欢迎来到三一办公! | 帮助中心 三一办公31ppt.com(应用文档模板下载平台)
三一办公
全部分类
  • 办公文档>
  • PPT模板>
  • 建筑/施工/环境>
  • 毕业设计>
  • 工程图纸>
  • 教育教学>
  • 素材源码>
  • 生活休闲>
  • 临时分类>
  • ImageVerifierCode 换一换
    首页 三一办公 > 资源分类 > DOC文档下载  

    ye(接地)02 扁钢接地.doc

    • 资源ID:4800498       资源大小:408.01KB        全文页数:14页
    • 资源格式: DOC        下载积分:10金币
    快捷下载 游客一键下载
    会员登录下载
    三方登录下载: 微信开放平台登录 QQ登录  
    下载资源需要10金币
    邮箱/手机:
    温馨提示:
    用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)
    支付方式: 支付宝    微信支付   
    验证码:   换一换

    加入VIP免费专享
     
    账号:
    密码:
    验证码:   换一换
      忘记密码?
        
    友情提示
    2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
    3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
    4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。
    5、试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。

    ye(接地)02 扁钢接地.doc

    shall assign a person in custody; Acceptance can be carried out operations, acceptance or unqualified acceptance not made the next processes work; 10, the construction site . Construction construction construction organization name project name 4-2-7 content security technology to give the low-down the content to the hopper cars, against a measure, not too much force and withdrawal, on the feet may not be in the hopper, rises below shall not stand. When cleaning the hopper of concrete stone, two bucket chain must be fastened; When running in a blender, tools may not be inserted into the drum; Derrick transport, car steering wheel shall not be extended outside the cage, wheel wedge before and after; Water frame beams and concrete, to observe the formwork, formwork systems, unusual in reporting in a timely manner, no operations directly on the template or support; Irrigation structures when the edge of the concrete columns, beams, external platforms necessary security measures; Water in deep Foundation pit base during construction before, you should check whether the pit slope soil collapse collapse danger, if found, should be reported immediately and to take measures; Should wear protective equipment when using vibration, with leakage protection switch move switch box; Acceptance before for work, not to unqualified acceptance or acceptance not made the next processes work; Pumping concrete should be independent and reliable support; 10, site specific security cards; 11, the other. Disclosure signatures to accept cards deliver the signature time Japan form in duplicate, teams from the deposit of an instrument, and filed a report. Assembly and disassembly of tower crane safety technology gives the low-down (reference tables) construction construction construction organization name project name 4-2-8 content security technology to give the low-down the content strictly according to the tower crane, remove programme implementation operations, operating personnel must have professional training and with valid ID to work; Special command, coordination, and ensure safety in production; Working at height strictly comply with the safety specifications; The erection and removal of prohibited people who stay within the operating area; Carefully check the lifting wire and clasps, strictly according to the updated standards update; Carefully check all bolts, lock shaft damage, fatigue, cracking to update in a timely manner; Solid hydraulic jacking system of ministries in charge of the joint; Removal affect the safe operation of wires, check the insulation of cables and wires are good, motor connection is correct, the switch movement is sensitive and reliable; Must have a good grounding facilities, grounding resistance value shall not be more than 4 ohm; 10, to ensure that effective safety devices, such as lifting the limiters, torque limiters, height restrictions, stroke and hooks insurance, reel safety devices; 11, acceptance may behraje lék kontejner a pebaly, po pouití, k centralizované spalování, obsadit uvolnný, by nemly být ztraceny. 5, kadá jednotka pomocí vysoce toxické látky musí být zaznamenány v detailu, vetn jméno, íslo, mnoství a zabavování personálu, píjemc a tak dále. 6, pouívání vysoce toxických látek musí projít bezpenostní výcvik a terciární vzdlání, obeznámen s drogami nebezpené vlastnosti hry. Sektor zpráva, a do návratu do normálu. 3.3. kadé oddlení podle jejich vlastní odpovdnosti, nouzové záchranné riziko komunikaní nástroj provádí kontroly v pravidelných intervalech. Kontrola skryté není na míst, není zpráva vedení úraz, odpovdnost za vánou zodpovdnost. 4. Správa nouzové záchranné zaízení 4.1. pozice podle nebezpené povahy nebezpenosti a postoj, oznámil v plné výi k ízení bezpenosti záchranného zaízení. 4.2. post je vybaveno nouzovým vybavením specializované archivy, vetn platebního období, jednotky zakázek, odpovdný za péi, uívání, inspekní záznamy a jiné záznamy. 5. nouzové záchranné vedoucí skupiny v ízení 5.1 nouzové záchranné cviení, vedoucí skupina by mla mít alespo velení, operací, plánování, logistika, administrativa sloené z 5 základní havarijní funkcí. 5.2 nouzové záchranné cviení by mly být plánovány a pipravené nouzovou. pohotovostní plány pro vechny aspekty ohroení záchranu podrobnosti jsou v pedstihu, je vasné, ádné a úinné kroky prvodce pro nouzové záchranné práce. Nouzové postupy a by ml organizovat experti na revizi, podepsané hlavami velkých vydavatelství implementována po pijetí a zvyování povdomí, vzdlávání a kolení a neustálé zlepování. 5.3 podle plánované vrty, rzné typy pracovník podílejí na opotebení vrtáku nouzové záchranné symbolem své identity v procesu. Návod vech kategorií zamstnanc v divizi pro n tvoí jasnou linii velení zajistit správnost rozhodnutí a celistvost a úinnost reakce. 5.4 po skonení návod, vyhodnotit výsledky návod a návod zprávy, ekl dobe návod problémy v kurzu, a v dalím návodu zlepení nebo nápravných opatení. 6 nouzové management 6.1, po nehod, zjistila, e jednotky nebo lidí v okolí hláeny. Pole bezpenostní opatení mají být pijata, dosah do sanitky, ne slep nebo pohotovost pi nechránném personál. 6.2, jednotka vedení po obdrení hláení nehody podle nehody k urení, zda chcete aktivovat havarijní plány. Pokud potebujete rodie pomoc a záchranu, spadají pod nadazenou jednotku a poádat o podporu. 6.3, nouzové záchranné ústedí na základ zmny scény, vasné pizpsobení nouzová opatení, likvidaci havarijní personál v souladu s mimoádná opatení. 6.4, vedoucí týmu, pedák poslouchat píkaz píkaz v regionu, aktivn pijímat opatení k ústupu ádné organizace zabezpeení polí. 6.5, stránky personáthe principle of simplified EIA of construction projects in the region. In terms of land, linked to the implementation of urban and rural construction land increase and decrease, replacement indicators for priority areas project. Charges, into the projects of water, electricity, administrative charges and preferential policies. In the area of taxation, and settled in areas of industry and its production company, within 5 years after the completion of fiscal incentives to enterprises. In terms of financing, integration of land, tax, financial and other resources, and construct "Government credit + business credit" credit system, establishment of marketization, commercialization and modernization of the investment and financing platform; effective Bank-enterprise docking, encourages private capital into the Park, to raise industry development fund. 5, optimize the environment and service industries. To create "policy lowlands, Highlands, integrity of service land, development land" as the goal, to optimize the area under development environment. All administrative law enforcement departments to appoint a full-time personnel stationed in areas dedicated to coordinating and solving problems associated with businesses in this sector. When there are substantial issues, sector leaders arranged to personally intervene, in-person, in-person push tangible area building a green light, easy line. To further reduce and standardize administrative examination and approval items, simplify examination and approval links, improve efficiency; according to the .Since the educational practice of the mass line of the party, himself seriously in the education, practical control central "eight rules" and opposing "the four winds" and practicing "three Suns", and check the spirit of Jiao Yulu, ideology, solicit opinions based on outstanding problems checked swing, careful analysis and reflection. Will now check report is as follows: first, adherence to the party's political discipline, eight in the central provision, change the style of the basic situation of 1, in compliance with the party's political disciplines. Conscientiously abide by the party's political discipline, abide by the Constitution and the rules and regulations of the party, in the political, ideological and maintain highly consistent with the CPC Central Committee on the action, there is no violation of the party's political discipline problems. 2, in the implementation of the central authorities of the eight provisions. Improving research, improving research methods, but there are less grass-roots units, primary first-hand an inadequate grasp of the problem, which is to be strengthened in the future. Second, construction, strictly in accordance with the provisions to streamline and improve the quality of meetings of the Conference. Third, streamlining file briefs, culture involves all aspects of propaganda and ideology, sometimes due to the practical needs of invention notifications, this area needs furtherplan environmental impact assessment before and after project approval," the principle of simplified EIA of construction projects in the region. In terms of land, linked to the implementation of urban and rural construction land increase and decrease, replacement indicators for priority areas project. Charges, into the projects of water, electricity, administrative charges and preferential policies. In the area of taxation, and settled in areas of industry and its production company, within 5 years after the completion of fiscal incentives to enterprises. In terms of financing, integration of land, tax, financial and other resources, and construct "Government credit + business credit" credit system, establishment of marketization, commercialization and modernization of the investment and financing platform; effective Bank-enterprise docking, encourages private capital into the Park, to raise industry development fund. 5, optimize the environment and service industries. To create "policy lowlands, Highlands, integrity of service land, development land" as the goal, to optimize the area under development environment. All administrative law enforcement departments to appoint a full-time personnel stationed in areas dedicated to coordinating and solving problems associated with businesses in this sector. When there are substantial issues, sector leaders arranged to personally intervene, in-person, in-person push tangible area building a green light, easy line. To further reduce and standardize administrative examination and approval items, simplify examination and approval links, improve efficiency; according to the .Since the educational practice of the mass line of the party, himself seriously in the education, practical control central "eight rules" and opposing "the four winds" and practicing "three Suns", and check the spirit of Jiao Yulu, ideology, solicit opinions based on outstanding problems checked swing, careful analysis and reflection. Will now check report is as follows: first, adherence to the party's political discipline, eight in the central provision, change the style of the basic situation of 1, in compliance with the party's political disciplines. Conscientiously abide by the party's political discipline, abide by the Constitution and the rules and regulations of the party, in the political, ideological and maintain highly consistent with the CPC Central Committee on the action, there is no violation of the party's political discipline problems. 2, in the implementation of the central authorities of the eight provisions. Improving research, improving research methods, but there are less grass-roots units, primary first-hand an inadequate grasp of the problem, which is to be strengthened in the future. Second, construction, strictly in accordance with the provisions to streamline and improve the quality of meetings of the Conference. Third, streamlining file briefs, culture involves all aspects of propaganda and ideology, sometimes due to the practical needs of invention notifications, this area needs furtherWe will continue to improve the company's internal control system, and steady improvement in ability to manage and control, optimize business processes, to ensure smooth processes, responsibilities in place; to further strengthen internal controls, play a control post independent oversight role of evaluation complying with third-party responsibility; to actively make use of internal audit tools detect potential management, streamline, standardize related transactions, strengthening operations in accordance with law. Deepening the information management to ensure full communication "zero resistance". To constantly perfect ERP, and BFS+, and PI, and MIS, and SCM, information system based construction, full integration information system, achieved information resources shared; to expand Portal system application of breadth and depth, play information system on enterprise of Assistant role; to perfect daily run maintenance operation of records, promote problem reasons analysis and system handover; to strengthening BFS+, and ERP, and SCM, technology application of training, improve employees application information system of capacity and level. Humanistic care to ensure "zero." To strengthening Humanities care, continues to foster company wind clear, and gas are, and heart Shun of culture atmosphere; strengthening love helped trapped, care difficult employees; carried out style activities, rich employees life; strengthening health and labour protection, organization career health medical, control career against; continues to implementation psychological warning prevention system, training employees health of character, and stable of mood and enterprising of attitude, created friendly fraternity of Humanities environment. To strengthen risk management, ensure that the business of "zero risk". To strengthened business plans management, will business business plans cover to all level, ensure the business can control in control; to close concern financial, and coal electric linkage, and energy-saving scheduling, national policy trends, strengthening track, active should; to implementation State-owned assets method, further specification business financial management; to perfect risk tube control system, achieved risk recognition, and measure, and assessment, and report, and control feedback of closed ring management, improve risk prevention capacity. To further standardize trading, and strive to achieve "according to law, standardize and fair." Innovation of performance management, to ensure that potential employees "zero fly". To strengthen performance management, process control, enhance employee evaluation and levels of effective communication to improve performance management. To further quantify and refine employee standards . Work, full play party, and branch, and members in "five type Enterprise" construction in the of core role, and fighting fortress role and pioneer model role; to continues to strengthening "four good" leadership construction接地装置扁钢及圆钢通用施工工艺 QJ/DQ(接地)02接地装置扁钢及圆钢通用施工工艺1 适用范围1.1 本通用施工工艺适用于装置区接地装置扁钢及圆钢安装。2 编制依据2.1电气装置

    注意事项

    本文(ye(接地)02 扁钢接地.doc)为本站会员(sccc)主动上传,三一办公仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知三一办公(点击联系客服),我们立即给予删除!

    温馨提示:如果因为网速或其他原因下载失败请重新下载,重复下载不扣分。




    备案号:宁ICP备20000045号-2

    经营许可证:宁B2-20210002

    宁公网安备 64010402000987号

    三一办公
    收起
    展开