莱钢2没 烧结施工组织设计.doc
deployment requirements, vigorously strengthen the party's ideological and political construction, strong regulation" four winds ", the ideological and political quality of party members and cadres has a new improved. But also to see, some members cadres belief not really letter, and slim not really repair, not understand Marx doctrine principle, not learning party of innovation theory, not believes in party of political advocates; some members cadres party of consciousness and members consciousness desalination, in party not statements party, and not love party, and not nursing party, and not for party; some members cadres political discipline, and political rules relaxation, mouth no shoot, mess assessment jump on the party of policies and so on. Solve the problem of party members and cadres ideologically, must start with the ideological and political construction, through the "two" learning education into ideological and political work in day-to-day political life of the party, do fine catch, catch, catch a long, continuous force for a long time to work. 3. "two" education is condensed power development needs. With the deepening of reform and the full implementation of the rule of law, we are building "Qiang Fu MGM" an important task of the new XXX, which we need to rally the wisdom in all aspects, form a partnership to promote the development of a strong force. So, grass-roots party and general members to deep awareness "two learn a do" learning education of important meaning, effective activated grass-roots party fighting fortress role, full play members pioneer model role, in full district development strategy practice in the dang good vanguard, and led bar-headed geese, build a support has iron general belief, and iron general faith, and iron general discipline, and iron General play of members cadres team, for full district work provides strong political, and thought and organization based. 4. "two" learning education is to enhance the ability of party members and cadres needed. The current, complex and volatile state of the world of the party, our party is facing unprecedented difficulties and challenges since the ruling, but also shoulders an important responsibility of politics, society, history, more urgent goal of realizing the great rejuvenation of the Chinese nation. Specific to our personal, minority party members love to party, party, party, retaining the consciousness of the party still needs to be strengthened to work and conscientiousness, initiatives still need to be enhanced, capacity level needs to be further enhanced. Our party . Create "two learn a do" learning education of strong atmosphere on how carried out "two learn a do" learning education, central programme and also issued has learning education programme, Central Organization Department issued has learning education of programme, province, and municipal issued has implementation programme, for all members and at level above leaders of learning education, respectively proposed has different requirements, district also specifically developed has "1+2+4+1" of implementation programme, respectively clear has learning of main content, and Focus on ways and means of solving problems and learning. We want to seriously implement the Central and provincial, city and district of deployment requirements, as more strict and more practical spirit grasp this work. Innovative ways of learning, and earnestly study and understand. To always put learn Constitution Party rules, and learn series speech as "two learn a do" learning education of heavy in the of heavy, 中国第一冶金建设公司 施工组织设计目录目 录第一章综合说明11.1编制依据11.2编制原则1第二章 工程概况32.1本工程场址区域位置32.2工程范围32.3工程简介32.4厂区自然条件52.4.1气象条件52.4.2工程地质概况7第三章 施工布署83.1施工总体布署83.2施工阶段划分8第四章 施工总平面布置144.1施工总平面布置原则144.2施工平面布置144.3施工道路144.4施工供水154.5施工用电154.6施工排水154.7施工通讯164.8总平面管理164.9现场管理标准16第五章 施工进度计划185.1工期目标185.2施工进度计划185.3保工期的主要措施185.3.1组织保证185.3.2资源保证195.3.3管理措施19第六章 劳动力计划236.1施工人员计划安排原则236.2选派的施工队伍246.3劳动力计划25第七章 主要施工机械设备计划27第八章 主要周转材料和方案用料29第九章 材料管理计划309.1工程材料采购及管理309.2主要材料供应的质量保障309.3施工周转材料的供应保障319.4采购资金的保障319.5业主提供物资(甲供料)的保障31第十章 主要施工方案3210.1测量控制方案3210.2土建工程施工方案4510.2.1土石方爆破工程4510.2.2土方工程4510.2.3柱下独立基础4710.2.4环冷机基础施工5010.2.5设备基础施工5210.2.6框架主体结构工程5510.2.6.1钢筋制作5511.2.6.2钢筋绑扎与安装5710.2.6.3模板施工6010.2.7钢屋架制作6910.2.8钢屋架吊装7610.2.9压型钢板安装7810.2.10钢结构的制作8310.2.11砌体围护结构11010.2.12装饰装修施工11510.2.13屋面防水工程施工方案12110.2.14通廊施工12210.2.15钢筋混凝土烟囱施工12310.3机械设备安装13610.3.1烧结机的安装13610.3.2热破碎机安装15610.3.3皮带运输机的安装15819.3.4主抽风管道制作及安装15910.3.5主抽风机安装16210.3.6桥式起重机安装16310.3.7除尘风机安装16410.3.8一、二次混合圆筒机安装工艺16610.4管道工程17410.4.1管道加工一般规定17410.4.2管道支、吊架安装17910.4.3给排水管道18210.5电气安装施工18410.5.1电气楼盘柜安装方案18410.5.2动力变压器安装方案18710.5.3电气保护管安装方案19210.5.4电缆桥架安装方案19410.5.5电缆敷设方案19510.5.6 10kV高压电缆头制作方案19610.5.7柜内母线安装方案19710.5.8高压电机安装方案19910.5.9电气室照明安装方案20410.5.10防雷和接地系统安装20510.5.11安全滑触线及吊车安装方案20710.6电气调试方案20810.6.1调试准备20910.6.2调试的一般规定20910.6.3设备单元试验21010.6.4配电系统调试21410.6.5传动系统调试21710.6.6带机械设备运行时电气调试的要点22210.6.7桥式起重机调试22210.6.8 PLC的系统调试22310.7自动化仪表安装方案22610.7.1仪表安装一般规定22710.7.2常规仪表安装22810.7.3取源部件安装22910.7.4执行器安装23110.7.5导压管路安装23210.7.6导压管路试压23310.7.7电子皮带称安装23410.8自动化仪表调试23510.8.1调试准备23510.8.2仪表单体调试23510.8.3仪表系统调试23710.9电讯设施安装方案24110.9.1火灾报警安装方案24110.9.2 电话、工业电视安装方案24210.10工业计算机调试方案24410.10.1主机及硬件系统的调试24410.10.2软件系统调试24610.10.3应用软件调试24710.11试车方案24910.11.1设备单体试车方案24910.11.2无负荷联动试车方案25110.11.3热负荷联动试车保驾252第十一章 工程质量管理25411.1质量方针25411.2质量目标25411.4施工阶段的质量控制25511.5工程质量评定和竣工验收26011.6工程质量奖罚措施26111.7工程施工质量通病的预防措施26411.7.1混凝土工程质量通病的预防26511.7.2砌体门窗工程质量通病的预防26711.7.3抹灰工程质量通病的预防26711.7.5电气工程质量通病的预防措施270第十二章 安全施工保证措施27312.1安全目标27312.2安全保证体系27312.3安全措施27312.4安全工作规定27612.5施工现场防火规则27912.6施工临时用电安全管理规定28012.7施工安全计划28212.8 安全生产奖惩管理283第十三章 文明施工、环境保护措施28413.1文明施工守则28413.2进驻现场28413.3保持现场整洁28413.4设施维护28413.5竣工时现场清理28413.6本公司的文明施工规定284第十四 特殊季节施工措施28814.1风季施工措施28814.2冬季施工288第十五 工程回访和保修服务措施29015.1保修范围和保修期限29015.2回访程序29015.3回访人员组成及处理措施29015.4维修程序291through concentrated learn, and topic learn, and research learn, variety way, strengthened daily learning; carried out "learn Constitution, keep party rules" hundred day copy Constitution activities, do precision learning, insisted article-by-article step, and combines a, and station high telescope, in read original, and learn original, and Wu principle in the guben culture Yuan, complement "spirit of calcium", strengthening "belief of repair", cast "faith of soul". To looks at Yu party and national career of new development on members of new requirements, seriously organization members leaders topic democratic life, and branch topic organised will, further "mirror, and are dressed, and wash bath, and rule cure", self control party cultivation high not high, normal of carried out "three will a class", activities, further deep understanding "to who, and relies on who, and I is who", self review members consciousness strong not strong, timely error correction correction, effective do learn deep Wu through, and really understand really with. Second highlight-oriented learning, and earnestly oath State line. Any members of the party spirit, consciousness and moral level, neither with the accumulation of standing nor with his promotion of natural increase requires transforming the subjective world, strengthen character mold to establish firm ideals and convictions. Therefore, adhering to problem-oriented, problem-solving is "two" learning the internal requirements. In recent years, through the educational practice of the mass line of the party, "three-three" thematic educational activities, quality of party members and cadres in our region as a whole has improved, spirit has been changed, but there are still some outstanding issues and problems. Like part rural members discipline legal consciousness not strong, masses concept weak, pioneer model role play not obviously, on grass-roots democracy construction, and public affairs indifference, and not as, cannot consciously boycott yellow bet HIV against, entertainment activities not health not civilization, minority party fighting fortress role play not obviously, "three will a class", party political life, and "four on the two public", village level democratic decision enough serious specification, highlight problem, to effective do side learn side check side modified, and State said State line State modified, Excited in learning education in the party undertaking, energetic and enterprising spirit, into promoting reform and development, construction of "Qiang Fu MGM" engines of the new XXX. Three actual learning, focus on service work. Currently, we are in a period of reform and development of opportunities; construction of "Qiang Fu MGM" XXX is the new main . Party members perplexity and concern. Rich give a Party lecture form, encourage experiential party lecture, live party lecture, interview-style party lecture, using typical, positive and negative side, strengthening the attraction and appeal of party lecture. "71", each branch in conjunction with the beginning of the 95 anniversary activities, focused schedule 1 party lecture. Third branch of the Organization will be held. The full experience of educational practice using the mass line, "three-three" thematic education held a special democratic meeting and the Organization's practices, picked up the weapons of criticism and self-effectively to solve problems, promote unity and purpose. Four are conscientiously carrying out the democratic review. Combined thematic Organization25莱芜钢铁集团有限公司大H型钢生产线烧结工程 中国第一冶金建设公司 施工组织设计莱芜钢铁集团有限公司大H型钢生产线2#烧结机工程施 工 组 织 设 计第一章综合说明 1.1编制依据(1)莱芜钢铁集团有限公司大H型钢生产线2#265m2烧结机设计蓝图。(2)我公司近年承包施工类似工程的施工经验和技术档案、技术总结。(3)该项目现场踏勘和了解现场周边环境条件情况及掌握的数据。 (4)国家现行施工验收规范及验评标准。(5)GB/T19002ISO9002系列国际质量体系标准及一冶颁布实施的有关企业技术质量标准、生产工艺和操作规程。(6)国家现行安全生产法规。1.2编制原则符合性原则:即整个施工组织设计的编制符合莱芜钢铁集团有限公司大H型钢生产线2#265m2烧结机工程施工合同的要求、要约。其次是要符合基本建设施工的程序和客观规律及莱芜钢铁集团有限公司大H型钢生产线烧结工程的特点要求。先进性原则:即要求在符合性原则的基础上,结合本公司的技术、装备、员工素质为前提,采用科学的方法,先进的管理,优化的配置,完善的措施,实现先进的目标。合理性原则:即要求以符合性为前提,先进性为目标,在选择施工方案和组织管理体系时,结合莱芜钢铁集团有限公司大H型钢生产线烧结工程的实际,选择合理的施工方案和管理措施,在工期、质量、成本的最佳点上实现建设目标。满足业主要求的原则:按工程施工合同的要求,保证工程按期全部建成,达到能够投产或交付使用。严格遵守基本建设程序,在时间和空间(平面)两个方面统筹安排施工程序,缩短工期,加速建设进度,做到文明施工。采取合理的施工组织,作好人力、物力的平衡调配,均衡组织施工。贯彻施工验收、安全技术、环境保护等方面的法规、标准规范和规程,以及有关规章制度,保证工程质量和施工安全。采用科技成果和先进的技术组织措施,节约施工用料,提高工效,降低工程成本。充分利用高新技术,提高机械化施工程度,减少笨重体力劳动,提高劳动生产率。合理选择资源和运输方式,节省费用开支。第二章 工程概况2.1本工程场址区域位置莱芜钢铁集团有限公司大H型钢生产线烧结工程位于莱钢轧钢厂北银山开发区,位于大H型钢厂区东北部,机械化综合原料场西侧,回填地基,用地面积140000m2。现已建成投产一台265m2烧结机,年产成品烧结矿265万吨。拟建2#265m2烧结机位于1#烧结机南,主厂房建筑面积8500m2,钢筋混凝土结构为主,有通廊16条,转运站6个。由山东省冶金设计院承担设计。2.2工程范围2#265m2烧结机工程包括成品烧结矿和返矿系统、主抽风系统、配料混合系统、烧结冷却系统、筛粉整料系统、输灰系统、除尘、配电、自动化、循环水、公辅设施等土建、机电设备和安装、给排水(包括消防系统)采暖、压气、通风除尘、厂区管网等工程施工及其空负荷联动试车、配合联动试车。2.3工程简介本工程建设内容主要包括新建2#265m2烧结机及相应的配套辅助设施。2#烧结主厂房:按总图布置,2#烧结室在挖方区内,设计采用天然地基。烧结室厂房共六层,其各层标高分别为±0.00m,7.70m,15.20m,20.50m,24.70m,31.40m,34.70m,40.30m厂房内设二台中级工作制吊车(-LK=15.7m,Gn=16/3.2t;-LK=15.7 m Gn=50/10t),轨面标高29.5m,建筑面积8500m2。机头厂房采用钢筋混凝土框架结构,柱距为7.5m,烧结跨为18m,柱距为6m的钢筋混凝土框排架结构厂房,机尾厂房跨度18m,柱距分别为14.5m, 12m,14.5m ,10m的钢结构排架厂房。围护采用加气混凝土砌块,内外墙采用混合砂浆抹面,外墙刷米黄色涂料。内墙喷大白,屋面采用卷材防水。素混凝土地面,吊车梁采用钢结构。2#配料室:厂房长133.5m,宽8m,檐口高度为23.4m,柱距8m,设两道伸缩逢,钢筋混凝土框架结构。内设3t电动葫芦三台,轨顶标高分别为 6.43m,22.0m,26.0m。钢筋混凝土现浇平台三层;附跨长8m,宽5.5m,高27.3m。厂房柱基础采用现浇钢筋混凝土基础,墙基采用现浇混凝土基础梁,混凝土砌块墙围护,料仓采用钢料仓。棒磨机室:单层厂房长27m,宽13.5m,檐口高度为14.0m,钢筋混凝土基础,上部为钢结构厂房.附配电室和值班室。内设一台电动单梁吊(LK=12.0m,Gn=10t),轨面标高12m,建筑面积471m2。2#烧结抽风机室:主抽风机室为排架结构,跨度为15.0m,柱距为6.0m,总长宽42.0m。轨顶标高15.0m,檐口标高19.5m。内设一台32/5吨吊车,中级工作制,LK=13.5m。排架柱采用钢筋混凝土现浇柱,屋架采用钢屋面梁,屋面板采用SP预应力钢筋混凝土板,吊车梁采用钢吊车梁,钢筋混凝土独立基础,围护墙体采用空心砌块或加气混凝土砌块排水为有组织排水。抽风机基础采用钢筋混凝土大块式基础,旁边附属的配电室为两层砖混结构,平面尺寸:12.0m×4.8m,层高均为3.2m。2#一次混合室:单层厂房长22.5m,宽15m,檐口高度为14.4m,钢筋混凝土框架结构,局部设钢筋混凝土现浇平台。内设10t电动单梁起重机一台,钢筋混凝土现浇柱基础,墙基采用毛石基础,混凝土砌块墙围护,钢筋混凝土现浇设备基础。2#二次混合室:单层厂房长27m,宽15m,檐口高度为15.3m,钢筋混凝土框架结构,局部设钢筋混凝土现浇平台。内设10t电动单梁起重机一台,附跨控制室,低压配电室采用砖混结构,总长9m,宽4.5m,檐口高度为3.6m。钢筋混凝土现浇柱基础,墙基采用毛石基础,混凝土砌块墙围护,钢筋混凝土现浇设备基础。一、二次筛分室:一、二次筛分室厂房结构已在一期建成,二期只进行设备安装.烟囱:采用钢筋混凝土结构,内衬采用砖和矿渣棉,总高度150.0m,上口内径4.88m,下口内径14.12m,钢筋混凝土基础,烟道采用钢筋混凝土结构,壁厚300mm。转运站及通廊:转运站结构采用钢筋砼框架结构,砼砌块墙围护,地上通廊部分采用钢结构通廊,压型钢板墙面、屋面,支架采用钢支架。10KV高配室:单层砖混结构,长26.3m,宽14.2m,檐口标高为4.8m。建筑面积373.46m2,钢筋混凝土现浇柱基础,墙基采用毛石基础。除尘系统:除尘系统包括机尾电除尘,机头电除尘,配料室除尘。配电室均采用砖混结构,除尘烟囱采用钢烟囱,风机电机基础采用钢筋混凝土现浇基础。墙基采用毛石基础,混凝土砌块墙围护。2.4厂区自然条件2.4.1气象条件 1)温度 年平均温度 12.5 最冷月平均温度 -9.0 最热月平均温度 31.2极端最低温度 -22.5极端最高温度 39.2采暖室外计算温度 -7.8冬季采暖室外计算温度 -3.3夏季通风室外计算温度 29.32)湿度 冬季平均相对湿度 56% 夏季平均相对湿度 78%冬季采暖室外计算相对湿度 38%夏季通风室外计算相对湿度 65%3)风速冬季室外平均风速 2.3m/min夏季室外平均风速 2.1m/min年平均风速 2.4m/ min 瞬时最大风速 40.0m/ min 年主导风向 东10% 夏季主导风向 东 冬季主导风向 东4)降水量年平均降水量 735.1mm年最大降水量 1369.6mm日最大降量 168.8mm一小时最大降水量 100.5mm十分钟最大降水量 20.0mm5)最大积雪深度 240mm6)最大冻土深度 440mm7)雷击日数 167.6d最多雷击日数 213d8)平均冰雹出现天数 0.6d 最大冰雹出现天数 2d9)平均雾天(年平均) 5.4d最多每年雾天 19d10)大气压力冬季大气压力 1003.6mb 夏季大气压力 983.8mb11)全年日照时间 2574.9h2.4.2工程地质概况建设区场地为低山地带,地层自老至新有太古界泰山群变质岩,古生界寒武系、奥陶系、石炭系、二叠系等沉积岩,以及新生界第四系表土层,地基土分粉质粘土、强风化泥、中风化泥灰岩和石灰岩四层,拟建场地一般可满足建厂的天然地基要求。2.4.3工艺流程 烧结车间的工艺流程包括溶剂燃料准备系统,配料混合系统、烧结冷却系统、筛分整粒系统、铺底料系统、返矿和输灰系统。详见工艺流程图(附表一)。第三章 施工布署3.1施工总体布署烧结系统施工以烧结机主厂房为关键线路,遵循先地下后地上、先结构后设备、先主体后附属的原则来进行。根据莱钢烧结场地的特点和到图情况,只要条件具备,其它厂房可以平行组织施工。首先施工柱基础,待柱基施工二分之一后,进行穿插流水施工上部钢筋混凝土结构施工,然后进行设备基础施工和上部建筑屋面、围护结构、吊装。厂房结构吊装的同时,可以将一些大件如:烧结机下部的主抽风管道、灰斗等穿插吊装到位。厂房结构基本吊装完后进行机电设备的安装调试。烧结机等设备安装,基本上遵循从下往上依次安装。全厂三电系统按常规前期配合土建埋管。后期分两条线进行:一边抓电气室和电缆通道的盘、柜和电缆安装;一边紧随机械设备安装操作盘箱和接线。3.2施工阶段划分本工程的施工主要分为五个阶段:第一阶段:施工准备阶段(1)组织准备:2#烧结机将继续在以一级项目经理、高级工程师曾毅恒同志为项目经理的一冶莱钢烧结工程项目经理部领导下组织施工。土建工程项目部、结构管道工程项目部、机械安装工程项目部、电气安装工程项目部等专业项目部基本上以一烧结的原班人马为主,同时增加了三个土建工程项目部。(2)技术准备:开工前,组织施工技术人员认真熟悉施工图纸,充分领会设计意图,了解生产工艺特点。会同业主、设计院、监理进行专业图纸会审。结合一期烧结施工经验编制各单位工程的施工组织设计,编制分部工程关键工序,及特殊工序的施工作业设计。进行技术交底,制定本工程项目质量计划。各种所需规范、标准和资料表格到位。(3)资源准备:建立两级工程项目经理部,两级项目部的管理人员全部到位,办公设施全部配齐。专业施工队伍(作业层),按照劳动力进场计划,组织劳动力进场。同时进行厂纪、厂规、安全、防火、文明施工等方面教育,建立各项管理制度。根据施工进度计划