视转播设备的电源不宜接在照明用电变压器上。To restrain the interference of ultraharmonics on illumination control devices and
20、other system equipments, except that the regulations of Section 22.3, Chapter 22 of JGJ 16-2008 Code for Electrical Design of Civil Buildings shall be met, shall take note of the following: the power supply of electroacoustic and television relay equipment shall not connect to the transformers for i
21、llumination.4.5.2配电箱系统图:应标注配电箱编号、型号、进线回路编号;标注各开关(或熔断器)型号、规格;标注出线回路编号、导线型号规格;负荷量;对于单相应标明相别;并标明负荷名称。具体设计原则请参考民用建筑电气设计规范JGJ 16-2008第7章,建筑照明设计标准GB 50034-2004第7章。System diagram of switch box: It shall indicate the switch box No., model, and lead-in loop No.; it shall also indicate the model and specifica
22、tion of switches (or fuses), outgoing line loop No., and model and specification of leads, as well as the load capacity; the phase sequence shall be marked for single-phase wire; the load name shall also be marked. For details, please refer to chapter 7 of JGJ 16-2008 Code for Electrical Design of C
23、ivil Buildings and chapter 7 of GB 50034-2004 Standard for Lighting Design of Buildings. 4.5.2.1配电箱系统图须考虑三相平衡,三相配电干线的各相负荷宜分配平衡,最大相负荷不宜超过三相负荷平均值的115%,最小相负荷不宜小于三相负荷平均值的85%。In making the system diagram of switch box, equilibration of the three-phase system shall be considered; load on each wire of the
24、three-phase distribution trunk shall be distributed in equilibration; the maximum phase load shall not exceed 115% of the mean loads of the three-phase system, and the minimum phase load shall not be smaller than 85% of the mean loads of the three-phase system. 4.5.2.2如有供给气体放电灯的三相配电线路,其中性线截面应满足不平衡电流
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 施工图 深化 设计 要求 标准 DOC79
![提示](https://www.31ppt.com/images/bang_tan.gif)
链接地址:https://www.31ppt.com/p-2085774.html