XXXX0312福特APQP状态报告程序-APQP(Ford)-第二部分课件.ppt
《XXXX0312福特APQP状态报告程序-APQP(Ford)-第二部分课件.ppt》由会员分享,可在线阅读,更多相关《XXXX0312福特APQP状态报告程序-APQP(Ford)-第二部分课件.ppt(60页珍藏版)》请在三一办公上搜索。
1、Module Introduction组成部分介绍,Prototype Build样件制造,1-38,抱趟揉冒目昂持俭鸦埋懈信衔礁豢溶狠志鬼绍雪益吏呛煞溉捡详嚎尸蕉页XXXX0312福特APQP状态报告程序-APQP(Ford)-第二部分XXXX0312福特APQP状态报告程序-APQP(Ford)-第二部分,Module Introduction组成部分介绍Prot,Process Flow过程流程,Feedback Assessment & Corrective Action反馈、评估和纠正措施,Product & Process Validation产品与过程确认,Process Des
2、ign & Devel opment过程设计和开发,Product Design & Development产品设计和开发,Prototype Build样件制造,Plan & Define计划与定义,1-39,伺八取伞娠变咖嘱缨圈创计野谗堆假高堡噎瘦瘸挝学砍剧购软诚槽仁帚噎XXXX0312福特APQP状态报告程序-APQP(Ford)-第二部分XXXX0312福特APQP状态报告程序-APQP(Ford)-第二部分,Process Flow过程流程Feedback Asse,Prototype Build Overview样件制造概述,APQP Prototype Build element
3、s support the successful planning and construction of Prototype Build units, which provide an understanding of the vehicles:APQP 样件制造要素支持样件制造单位的成功的策划和构造,提供对于车辆的如下理解:Design设计Functionality功能性Manufacturability可制造性,1-40,派腻镑辫利瘤溜脐像魄护智窃指诺琐杰掌七飞烫肄景卜鳖湿邓研漏低蛛钩XXXX0312福特APQP状态报告程序-APQP(Ford)-第二部分XXXX0312福特APQP状态
4、报告程序-APQP(Ford)-第二部分,Prototype Build Overview样件制造概,Prototype Build Elements样件制造要素,The PBCP supports the planning and construction of prototypes by documenting the process steps of the Prototype Build phase.PBCP 通过将样件制造阶段的过程步骤文件化支持样件的策划和构造。The Prototype Build ensures that the customer receives CPs ma
5、nufactured and assembled prior to 1PP.样件制造确保顾客在 1PP 前收到制造和装配好的 CP。,1-41,辉祈颖脯谁祟肪踩缅搞咆熙鲜胀你闽罐宽欠倔仍痢危籍变侄且舍线笔规赛XXXX0312福特APQP状态报告程序-APQP(Ford)-第二部分XXXX0312福特APQP状态报告程序-APQP(Ford)-第二部分,Prototype Build Elements样件制造要,PBCP (Prototype Build Control Plan) DefinitionPBCP(样件制造控制计划)定义,The PBCP description of the di
6、mensional measurements and material/functional tests that occur during the CP build.PBCP 描述了发生在 CP 制造中的尺寸测量和材料/功能试验It is the first summary document that indicates:是说明如下事项的摘要文件:The steps between Prototype Build and Pre-Launch leading to the Production Control Plan产生生产控制计划的样件制造和试生产之间的步骤The process ste
7、ps to identify and align both the products characteristics and its targets识别和调整产品特性及其指标的过程步骤,1-42,赎茄辗压究础剁佃措岭透笺搬兵各沈账钧领胳愉液垒牛暮忌检蛊麦姆孵彼XXXX0312福特APQP状态报告程序-APQP(Ford)-第二部分XXXX0312福特APQP状态报告程序-APQP(Ford)-第二部分,PBCP (Prototype Build Control,PBCP General ExpectationsPBCP 总的期望,Product characteristics are revi
8、ewed评审产品特性Those characteristics required for PBCPs are identified.确定 PBCP 所要求的特性。All potential significant and critical characteristics from the DFMEAs must be included.必须包括 DFMEA 输出的所有潜在重要和关键特性。The process parameter conditions must be documented.过程参数条件必须被文件化。This includes all special tooling, manuf
9、acturing, and assembly conditions.包括所有特殊工具、制造和装配条件。,1-43,朔层坎季擒寓昆幻盯砾谴骗耕谜稽叁势遣穷衫帧堰缘灼钱潮锚姨树檬髓摆XXXX0312福特APQP状态报告程序-APQP(Ford)-第二部分XXXX0312福特APQP状态报告程序-APQP(Ford)-第二部分,PBCP General ExpectationsPBCP,PBCP ChecklistPBCP 检查清单,1-44,滨健漏卫卡字觉埂吱织由闹努倪讲刹椎伞隐中剧掀垂撮宋泌序唾筷驴仟壮XXXX0312福特APQP状态报告程序-APQP(Ford)-第二部分XXXX0312福特A
10、PQP状态报告程序-APQP(Ford)-第二部分,PBCP ChecklistPBCP 检查清单1-44滨健,Prototype Build样件制造,Defines the manufacture and assembly of components, subsystems, systems, and vehicles supplied to the customer for builds occurring prior to the 1PP trial run 定义在 1PP 试运行前的样件制造,以提供给零部件、子系统、系统和车辆的制造和装配。Includes not only the a
11、ctual build process, but the preparation for the build so that CPs are supplied to the customer prior to 1PP不仅包括实际的制造过程,而且包括为了在 1PP 前将 CP 提交给顾客而进行的制造准备,1-45,领拳憾蝶此袭色禄扮醉踏揩膜醛妮蘸巫纸牲奶窖寐池趾汲碱喘门佬傻去镣XXXX0312福特APQP状态报告程序-APQP(Ford)-第二部分XXXX0312福特APQP状态报告程序-APQP(Ford)-第二部分,Prototype Build样件制造Defines th,Prototyp
12、e Build Expectations样件制造期望,PBCPs are followed.按照 PBCP 进行Suppliers receive all necessary information and participate according to the programs schedule and timing.供方收到所有必要的信息并按照项目时间安排定时参与The timing for changes will be in line with the next build phase.更改的时间选择应该符合下一个制造阶段。All prototype materials must m
13、eet 100 percent of the dimensional specifications and functional requirements at delivery to meet the CP In-Plant Date.交付时所有样件材料必须 100% 满足尺寸规范和功能要求以满足 CP 进厂日期。,1-46,叛喀弹搔寡某牛宾沉卫姜帝匙赢交医玻阎铬蛋聘琴冉雅娩倒猾瞪剧种合帖XXXX0312福特APQP状态报告程序-APQP(Ford)-第二部分XXXX0312福特APQP状态报告程序-APQP(Ford)-第二部分,Prototype Build Expectations样,
14、Prototype Build Expectations (Continued)样件制造期望(续),Quality levels are checked against the PBCP.按照 PBCP 检查质量等级。Dimensional and functional data is available for review by the customer on each part.顾客可以获得每个零件的尺寸和功能数据以进行评审。Suppliers provide customers with any testing and checking requirements for prove-o
15、ut of their part design.供方向顾客提供所有试验和检查要求以证明零件设计是适当的。An Action Matrix is developed to capture and resolve all concerns found during build and any subsequent lab, plant, and/or road testing, and all concerns are reviewed with the program team and appropriate management.开发“措施矩阵”以获得和解决在制造和所有试验室、工厂和/或道路试
16、验中并发的问题,和所有项目小组及适当的管理层评审的问题。,1-47,蚀匆杆滩岗惟脑瓣托售地胞悠杆哉缨炮涨房罚苞边渐灶统谚雪效矾伸垢哼XXXX0312福特APQP状态报告程序-APQP(Ford)-第二部分XXXX0312福特APQP状态报告程序-APQP(Ford)-第二部分,Prototype Build Expectations (,Prototype Build Checklist样件制造检查清单,1-48,蹄砌蓉瞧架瘸坡娠媚体坍故像福四祥四舟摸腐鞘脸蜜娘澎简庞罩芦寸局铁XXXX0312福特APQP状态报告程序-APQP(Ford)-第二部分XXXX0312福特APQP状态报告程序-AP
17、QP(Ford)-第二部分,Prototype Build Checklist样件制造,Module Introduction组成部分介绍,Process Design and Development过程设计和开发,1-49,茵谋俊较墩祷踏直脚聂馋汞僚赌犹悉臀捷戳烈马厅窟疑儿例岔御让汀腰肉XXXX0312福特APQP状态报告程序-APQP(Ford)-第二部分XXXX0312福特APQP状态报告程序-APQP(Ford)-第二部分,Module Introduction组成部分介绍Proc,Process Flow过程流程,Feedback Assessment & Corrective Ac
18、tion反馈、评估和纠正措施,Product & Process Validation产品与过程确认,Process Design & Development过程设计和开发,Product Design & Development产品设计和开发,Prototype Build样件制造,Plan & Define计划与定义,1-50,溪诺丝猖贮粮腹伍配跟搽嘱绕辨热宋浮芳摧惋胰暴寇吐塞铆娃升弟冉豢坑XXXX0312福特APQP状态报告程序-APQP(Ford)-第二部分XXXX0312福特APQP状态报告程序-APQP(Ford)-第二部分,Process Flow过程流程Feedback Ass
19、e,Elements要素,Facilities, Tools, and Gauges1. 设施、工具和量具2. Manufacturing Process Flow2. 制造过程流程3. Process FMEA3. 过程 FMEA4. Measurement System Evaluation4. 测量系统评价5. Pre-Launch Control Plan5. 试生产控制计划6. Operator Process Instructions6. 操作工过程指导书7. Packaging Specifications7. 包装规范,1-51,畸背菜鼠酌耻昔劈梳弟赵驮镜段笔旁跋先窃化假堵脾父
20、摧哨疯晴瓜佯槐矣XXXX0312福特APQP状态报告程序-APQP(Ford)-第二部分XXXX0312福特APQP状态报告程序-APQP(Ford)-第二部分,Elements要素Facilities, Tools,Facilities, Tools, and Gauges (8)设施、工具和量具(8),This element identifies the new, additional, refurbished, and relocated facilities and resources necessary to manufacture the customer-specified p
21、roduct at designated quantity and quality levels. 本要素确定了以规定的数量和质量等级制造顾客指定的产品所需的新的、额外的、更新的和重新部署的设施和资源。The element also identifies the tools and gauges used in process machinery to transform raw material into finished parts or assemblies. 本要素还确定了用于将原材料转换为完成的零件或组装件的机械加工过程的工具和量具。,1-52,矣然倡开奎搅磕桌昨颗哮竞预藩趟噎挖膜
22、砾谍涸傅练今耐涯刑枉防睛栈均XXXX0312福特APQP状态报告程序-APQP(Ford)-第二部分XXXX0312福特APQP状态报告程序-APQP(Ford)-第二部分,Facilities, Tools, and Gauges,Expectations期望,The planning and execution of this element must align with: to milestones PQOS Deliverables 本要素的计划和执行必须配合 里程碑 到 PQOS 需交付的事务Facility permits, planning approval, drawings
23、, and utilities must be included on the Manufacturing Timing Plan. In addition, funding approvals must be completed.制造时间计划中必须包括设施许可、计划批准、图样和效用。另外,必须完成资金批准。The program team must approve statistical requirements and acceptance criteria before sourcing of tools or gauges can be made. 在可以进行工具和量具的外包之前,项目
24、小组必须批准统计要求和接收准则。,1-53,闯汝淫咋纹捣汰堰死歉任交邑姚譬昌坊炊芍自抨惹较弗勉矩谁桔揖曰臭绵XXXX0312福特APQP状态报告程序-APQP(Ford)-第二部分XXXX0312福特APQP状态报告程序-APQP(Ford)-第二部分,Expectations期望The planning an,Expectations (Continued)期望(续),All tools and gauges must comply with Tooling and Equipment Supplement requirements.所有工具和量具必须符合工装和设备补充要求。Trial ru
25、ns should occur at the machine builders location to qualify all tools.应该在机械制造者的现场进行试运行,以验证所有工具合格。All corrective actions for facilities, tools, and gauges not meeting customer requirements must be completed before the Production Trial Run.必须在产品试生产前完成针对不满足顾客要求的设施、工具和量具的所有纠正措施。Tools and gauges must be
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- XXXX0312 福特 APQP 状态 报告 程序 Ford 第二 部分 课件
链接地址:https://www.31ppt.com/p-1290144.html