14 楼冬期施工方案.doc
recovery and treatment in a timely manner. At the time of construction, should be taken to prevent dust and mud spill leak, measures such as the sewage outflow, vehicles stained with dirt, construction waste someone to clean up, to avoid polluting the environment 3.2 night arrangements of noise emitted by construction equipment, mixer noise emitted by machinery and equipment next to foam for noise control to prevent noise pollution of the surrounding environment. 3.3 construction managers and construction personnel, special operations personnel listing jobs, site operators, leaders, managers, operators, wearing a helmet is divided into red, blue and yellow species. 3.4 site construction and company's comprehensive evaluation, check scores published examination results issued on a regular basis. 4, construction site environmental protection measures in order to protect and improve the living environment and the ecological environment, prevent construction and operation of pollution and nuisance, safeguard the health of residents and workers near the construction area, promoting the development of Socialist construction, environmental protection must be the construction site. 4.1 daily by the Deputy Project Manager, construction, safety officer for the afternoon the second comprehensive self test, where a violation of the provisions of the environment protection in construction site must be promptly identified and corrective action, made by construction workers on the day of the construction of the log on post records. 4.2 monthly by the Department of projects to be checked, according to the environmental protection in construction site inspection, evaluation criteria for inspection score, fill in the score sheet as the basis for site evaluation of safe production and civilized. During the inspection, do not meet the environmental requirements of the "three" (people, time, and measures) modification, implementation and review review the duties specified. 4.3 4.3.1 pollution prevention measures in construction site clean up rubbish, used motor vehicle shipments, no free air dispersion caused by dust. Construction of refuse to be cleaned up to a designated location, no feel free to pile up, cleaned up and when adequate water to reduce dust. 4.3.2 earthmoving construction site entrances and set the car wash, and arrange for someone to clean up tire, not wheel dirt into other roads, affecting the city clean. 4.3.3 construction road construction site before construction ready plans and setting, make full use of red line layout, arrangement of temporary construction road, grass-roots energising, pavement paving the way Coke button, fine aggregate, and water at all times, reduce road dust. 4.3.4 construction when the protection of urban public facilities have been built, reasonable arrangements within the lot of construction organization, construction on the normal life of the residents and to minimize the impact of leisure. 4.3.5 easy cloud of fine materialWe will continue to improve the company's internal control system, and steady improvement in ability to manage and control, optimize business processes, to ensure smooth processes, responsibilities in place; to further strengthen internal controls, play a control post independent oversight role of evaluation complying with third-party responsibility; to actively make use of internal audit tools detect potential management, streamline, standardize related transactions, strengthening operations in accordance with law. Deepening the information management to ensure full communication "zero resistance". To constantly perfect ERP, and BFS+, and PI, and MIS, and SCM, information system based construction, full integration information system, achieved information resources shared; to expand Portal system application of breadth and depth, play information system on enterprise of Assistant role; to perfect daily run maintenance operation of records, promote problem reasons analysis and system handover; to strengthening BFS+, and ERP, and SCM, technology application of training, improve employees application information system of capacity and level. Humanistic care to ensure "zero." To strengthening Humanities care, continues to foster company wind clear, and gas are, and heart Shun of culture atmosphere; strengthening love helped trapped, care difficult employees; carried out style activities, rich employees life; strengthening health and labour protection, organization career health medical, control career against; continues to implementation psychological warning prevention system, training employees health of character, and stable of mood and enterprising of attitude, created friendly fraternity of Humanities environment. To strengthen risk management, ensure that the business of "zero risk". To strengthened business plans management, will business business plans cover to all level, ensure the business can control in control; to close concern financial, and coal electric linkage, and energy-saving scheduling, national policy trends, strengthening track, active should; to implementation State-owned assets method, further specification business financial management; to perfect risk tube control system, achieved risk recognition, and measure, and assessment, and report, and control feedback of closed ring management, improve risk prevention capacity. To further standardize trading, and strive to achieve "according to law, standardize and fair." Innovation of performance management, to ensure that potential employees "zero fly". To strengthen performance management, process control, enhance employee evaluation and levels of effective communication to improve performance management. To further quantify and refine employee standards . Work, full play party, and branch, and members in "five type Enterprise" construction in the of core role, and fighting fortress role and pioneer model role; to continues to strengthening "four good" leadership construction, full play levels cadres in enterprise development in the目录1 编制依据22 工程概况22.1 设计概况22.2 现场情况53 施工安排53.1 冬期施工期的规定53.2 冬期施工目标和原则53.3 冬期施工部位及工期63.4 冬期施工劳动力组织和职责分工73.6 冬期施工主要项目工程量94 施工准备与资源配置计划94.1 技术准备94.2 现场准备104.3 物资准备105 施工方法及工艺要求115.1 测量工程115.2 钢筋工程115.3 模板工程125.4 混凝土工程135.5 地下外墙防水工程195.6 地下肥槽土方回填土工程205.7 安装工程预留预埋216 质量保证措施216.1 冬施教育和培训216.2 质量管理措施217 安全消防措施227.1 安全、消防教育227.2 制定具体措施23冬期施工方案1 编制依据编制依据见表1-1。表1-1序号名称编号1建筑施工图建施-2结构施工图结施-2地基与基础工程施工质量验收规范GB5020220023混凝土结构工程质量验收规范GB5020420024建筑工程施工质量验收统一标准GB5030020015建筑工程冬期施工规程JGJ104-20116建筑机械使用安全技术规程JGJ3320017建筑施工手册(第四版)8施工组织设计2 工程概况2.1 设计概况设计概况见表2-1。表2-1序号项 目内 容1工程名称盛和.日月华庭1号楼、2号楼、3号楼、4号楼、地下车库及服务用房2地理位置河北省张家口市沈家屯村东南部,清水河西路以西、张家口市第一中学新校区南侧,朝阳西大街南侧、西苑南路东侧3建筑功能本工程为一类高层住宅和住宅地下车库及配套服务用房。4建筑面积90307.67m2(其中地下19491.79m2,地上70815.88m2)1号楼:19998.07m2(其中地下2423.45m2,地上17574.62m2)2号楼:19915.74m2(其中地下2421.49m2,地上17494.25m2)3号楼:19616.31m2(其中地下2336.88m2,地上17279.43m2)4号楼:20320.79m2(其中地下2437.62m2,地上17883.17m2)地下车库及服务用房:10456.76m2(其中地下9872.35m2,地上584.41m2)5建筑物占地面积5352.87m21号楼:1193.57m22号楼:1202.05m23号楼:1175.10m24号楼:1191.56m2地下车库及服务用房:584.41m26建筑平面1号楼、2号楼地下二层、地下一层、首层、二层:横轴编号144,纵轴编号AQ,横轴距离76.770m,纵轴距离18.900m三层以上:横轴编号144,纵轴编号AP,横轴距离76.770m,纵轴距离16.800m3号楼 横轴编号155,纵轴编号AN,横轴距离74.070m,纵轴距离16.800m4号楼横轴编号156,纵轴编号AM,横轴距离76.170m,纵轴距离16.800m地下车库及服务用房地下一层:横轴编号126,纵轴编号AL,横轴距离198.300m,纵轴距离56.400m地上一层:横轴编号f-8f-1,纵轴编号f-Ef-B,横轴距离41.750m,纵轴距离10.800m7建筑物层数1号楼、2号楼、3号楼、4号楼:地下二层、地上十九层地下车库及服务用房:地下一层为车库,地上一层为服务用房8建筑层高1号楼、2号楼:地下二层(库房、戊类库房)3.00m,地下一层(自行车库、接室、配电室、弱电机房、设备用房、合用前室)3.5m、3.95m,一层门厅和合用前室3m、商铺3.3m,二层前室2.8m、商铺2.95m、三层以上住宅2.80m。3号楼、4号楼:地下二层(库房、戊类库房)3.00m,地下一层(自行车库、接室、配电室、弱电机房、设备用房、合用前室)3.5m、3.95m,一层门厅和合用前室3m、商铺3.3m,二层以上住宅2.80m。地下车库及服务用房:地下一层3.80m、4.90m、6.00m,一层3.80m 9建筑物标高、高度1号楼:±0.00=709.50m,檐高54.55m 2号楼:±0.00=709.85m,檐高54.55m3号楼:±0.00=708.30m,檐高54.55m4号楼:±0.00=708.50m,檐高54.55m地下车库及服务用房:±0.00=708.60m,檐高3.80m10结构选型地基基础:1号楼、2号楼、3号楼、4号楼为现浇钢筋混凝土筏形基础,地下车库及服务用房为柱下独立基础+筏板基础抗侧力体系:1号楼、2号楼、3号楼、4号楼为现浇钢筋混凝土剪力墙结构,地下车库及服务用房为现浇钢筋混凝土框架结构楼盖结构:现浇钢筋混凝土普通梁板11楼梯坡道结构形式板式钢筋混凝土12后浇带设置1号楼、2号楼、3号楼、4号楼:各一条,从基础底板至首层楼板,宽800mm地下车库及服务用房:四条,从基础底板至顶板面,宽800mm13变形缝设置1号楼、2号楼、3号楼、4号楼:各一条,宽175 14钢筋类别HPB235()级钢HRB335()级钢HRB400()级钢15混凝土强度等级1号楼、2号楼、3号楼、4号楼基础垫层:C15基础底板:C30八层及以下墙、柱、梁、板:C30九层及以下墙、柱、梁、板:C25楼梯:C25圈梁、构造柱、现浇过梁:C20标准构件:按标准图要求后浇带:采用比相应部位构件混凝土强度等级高一级的膨胀混凝土地下车库及服务用房基础垫层:C15基础底板、防水板、地下室外墙:C35 框架柱:C40梁、板、楼梯:C35构造柱、圈梁、过梁:C20后浇带:采用比相应部位构件混凝土强度等级高一级的膨胀混凝土16地下防水1号、2号、3号、4号楼:防水等级为二级地下车库及服务用房:种植顶板的防水等级为一级;其余地下工程防水等级为二级外墙、底板防水材料及做法(外防):侧墙、底板和室外部分的顶板,除结构采用不小于250mm厚自防水混凝土(抗渗等级P6)外,并在底板下侧,侧墙和顶板外侧加做1.5厚P型单面自粘防水卷材,具体做法参照“贴必定”自粘防水卷材(10BJZ50),并应符合地下工程防水技术规范(GB 50108-2008)2.2 现场情况2012年11月1日之前,1号楼、2号楼、4号楼二层墙体以下混凝土结构施工完,3号楼一层楼板以下混凝土结构施工完,地下车库混凝土结构施工完,1号楼和4号楼地下外墙防水施工完。3 施工安排3.1 冬期施工期的规定根据建筑工程冬期施工规程(JGJ104-2011),冬期施工期限划分原则是:根据当地多年气象资料统计,当室外日平均气温连续5天稳定低于5即进入冬期施工;当室外日平均气温连续5天高于5时解除冬期施工。根据气象资料,张家口市通常是每年11月1日至翌年3月31日为冬期施工期。但10月25日至31日为初寒期,4月1日至10日为回暖期,在此期间,要密切注意天气变化,及时掌握气象预报,以防气温突然下降,给工程造成损失。施工现场在10月25日起开始对大气进行测温工作。3.2 冬期施工目标和原则3.2.1 确保工程质量,做到安全生产。3.2.2 冬期施工的措施方案要因时因地因工程项目制宜,既要技术上可靠,同时要经济合理,尽量减少能源消耗和物资损耗,缩短工期,使所增加的费用最少。3.2.3 冬期施工应考虑所需的设备、热能及材料要有充足、可靠的来源,暂设工程能够满足施工生产要求。3.2.4 所选择的施工方法简单可靠,施工速度快,达到保证质量、安全生产、缩短工期、降低成本的目的。3.2.5 必须制定行之有效的冬期施工管理措施。3.2.6 本工程的冬期施工要以保证质量、保安全为主,完成施工进度为辅。3.3 冬期施工部位及工期根据本工程施工组织设计中工期要求和现场实际施工进度情况,结合张家口市气候条件,在2012年内混凝土结构施工至11月30日、地下外墙防水施工至11月24日、地下肥槽回填土施工至12月15日,2013年从4月1日开始施工,在初冬期间要涉及到混凝土结构工程、地下外墙防水、土方回填工程等施工,冬期期间施工部位及工期安排见表3-1。表3-1序号施工部位始止时间持续天数11号楼混凝土结构1.1四层墙体及梁顶板2012.11.12012.11.15151.2五层墙体及梁顶板2012.11.162012.11.30151.3基础底板至一层楼板温度伸缩后浇带2012.11.192012.11.25722号楼混凝土结构2.1四层墙体及梁顶板2012.11.12012.11.15152.2五层墙体及梁顶板2012.11.162012.11.30152.3基础底板至一层楼板温度伸缩后浇带2012.11.192012.11.25734号楼混凝土结构3.1四层墙体及梁顶板2012.11.12012.11.15153.2五层墙体及梁顶板2012.11.162012.11.30153.3基础底板至一层楼板温度伸缩后浇带2012.11.192012.11.25743号楼混凝土结构4.1一层墙体及梁顶板2012.11.12012.11.10104.2二层墙体及梁顶板2012.11.112012.11.20104.3三层墙体及梁顶板2012.11.212012.11.30104.4基础底板至一层楼板温度伸缩后浇带2012.11.242012.11.3075服务用房楼板混凝土结构2012.11.12012.11.20206地下车库与1-4号楼之间通廊混凝土结构2012.11.12012.11.25257地下车库温度伸缩后浇带2012.11.122011.11.211082号楼地下外墙防水卷材2012.11.62011.11.1279地下车库外墙防水卷材2012.11.132011.11.2210103号楼地下外墙防水卷材2012.11.232011.11.29711地下车库与1-4号楼之间通廊防水卷材2012.11.302011.12.5612地下外墙肥槽回填土2012.11.152012.12.153113安装工程预留预埋2012.11.12012.11.30303.4 冬期施工劳动力组织和职责分工3.4.1 管理层负责人及职责分工成立以项目经理为组长的冬期领导小组,负责人及职责分工见表3-2。表3-2序号职务姓名主要职责1项目经理-组长赵学来全面负责工地冬期施工的领导工作2项目总工-副组长陈建新全面负责和指导冬施技术、质量工作3生产经理-副组长康锦平负责组织实施和协调工作4技术员-组员饶际鹏方案的实施检查、技术协调5安全员-组员阳太平负责冬施期间的消防、安全监督6质量检查员 -组员王争权负责冬施期间的质量控制7土建施工员-组员唐永斌负责冬施中的工程进度、质量、保温工作8水电施工员-组员闫伦军负责冬施中的水电配合及水管的保温9实验员-组员黄剑琦负责试验、计量及冬施的测温管理和气象预报工作10测量员-组员曹锋负责冬施过程中测量工作11材料员-组员黄祖武负责冬施中工程物资供应工作12资料员-组员宋丹负责冬施资料收集整理工作3.4.2 工人数量及分工根据施工进度计划及施工流水段划分,进行劳动力安排见表3-3。表3-3序号工种名称班组名称人数任务1防水工防水班组8设组长1人,负责外墙防水卷材施工2回填土工土方回填组20设组长1人,负责肥槽土方回填施工3钢筋工钢筋成型班组24设组长1名,负责钢筋加工钢筋安装班组50设组长1名,负责墙、柱、梁板钢筋连接绑扎4木工楼板支模班组46设组长1名,负责楼板、梁、阳台和楼梯等水平构件模板施工。 钢大模班组46设组长1名,具体负责墙、柱等竖向构件的模板施工。5混凝土工混凝土浇筑班组25设组长一名,负责混凝土的布料浇筑、振捣、搓平,泵管的移动就位固定。6架子工脚手架20设组长一名,负责负责脚手架搭设及拆除及安全防护。7放线工防线班组6设组长一名,楼层水平线、墙体位置线8保温工混凝土保温班组6设班长一名,负责混凝土保温9测温工混凝土测温班组6设组长1名,负责混凝土的测温10安装电工电工班组24设组长1名,负责电气配管和洞口预留11水暖工水暖工班组6设组长1名,负责给排水、暖通洞口预留和套管预埋12抹灰工4地下外墙面修补13电气焊工6钢筋和钢管焊接14临电电工2临电维护15塔司6垂直运输16信号工8垂直运输合计3133.6 冬期施工主要项目工程量冬期施工主要项目工程量见表3-4。表3-4序号项 目单 位数 量备注1钢筋工程地上墙体t330地上梁板t2262模板工程地上墙体m219200地上梁板m239003混凝土工程地上墙体、柱m31980地上梁板m313504防水工程地下外墙m295005土方回填工程肥槽m3400004 施工准备与资源配置计划4.1 技术准备4.1.1 冬期施工技术培训冬期施工前,对全体人员进行冬期施工培训,组织参与冬施的施工管理人员学习有关冬期施工规范、规定及冬期施工技术;学习、理解公司冬期施工的总方案及本工程的冬施方案,具体掌握各分项工程冬期施工的方法、有关要求及具体措施。特别要对试验人员和测温人员进行冬施试验和测温方法培训,明确试验、测温意义和测温数据的重要性,提高试验人员和测温人员的责任心。对工人进行冬施培训,并进行技术交底。4.1.2 编制冬施材料计划和技术交底在冬期来临之前,技术部根据施工进度计划、结合实际情况和工程特点编制冬施材料计划和技术交底。 4.1.3 对预拌混凝土供应商技术交底在冬施来临之前,项目技术部根据预拌混凝土技术合同要求及现场施工部位、施工环境等因素对预拌混凝土供应商进行冬期施工混凝土供应技术交底。交底中应明确混凝土的使用部位、数量、混凝土的强度等级、坍落度要求、原材料的要求、混凝土水灰比的要求、外加剂的要求、混凝土出罐温度的要求、混凝土凝结时间要求等,并要求混凝土搅拌站提供混凝土冬期施工方案(主要有原材料的温度的控制及拌制运输到现场的热工计算等有关资料)。4.2.4 对管理层和作业层技术交底技术部按冬施方案要求和有关规定,对总包有关职能人员进行施工方案交底,对分包负责人及作业班组进行书面和口头形式的冬施各分项工程的技术交底和安全交底。4.2 现场准备4.2.1 施工场地的准备(1)排除施工现场积水、对施工现场进行必要的修整,截断流入施工现场的水源,做好排水措施,消除现场施工用水造成场地结冰现象。(2)施工场地积雪清扫后,不应放在机电设备、构件堆放场地附近。(3)保证消防道路的畅通。 4.2.2 机械设备、附属设施的准备(1)机械设备要做好冬季施工所需油料的储备和工程机械润滑油的更换补充以及其它检修保养工作,以便在冬施期间运转正常。(2)工地临时供水管埋地1.4m保温,露出地面临水管采用管状岩棉保温、表面缠绕塑料布,外露的阀门要用砖砌井、内填锯沫保温,水龙头、阀门有损坏的一律更换完毕。(3)消防泵房采用电暖器供暖,并有专人值班。(4)办公区采用空调供暖、生活区采用电暖器供暖,门口安装棉门帘。(5)建立室外监测点,现场设置测温百叶箱(规格300×300×400mm,箱底距地1.5m,外表面刷白色油漆),并于10月25日起测量记录大气温度。4.3 物资准备冬期施工所需物资必须于冬施前到位,主要物资准备计划见表4-1。表4-1序号材料名称品种规格单位数量用途1砂浆防冻剂-15t1地下混凝土外墙表面修补2塑料薄膜宽1mm29600混凝土表面养护及保温覆盖3阻燃聚氨酯保温板厚15×宽1m、长2mm24300钢大模板外表面保温4阻燃保温被厚15m22400混凝土保温覆盖5彩条布宽6mm22000外墙门窗洞口及外架围挡6管状岩棉内径100mm、壁厚50mmm570外露消防管保温内径40mm、壁厚50mmm240生活及生产用水管保温7棉门帘宽1m、长2m个65办公室及宿舍门口8空调机1.5P台12办公室取暖9电暖器1200W台53宿舍、消防泵房取暖10暖风机1000W台2作业面清除冰雪11空压机1.5m3台2作业面清除冰雪12木制百页箱300×300×400mm个1大气温度及室内测温13干湿温度计个2大气温度及环境测温14电子测温仪个1混凝土测温15棒形温度计-20、酒精支20混凝土测温16测温管10根50混凝土测温17防寒服套350工人防寒18防滑棉鞋双350工人防寒19布手套双350工人防寒5 施工方法及工艺要求5.1 测量工程5.1.1 施工时测量仪器应轻拿轻放。5.1.2 尽量避免在风雪天气进行户外测量放线工作,如需要时对仪器采用打伞遮挡的保护措施。5.1.3 在测量弹线时往墨斗中加入酒精以防止墨汁上冻。5.2 钢筋工程5.2.1 一般要求(1)雪天钢筋要用塑料布遮盖严密,以防钢筋表面结冰霜。(2)钢筋加工要按规范操作,在运输、加工过程中要轻拿轻放,以避免造成刻痕,撞击凹陷。(3)钢筋接头及浇筑混凝土前将钢筋上的冰雪冻块及时清理干净,不得用水冲洗。(4)对浇筑完混凝土面的预留钢筋上的混凝土及时清理干净。(5)钢筋调直采用调直机。(6)直径16的钢筋连接采用直螺纹连接,直径14的钢筋连接采用搭接。直螺纹连接接头加工后及时戴帽保护。(7)定位钢筋、马凳钢筋采用电弧焊5.2.2 钢筋负温焊接方法及技术要点(1)在负温条件下焊接钢筋,应尽量安排在室内进行。如必须在室外焊接,其环境温度不宜低于-20,风力超过3级时要有挡风措施。焊后未冷却的接头,严禁碰到冰雪。(2)焊条易潮,特别在负温度时,使用前必须按照质量说明书的规定进行烘焙。使用时取出放在保温筒内,做到随用随取,外露2小时后必须要重新烘焙。所使用的焊条要贮存在通风干燥的地方,保证焊条的良好性能。5.3 模板工程5.3.1 模板类型一层以上墙采用钢大模板,柱、梁、板采用15厚腹膜木模板。5.3.2 模板的保温措施 (1)柱木模板侧外围满裹挂两层阻燃保温被。(2)墙钢大模板背楞之间粘贴两层15mm厚聚氨酯保温板。(3)模板表面应清理干净后涂擦脱模剂,混凝土浇筑前表面不得有冰雪。5.3.3 模板的拆除要求(1)混凝土受