1、A bituminous surface treatment,A bituminous surface treatment (BST), also known as a seal coat or chip seal, is a thin protective wearing surface that is applied to a pavement or base course. BSTs can provide all of the following:A waterproof layer to protect the underlying pavement. Increased skid
2、resistance. A filler for existing cracks or raveled surfaces. An anti-glare surface during wet weather and an increased reflective surface for night driving.,Historically, BSTs have been in use since the 1920s, primarily on low volume gravel roads. BSTs are increasingly in use as a preventative main
3、tenance procedure on flexible pavements of good structure.,Purpose A BST offers preventive maintenance from the effects of sun and water, both of which may deteriorate the pavement structure. BSTs create a new wearing course, as well as a waterproof covering for the existing pavement. A BST makes it
4、 more difficult for water to enter the base material, and preventing freeze thaw damage for those locations with below freezing temperatures.,BSTs also increase the surface friction of the pavement, due to the addition of the cover aggregate. This combats the effects of raveling, which can make the
5、pavement slippery and stopping difficult. A BST gives good, gripping texture to the pavement surface.,BSTs should be applied to a distress-free to moderately distressed pavement surface. A two to four year service life is common, while five year service lives are achievable.,Materials BSTs are creat
6、ed using two main materials: asphalt and a cover aggregate.,Asphalt Asphalt (as asphalt binder, cutback asphalt or asphalt emulsion) and aggregate (uniformly graded). The asphalt is typically an emulsion. Care must be taken with the weather on the day of construction ideally, a warm day with low hum
7、idity is preferred.,BSTs should never be constructed on rainy days or when rain is predicted. Rain can dilute the asphalt binder if it has not yet cured, bringing the binder to the top of the cover aggregate; after the water evaporates, tires can pick up the loose aggregate or track binder across th
8、e surface.,Cutback Asphalt While cutback asphalt is historically an option for BSTs, the solvent used (usually gasoline or kerosene) is expensive and potentially dangerous. A cutback is asphalt dissolved in a solvent, allowing the asphalt to be pumped and sprayed without heating it to high temperatu
9、res.,The solvent evaporates into the surrounding air, leaving the asphalt binder. Once the solvent has completely evaporated, the cutback has cured. Fast setting time cutbacks use gasoline, while kerosene is used for longer curing times. Cutback asphalt usage has declined in recent years due to poll
10、ution and health concerns.,Asphalt Emulsion Today, asphalt emulsions are more commonly used. An emulsion consists of an oil suspended in water. In this case, the asphalt cement is the oil component. A surfactant (also called an emulsifying agent) needs to be added in order to make the oil and water
11、mix. Having the asphalt suspended in water allows the placing temperature for a BST to be significantly lower than for a hot mix asphalt.,A surfactant offers two benefits one, it causes asphalt to form tiny droplets that will suspend in water by lowering the surface tension between the asphalt and t
12、he water. Two, a surfactant determines the electrical charge of the emulsion.,Aggregate will have an electrical charge, usually negative. Since opposite charges will attract, it is important to choose an emulsion with the opposite charge, which will enhance the binding of the asphalt to the aggregat
13、e. Cationic (having a positive charge) emulsions are typically used.,The next largest (by volume) ingredient in an asphalt emulsion is the water. Water forms approximately one-third of the volume of the emulsion. Asphalt particles will, with the help of the emulsifying agent, suspend in the water.,I
14、t is important to note that if the emulsion breaks (when the asphalt and water separate from one another) the emulsion will change from brown to black. The aggregate must be applied and rolled before the emulsion breaks. When the emulsion breaks, the water evaporates, and the asphalt remains on the
15、roadway.,The asphalt cement is the primary ingredient in a BST. This asphalt is much like the asphalt used in hot mix paving. Sometimes, a latex or polymer modified asphalt may be used to improve early chip retention or BST durability.,Aggregate Aggregates typically used include natural gravel or cr
16、ushed stone. These must be clean and dust free, hard, and uniform. This is to provide a durable surface for traffic. It is common to limit the percent of material passing the No. 200 sieve (0.075 mm) to about 1 percent or less since excessive dust can be a serious adhesion issue for BSTs.,Aggregate
17、used in construction of a BST should be placed only one layer thick. The exceptions to this is when adding chokestone or a second BST layer (a two layer BST is often referred to as a “double shot” treatment).,Placing too much aggregate will cause aggregate pickup, whereby the well placed stones are
18、dislodged, and may cause automobile windshield damage. A small amount of excess aggregate, more than 5% but less than 10%, may be placed in turning and stopping zones. This will reduce tire scuffing in the freshly laid BST.,Design Design of BSTs must take into consideration all of the points mention
19、ed in the Asphalt and Aggregate sections of this article. Material must be of good quality and the correct properties.,The design must also take into consideration the amount of binder and cover aggregate to apply. In order to prevent excessive chip loss, about 70 percent of the aggregate (and a min
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 专业 英语 ppt 课件
链接地址:https://www.31ppt.com/p-1446256.html