1、 陕西瑞森建设工程有限公司 嘉民西安电子商务产业园 地面施工专项方案 室外道路、仓库地坪 施工方案 陕西瑞森建设工程有限公司 2016年元月21日 室外道路施工方案及仓库地坪施工方案1 Plant Roads and Warehouse Terrace1 、厂区道路及仓库内地坪 1.1 Construction Conditions1.1 施工条件1. Construction conditions1、 施工条件 (1) Road construction drawing arrives on the site, which can be used as basis for construct
2、ion after drawing triage.(1) 道路施工设计图纸到达现场,并经过图纸会审,可作为施工根据。 (2) Relevant materials have been prepared.(2) 相关材料已准备完善。 1.2 Construction Arrangement1.2 施工布署 1.2.1 Functions of Major Managers in Plant Roads and Warehouse Terrance Areas1.2.1 厂区道路、仓库地坪区域主要管理人员职能1. Construction director, technicians and con
3、struction workers: be responsible for supervision, control and disclosure of all construction technologies, control on safety quality schedule and filling of construction materials including construction journal in their own working part; and be responsible for site safety and technical disclosure.1
4、、 施工主管、技术员、施工员:负责本部位的全部施工技术监控以及工艺控制、交底,安全质量进度的控制,施工日记等施工资料的填写;负责现场安全、技术交底工作。2. Quality inspectors: be responsible for quality inspection of each item in their own working part, connecting with main-contractor and supervisor, accepting works in their own working part operated by other relevant units,
5、 and various materials collecting and filing them to the data room.2、 质检员:负责该部位各分项的质量检查、联系总包及监理及其他相关单位对该部位的验收工作,还有各种资料的收集、交资料室归档等工作。3. Safety supervisors: be responsible for safety works in the project, be responsible for safety supervising and organizing groups for safety learning under the safety
6、directors guidance, and be responsible for filling and arranging safety materials with attentions paid to process control, and finding and eliminating safety risks timely for preventions.3、 安全员:负责项目的安全工作,安全员在安全主任指导下负责本部位的安全监督及组织班组进行安全学习,负责安全资料的填写、整理,注重过程控制,及时发现并消除安全隐患,做到防患于未然。 4. Measuring group: co
7、nduct horizontal control and axis control on the site, and retest the site elevation and axis coordinate.4、 测量组:严格按照施工专项方案、规范及设计图纸要求,对现场进行水平控制、轴线控制、对现场高程及轴线坐标进行复测。 1.2.2 Main Construction Process1.2.2 主要施工流程Specific construction process of outdoor roads: staking out in surveytrench excavationpipe la
8、yinghandling of foundation trenchroadbed constructionpavement concrete pouringcurb constructionroadside backfill室外道路具体施工顺序:测量放样沟槽开挖 管道敷设基槽处理路基施工路面混凝土浇筑 路侧石施工路边回填土Specific construction process of warehouse terrace: clear up the cultivated soil to old soil layer if any cultivated soilrammed earthindoo
9、r backfill and tampingstable layer of lime-fly ash stabilized aggregatepolyethylene waterproof layingC30 concrete (with steel fiber in it)surface treatment (polishing, dust-collecting, spreading carborundum evenly on the surface, and surface hardening).仓库内地坪具体施工顺序:如有耕土应先清除耕土至老土层素土夯实室内回填并夯实二灰碎石稳定层聚乙烯
10、防水膜铺设 C30砼(内掺钢纤维)表层处理(打磨、吸尘、面层均匀铺洒金刚砂、表面硬化)。 1.2.3 Labor Organization 1.2.3 劳动力组织Scientific and rational labor organization is one of the important factors for successful project proceeding, distributing labor power timely according to project actual schedule. We will assign the mose excellent and e
11、xperienced construction team to work on the site through investigation, which will be trained for safety knowledge before operating and organize technical disclosure in a serious manner. The personnels in special work types should work with certificates, getting down to work as soon as entering the
12、site in time.科学合理的劳动力组织,是保证本工程顺利进行的重要因素之一。根据工程实际进度、及时调配劳动力。我们将通过考察指定最优秀的、有丰富经验的施工队伍进驻本现场。进场作业前进行安全知识教育培训,认真组织技术交底。特殊工种持证上岗,按时入场后迅速进入工作状态。Major Labor Force Schedules主要劳动力计划表No.序号Work Type工种Unit单位Quantity数量Working Scope工作范围1.Mason泥工person人20Curb bricklaying路侧石砌筑2.Concrete worker砼工person人15Concrete pou
13、ring砼浇筑3.Welder焊工person人2Embedded iron预埋铁件4.Electrician电工person人2Electric for site construction现场施工用电5.Back man杂工person人20Site maintenance, cleaning, etc.现场维护、清理等 1.2.4 Main Machinery Equipment Plan for Construction Site 1.2.4 施工现场主要机设备计划Main Machinery Equipment Plan for Construction Site施工现场主要机械设备计
14、划No.序号 Machine (equipment)/Name and Specification机械(设备)/称名规格Unit单位Quantity数量Power KW功率KWGross PowerKW总功率KWRemarks备注1Road roller 20t压路机20tSet台12Excavator 400挖土机400Set台23Electric welder BX700电焊机BX700Set台270140Marked已标识4Plate vibrator平板振动器Set台25Internal vibrator type 75插入式振动棒75型Set台34166Concrete carrie
15、r/10m3砼运输车/10m3Set台12/7Diving pump/Q50潜水泵/Q50Set台35202 for reservation2台备用8Level instrument/AL332水准仪/AL332Set台1/Qualified in forced inspection, within valid period强检合格,在有效期限内9Total station instrument/BTS-6082CL全站仪/BTS-6082CLSet台1/Qualified in forced inspection, within valid period强检合格,在有效期限内10Theodo
16、lite经纬仪Set台1/Qualified in forced inspection, within valid period强检合格,在有效期限内Project in this part plans to firstly construct fire-fighting lanes near of W-3 / W-4, warehouse terrace in the same time and finally, the heavy vehicle roads, truck parking space and goods handling area. The bicycle shed sho
17、uld be constructed alternatively in accordance with site situation.本部分工程拟计划先施工靠近W-3、W-4仓库的消防车道。同时施工仓库内地坪,最后施工重型道路、货车停车位及装卸货区域。自行车棚根据现场实际情况穿插进行。 1.3 Main Project Construction Methods1.3 主要项目施工方法 1.3.1 Construction Preparation1.3.1 施工准备 1. Site preparation1、 现场准备 (1) Adopt warning belts for temporary
18、enclosure on both sides of the construction road according to section construction sequence on the site.(1) 按照现场分段施工的顺序,对施工道路两边采用警戒带进行临时围蔽。 (2) Axis and elevation testing has been completed.(2) 轴线及高程复核工作已完成。 2. Technical preparation2、 技术准备 (1) Drawing triage has been completed. (1)图纸会审已完成。 (2) Give
19、dual attention to construction scheme compiling, and pay attention to key points focused, with construction drawings, construction rules, quality standards and operating regulations as guidance documents for construction organization.(2) 编制施工方案要兼顾全面,突出重点。以施工图、施工规范、质量标准、操作规程作为组织施工的指导文件。 (3) Organize
20、and arrange labor force and technical power, and establish organization for construction technology and machinery managing, according to work amount of sub-project.(3) 根据分项工程的工程量,组织、安排劳动力和技术力量,建立施工技术,机械管理机构。 1.3.2 Engineering Survey Control1.3.2 工程测量控制1. Surveying and lining1、 测量放线Before road constr
21、uction, it is necessary to re-check road axis and elevation, and conduct staking out in survey after there is no error in the recheck.道路施工前,必须进行道路轴线以及高程的复核,复核无误后方可进行测量放样。The rechecking method is adopting total station instrument to conduct traverse closure according to the coordinate points offered
22、by the proprietor, with the horizontal coordinate control complying with precision requirements of second-order traverse and elevation control deviation complying with precision requirements of third-order level, which are controlling points in construction measuring.复核方法为采用全站仪根据业主给出的坐标点进行导线闭合,平面坐标控
23、制符合二等导线精度要求,高程控制误差符合三等水准精度要求,作为施工测量控制点。Adopt level instrument to introduce the site level elevation to the existing buildings, which is the basis of measuring channel elevation. The elevation controlling line should be introduced to the several existing buildings from one point to the surrounding ac
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 室外 道路 施工 方案 仓库 地坪
链接地址:https://www.31ppt.com/p-1943148.html