欢迎来到三一办公! | 帮助中心 三一办公31ppt.com(应用文档模板下载平台)
三一办公
全部分类
  • 办公文档>
  • PPT模板>
  • 建筑/施工/环境>
  • 毕业设计>
  • 工程图纸>
  • 教育教学>
  • 素材源码>
  • 生活休闲>
  • 临时分类>
  • ImageVerifierCode 换一换
    首页 三一办公 > 资源分类 > DOC文档下载  

    cz唐山港京唐港区36号至40号煤炭泊位堆场、道路、管网及设备基础工程施工组织设计1.doc

    • 资源ID:4873406       资源大小:1,007.01KB        全文页数:102页
    • 资源格式: DOC        下载积分:10金币
    快捷下载 游客一键下载
    会员登录下载
    三方登录下载: 微信开放平台登录 QQ登录  
    下载资源需要10金币
    邮箱/手机:
    温馨提示:
    用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)
    支付方式: 支付宝    微信支付   
    验证码:   换一换

    加入VIP免费专享
     
    账号:
    密码:
    验证码:   换一换
      忘记密码?
        
    友情提示
    2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
    3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
    4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。
    5、试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。

    cz唐山港京唐港区36号至40号煤炭泊位堆场、道路、管网及设备基础工程施工组织设计1.doc

    evaluation of scientific development. Nature security type-nature security is to maintenance people of health value for target, through strengthening security based management, and risk management, and equipment management and technology supervision, ensure production in the people, and real, and system, and system, elements security reliable, and harmony unified, full control various against factors, achieved thought no slack, and management no empty document, and equipment no hidden, and system no blocked, and unit zero non-stopped. Quality and efficiency-quality benefit is to adhere to the enterprise "survival, profit and development" business truth, adhere to the "all activity is economic activity, all costs can be controlled, money should not be wasted" management philosophy, management analysis, to improve management quality, improve cost control capacity and market competitiveness. Innovation of science and technology-science and technology innovation is to play the role of science and technology as the primary productive force, active use of new technologies, new materials, new processes, new equipment, increase investment in science and technology, strengthening scientific and technological training, speeding up transforming scientific and technological achievements, forming a number of proprietary technology, enhancing core competitiveness. Resource-saving-the-resources saving enterprise was to reduce coal consumption, water consumption, electricity at the core, enhance the operation of lean management to realize low consumption, high efficiency, reduce production costs. Second is to strengthen the business, financial, material, information and the optimization of organization and management, saving the internal transaction costs. Harmonious development of harmonious development-is to construct a "foreign" environment for development. "XING" refers to the "internal security firm and internal management of the internal management measures are effective, harmonious". "Foreign currency" means "Enterprise coordinating development of homeopathy, well, get along with the neighbors better." (B) XX 2013 five enterprises building intrinsic safety power company goals are: unplanned outage 0 times. Class of disorders 0, 0 is equivalent forced outage rate. No personal injury accident, material and equipment accidents do not occur, no fire, no environmental pollution accident. Enterprise integrated to achieve zero cases of violation, zero accidents, zero. Quality goal is: when generating capacity 7.5 billion-kilowatt, sales of over 7.11 billion kWh, total profits of 306.6 million Yuan, . BFS+、PI、MIS、SCM Information systems infrastructure, fully integrated information system to realize information resources sharing; to expand the breadth and depth of the portal system, information system of Enterprise Management Assistant role to play; to improve the day-to-day operation and maintenance operation record of promoting causes and transfer system; to strengthen the training唐山港京唐港区36号至40号煤炭泊位堆场、道路、管网及设备基础工程 施 工 组织设计审 批:_审 核:_编 制:_北京易成市政工程有限责任公司二O一三年七月目 录第一章 工程概况 -1一、 工程主要施工内容 -1二、 本工程范围描述 -1三、 编制说明 -1四、 编制依据 -1第二章 施工准备计划-3一、质量目标 -3二、工期目标 -3三、安全目标 -3四、环保目标 -3第三章 工程特点、重点、施工难点及对策-4一、自然条件-4二、工程特点分散、工期紧、施工现场条件复杂-5三、管道施工难点及主要对策-5第四章 施工方案和主要分项工程的施工方法-7一、 防波堤工程施工工艺-7二、 管道施工工艺及工程技术总体要求-三、电力、通信管道施工工艺-17四、电缆沟、排水沟施工工艺-22五、设备基础施工方案 -28六、堆场及道路工程施工技术方案-37第五章 项目管理组织机构-42一、 项目组织机构-42二、 项目机构职责划分-43第六章 工期保障措施及劳动力、材料、机械计划-46一、 工期保证措施-46二、 进度控制办法-46三、 劳动力计划-48四、 材料供应保证措施-49五、 拟投入的主要施工机械设备表-50第七章 安全施工的方案及保证措施-51一、 安全保证体系及措施-51二、 安全目标-53三、 安全生产的管理措施-53四、 机械、电气设备使用-54五、 沟槽土方施工安全保证措施-55六、 桩基施工安全保证措施-56七、 公用管线保护措施-57第八章 文明施工的方案及保证措施-58一、 成立文明施工管理机构-58二、 施工围蔽-58三、 机具、材料管理-58四、 交通组织措施-59第九章 环境保护措施-61一、 学习环保知识、法律法规,开展环保知识宣传,提高全体员工的环保素质-61二、 不使用对环境有害或不符合环保原则的材料。在本工程中不使用红砖,只能使用砂砖或其它替代品-61三、 防止噪音污染和光污染-61四、 防止水质污染-61五、 防止粉尘、废气污染-61第十章 质量目标及保证措施-63一、 质量控制指导思想及原则-63二、 质量保证措施-64第十一章 冬、雨季施工措施-74一、 管道工程雨季施工-74二、 管道工程冬季施工-75三、 道路、设备基础雨季施工措施-76四、 道路、设备基础冬季施工措施-76第十二章 施工措施-79一、 与总包及其他相关单位的协调配合措施-79二、 成品半成品保护措施-82supervision in large and medium goods vehicle. A is established large vehicles and small vehicles classification management of motor vehicle test mode, increased medium van car, and dangerous goods transport car, and school car test project; II is established motor vehicle test regulatory platform, achieved motor vehicle test full process video, and data remote regulatory; three is strictly motor vehicle identification management, equipped with unified of identification equipment and tool, using mobile identification Terminal, and law enforcement records instrument, technology identification means. As to 20XX years June 20 statewide motor vehicle keep volume for 567,408 car, and last year earlier than growth 75,814 car, growth 13.36%; this year January-June, vehicles management section and license archives management section total accepted the motor vehicle registration business 42,543 car times, which registered registration 6,905 car times, and transfer registration 3,592 car times, and change registration 1033 car times, and mortgage registration 696 car times, and cancellation registration 187 car times, and into business 980 car times, and Archives corrections 81 pieces times, and issued test qualified logo 25,429 car times, and other vehicles business 3,640 car times; supervision Survey Section relies on "motor vehicle detection remote issued test qualified logo software platform" supervision motor vehicle test, and identification situation 7418l liangci, investigation motor vehicle exception business 30 car times, his pards business warning 244 article, vehicles and driving people sound video regulatory screenshots 1852 Zhang, checks motor vehicle archives 716 pieces times, and medium bus, and medium above truck, and Of hazardous chemicals, vehicles and school buses and other key vehicle inspection record of 420. (C) based on their own, and strict adherence to defense, more cheating, false false fugitive suspects, robbery suspect vehicles and the Internet crackdown. DMV full play to the "first line of Defense" position control, investigating cheating, fake identification and robbery suspect vehicles through operational work, and carefully examine the documents and legal proof, check traffic violations, traffic accidents, the fugitive suspect suspected vehicles and theft than to work, further tight car, driving management business formalities review procedures. . Truck driver information management platform. Motor vehicles and traffic police departments, State transport authority to further clarify the Division of labour, implementation responsibility, strengthen our collaboration and management together, reinforcing the management of drivers on which strongly synthetic warfare and information warfare. 3 strictly implemented. From May 1 up, a is implemented complex road and bad weather driving exam, currently DMV is urged contractors party in treasures driving school increased simulation Highway, and continuous urgent detours, and snow days, and wet sliding road, and burst situation disposal, subjects II field to driving exam project, is expected3第一章 工程概况唐山港京唐港区36号至40号煤炭泊位工程,位于唐山港京唐港区四港池北侧岸线的西端,自二排干预留的15m岸壁起自西向东连续建设2个15万吨级煤炭卸船泊位(水工结构按靠泊20万吨级散货船建设)和3个10万吨级煤炭装船泊位以及后方配套建设的翻车机房、铁路、堆场及辅建区,新建码头长度共计1712m,设计年通过能力为5600万吨。突堤内侧码头为重力式方块结构,前沿底标高-2.0m,码头顶高程+2.5m,东北端头处设翼墙与斜坡护面衔接。码头基础采用抛石基床,一层砼方块出水,施工水位+1m,上部采用砼胸墙。沿码头方向间距40-50m设置一处阶梯以方便人员上下及渔货装卸,间距15m设5T系船柱一个,并间隔设置系船环。间距5m采用一组废旧轮胎作为简易护舷。外侧为斜坡式防波堤,堤身采用抛石结构,堤顶设置浆砌块石档浪墙,墙顶标高+4.5m,墙外采用2T扭王字块护面,坡底采用60-100kg块石护底。整个防波堤兼码头结构总长度1712m采用混凝土面层。引堤部分采用抛石堤身,堤顶外侧设置浆砌块石档浪墙,墙前采用大块石护面,采用混凝土面层。北侧防波堤顶标高+2.5m,采用抛石堤心,人工块体护面结构。一、工程主要施工内容:唐山港京唐港区36号至40号煤炭泊位堆场、道路、管网及设备基础工程施工。其中泊位堆场引堤工程是本次施工内容中的重点,主要包括以下:1、堤身:堤心石抛理,垫层石抛理。2、护面:100-150kg块石抛理,600-1000kg大块石安放,干砌条石。3、上部结构:浆砌挡浪墙,二片石垫层,砼面层。4、码头兼防波堤工程1)、基础:基槽开挖,基床抛石,基床夯实,基床整平。2)、墙身结构:方块预制,方块安装,伸缩、沉降缝。3)、堤身:堤心石抛理,护坦抛石。4)、护面:2吨扭王字块预制、安装,100150kg块石垫层。5)、上部结构:浆砌挡浪墙,现浇胸墙,沉降缝。6)、面层:垫层与基层,面层。7)、附属设施:踏步,灯柱,系船柱制作与安装,系船环等。5、防波堤工程1)、堤身:堤心石抛理,垫层石抛理,护坦抛石。2)、护面:扭王字块预制,扭王字块安装。二、本工程范围描述:主要包括: 1、所有皮带机系统、转接机房、电缆桥架等支撑结构的基础施工; 2、轨道梁基础及堆场铺面结构的施工。 3、水、电、通信等管线及排水沟、电缆沟等外网的施工等。三、 编制说明 我们主要从以下几个重点问题来论述: 1、施工准备计划:施工总体目标、施工过程总体安排(施工顺序、施工区的划分等); 2、施工方案和主要分项工程的施工方法:设备基础混凝土,道路施工,施工测量、管道沟槽开挖、各种管道的安装、管道试压与检验、沟槽回填、管道冲洗与消毒; 3、施工进度安排与控制计划:施工段的施工进度安排及各施工区主要工序进度控制; 4、工程质量保证措施; 5、施工工期保证措施; 6、安全施工保证措施; 7、文明施工、环境保护保证措施;四、 编制依据 1、国家的、部颁的、地方的施工技术(验收)规范、规程和标准,及其它有关施工规范和行业标准,见表1.1。 2、根据工程特点、施工现场实际情况、施工环境、施工条件和自然条件的分析。3、工地现场考察所得资料。 4、本公司现有的劳动力、技术、机械设备能力和施工管理经验。 5、本公司质量管理体系作业指导书。 6、本公司创优质样板工程的质量手段与技术经验。7、本工程的施工总体目标。表1.1 本工程执行(但不限于以下)现行国家标准、规范一览表序号标准、规范编号名 称1GB50013-2006室外给水设计规范2GB50014-2006室外排水设计规范3GB50015-2003建筑给水排水设计规范4JTJ211-99海港总平面设计规范5JTS149-1-2007港口工程环境保护设计规范6GB50242-2002建筑给水排水及采暖工程施工质量验收规范7JTS-257-2008水运工程质量检验标准8GB50208-2008给水排水管道施工及验收规范9CB50092-96沥青路面施工及验收规范10CJJ44-91城市道路路基工程施工及验收规范11JTJ298-98防波堤设计与施工规范12JTJ290-98重力式码头设计与施工规范13JTJ250-98港口工程地基规范14JTJ267-98港口工程混凝土结构设计规范15JTJ225-98 水运工程抗震设计规范16JTJ296-98港口道路、堆场铺面设计与施工规范17JTJ231-98港口工程环境保护设计规范18 JTJ221-98港口工程质量检验评定标准及局部修订编制原则: 1、各分项工程确保优良,力争创建优质样板工程。 2、在确保工程质量的前提下,按时完成本工程施工任务。将本工程作为文明施工示范工程来施工,创造一流建筑精品。 3、严格遵守国家、地方、行业有关建设工程施工管理规范和工程指挥部的有关规定。 4、施工中实现有效管理。做到组织合理,管理有效,服务到位。坚持技术先进、科学合理、经济适用、安全可靠、实事求是和信守承诺的原则。 5、遵守招标文件各项条款的要求,认真贯彻业主、监理工程师及其授权代表的指标和要求。 6、实行全员管理、全过程监控,优化资源配置,布局合理、突出重点、工作均衡、科学管理,确保各项施工持续高效地进行。 7、实施工程项目法管理,充分发挥团体精神,选派有同类工程施工经验的施工力量,利用成熟工艺,实现质量、工期、成本及社会效益的预期目标。 8、充分考虑施工过程对当地环境、生产及居民生活的不利影响,制定相应的措施,将其负作用降到最小,服从渔政港监部门的管理,尊重当地民俗民情。 9、强化质量意识,按ISO9002标准要求自身,实现企业“保持过程受控,创建优质工程,信守合同承诺,确保顾客满意。”的工作目标,树立企业形象,为当地的建设和社会的发展做贡献第二章 施工准备计划一、质量目标 1、分部、分项工程合格率100%,优良率95%以上,单位工程达到优良等级。2、争创优质样板工程。二、工期目标 本工程施工工期依据总工程施工总进度计划进行。三、安全目标杜绝死亡、重伤事故,现场施工人员的年轻伤率不大于1,杜绝各类工程安全事故。四、环保目标工程弃碴、污水排放、机械噪音、粉尘控制及生活垃圾处理均达到有关文明施工与环境保护的法律和规定标准,创建文明施工示范工地。组织设计:为确保本工程优质、安全、高效地完成,现场施工的总体组织和安排如下:1、利用原项目部管理人员组建精干现场项目管理小组,抽调经验丰富、业务精通、事业心和责任感强的技术、管理人员充实各岗位,落实管理职责,使整个项目组高度集中、统一指挥、内外协调、全面负责。2、调配专业水平高责任心强作业队伍投入项目施工。根据工程规模及特点,组建2支管道施工队,配备相配套的机械设备,分别承担各自管线的施工任务。3、同时,各施工队间积极开展劳动竞赛、质量竞赛、安全生产竞赛、文明施工竞赛,评优罚劣,将施工水平提高到一个新台阶。4、本项目采用分段法、标准化、样板工艺施工管理制度。第三章 工程特点、重点、施工难点及对策一、 自然条件1、 岸线和水深:1)、描述拟建工程位置、岸线长度与水深情况。必要时提供水下地形图。2)、分析现有岸线和水深。对工程有何影响和采取的对策。如:进行施工挖泥、船舶赶潮水作业等。2、 水位资料:1)、描述设计水位有关情况,应包括设计高水位,平均高水位,中水位,平均低水位,设计低水位,实用低水位等;施工用的高水位,低水位,平均水位和枯水位;高潮和低潮出现的时间和历时。2)、根据实测资料和结构施工的标高,分析施工作业历时;防汛水位和地方政府对防汛的要求等。3、 潮流资料:1)、描述工程潮流基本情况,包括水流、潮流的流速流向;涨落潮的历时和水位。2)、分析潮流对施工船舶的影响和应采取的对策等。4、 风:1)、描述风的方向、天数、风力和出现频率;台风出现的季节、级别、风向;地形风的情况。2)、分析风力和风向对工程施工的影响和采取的对策。5、 气温:1)、描述气温资料,高温和低温出现的时间和历时,必须考虑夏季高温及冬期施工的历时时间。2)、分析气温对施工的影响。6、 降雨:年降雨量和雨天数量,月最大和日最大降雨量的频率和雨量,暴雨和大暴雨出现的频率和雨量。7、 工程地质条件:1)、描述工程地质、地形、地貌、工程区域地质分层分布特征、地下水等。按建设单位(设计勘察单位)提供的地质报告,将对与施工有关的资料列入,并应列表表示,表中包括土层名称,厚度,土层层顶及层底标高,重度,天然含水量,内摩擦角,粘聚力,压缩系数,标准贯入击数值,静力触探值;附钻孔位置图和地质柱状图。2)、针对工程地质条件,分析对工程施工的影响与采取的对策。二、工程特点分散、工期紧、施工现场条件复杂 本工程工程量大,工期紧,这就对项目管理提出了较高要求,必须加大现场施工管理协调的力度,加大各项资源的投入。 2、各分项管道施工,必须合理安排好施工步骤,在现场管理中加强沟通、及时解决问题。 3、室外施工需考虑雨季和冬季施工的措施依据总工程计划工期,施工过程中需加强雨季和冬季施工措施。4、管道试验难度大管道纵横交错,管道型号多,局部会造成死角,给试压、系统冲洗造成一定的难度。5.因牵涉施工单位多,现场协调难度大。三、管道施工难点及主要对策 1、管道的吊装、运输管道吊装、运输时要尽量减少管道与钢性物体的摩擦与碰撞,以保护管子不受损坏。 2、 沟槽开挖及基础处理 1)、在冬雨季施工时,管沟开挖不易过长。在开挖过程中应结合工程地质和水文资料、气象资料。2)、管道安装好后应及时回填,为了防止下雨季节造成铺设的管道浮管应认真检查阀门,让阀门处于开启状态。 3)、管基为岩石地基时,应将基础整平夯实后,岩石面铺100mm厚中粗砂垫层,浇水振实;管基为回填土时,应设混凝土基础。4)、湿陷性黄土地基的处理方法 为了保证湿陷性黄土地基上管道的安全和正常使用,在绝大多数情况下都必须考虑地基处理,湿陷性黄土地基处理的目的是消除黄土的湿陷性,同时提高地基的承载能力。 5)、因交叉施工单位多,现场短路恢复不得过夜,并开展加班、加套管、铺设过路桥板等措施。3、试压封头:试压封头制作应严格按计算结果订购,以确保试压安全。4、管道试压、试验在管道开挖施工前,一定要落实详细的施工措施,其内容包括:1)、管道安装时,焊接好试压封头并编号记录,分段进行试压。管道试压的分段长度不大于1.0Km;2)、后背及试压封头的设计;3)、水管道、排气孔及排水孔的设计;4)、加压设备、压力计的选择及安装的设计;5)、排水疏导措施;6)、升压分段的划分及观测制度的规定;7)、试验管段的稳定措施;8)、安全措施。5、外部施工条件 1)、施工现场的特点:与周边建筑物和地下管线的关系,与拟建建筑物的关系,三通一平等。 2)、当地建筑材料供应情况:主要是钢材,木材,水泥,黄砂,石子等大宗建筑材料的供应情况,包括货源,运输条件,装卸条件,质量和价格及贮存条件。 3)、建设设备供应情况:设备供货方式,运输方法和手段;必要的设备装运图或列表表示。 4)、预制构件加工条件:工厂化加工和现场预制条件,运输条件,预制构件现场贮存条

    注意事项

    本文(cz唐山港京唐港区36号至40号煤炭泊位堆场、道路、管网及设备基础工程施工组织设计1.doc)为本站会员(sccc)主动上传,三一办公仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知三一办公(点击联系客服),我们立即给予删除!

    温馨提示:如果因为网速或其他原因下载失败请重新下载,重复下载不扣分。




    备案号:宁ICP备20000045号-2

    经营许可证:宁B2-20210002

    宁公网安备 64010402000987号

    三一办公
    收起
    展开