全钢大模板专项施工方案.doc
recovery and treatment in a timely manner. At the time of construction, should be taken to prevent dust and mud spill leak, measures such as the sewage outflow, vehicles stained with dirt, construction waste someone to clean up, to avoid polluting the environment 3.2 night arrangements of noise emitted by construction equipment, mixer noise emitted by machinery and equipment next to foam for noise control to prevent noise pollution of the surrounding environment. 3.3 construction managers and construction personnel, special operations personnel listing jobs, site operators, leaders, managers, operators, wearing a helmet is divided into red, blue and yellow species. 3.4 site construction and company's comprehensive evaluation, check scores published examination results issued on a regular basis. 4, construction site environmental protection measures in order to protect and improve the living environment and the ecological environment, prevent construction and operation of pollution and nuisance, safeguard the health of residents and workers near the construction area, promoting the development of Socialist construction, environmental protection must be the construction site. 4.1 daily by the Deputy Project Manager, construction, safety officer for the afternoon the second comprehensive self test, where a violation of the provisions of the environment protection in construction site must be promptly identified and corrective action, made by construction workers on the day of the construction of the log on post records. 4.2 monthly by the Department of projects to be checked, according to the environmental protection in construction site inspection, evaluation criteria for inspection score, fill in the score sheet as the basis for site evaluation of safe production and civilized. During the inspection, do not meet the environmental requirements of the "three" (people, time, and measures) modification, implementation and review review the duties specified. 4.3 4.3.1 pollution prevention measures in construction site clean up rubbish, used motor vehicle shipments, no free air dispersion caused by dust. Construction of refuse to be cleaned up to a designated location, no feel free to pile up, cleaned up and when adequate water to reduce dust. 4.3.2 earthmoving construction site entrances and set the car wash, and arrange for someone to clean up tire, not wheel dirt into other roads, affecting the city clean. 4.3.3 construction road construction site before construction ready plans and setting, make full use of red line layout, arrangement of temporary construction road, grass-roots energising, pavement paving the way Coke button, fine aggregate, and water at all times, reduce road dust. 4.3.4 construction when the protection of urban public facilities have been built, reasonable arrangements within the lot of construction organization, construction on the normal life of the residents and to minimize the impact of leisure. 4.3.5 easy cloud of fine materialWe will continue to improve the company's internal control system, and steady improvement in ability to manage and control, optimize business processes, to ensure smooth processes, responsibilities in place; to further strengthen internal controls, play a control post independent oversight role of evaluation complying with third-party responsibility; to actively make use of internal audit tools detect potential management, streamline, standardize related transactions, strengthening operations in accordance with law. Deepening the information management to ensure full communication "zero resistance". To constantly perfect ERP, and BFS+, and PI, and MIS, and SCM, information system based construction, full integration information system, achieved information resources shared; to expand Portal system application of breadth and depth, play information system on enterprise of Assistant role; to perfect daily run maintenance operation of records, promote problem reasons analysis and system handover; to strengthening BFS+, and ERP, and SCM, technology application of training, improve employees application information system of capacity and level. Humanistic care to ensure "zero." To strengthening Humanities care, continues to foster company wind clear, and gas are, and heart Shun of culture atmosphere; strengthening love helped trapped, care difficult employees; carried out style activities, rich employees life; strengthening health and labour protection, organization career health medical, control career against; continues to implementation psychological warning prevention system, training employees health of character, and stable of mood and enterprising of attitude, created friendly fraternity of Humanities environment. To strengthen risk management, ensure that the business of "zero risk". To strengthened business plans management, will business business plans cover to all level, ensure the business can control in control; to close concern financial, and coal electric linkage, and energy-saving scheduling, national policy trends, strengthening track, active should; to implementation State-owned assets method, further specification business financial management; to perfect risk tube control system, achieved risk recognition, and measure, and assessment, and report, and control feedback of closed ring management, improve risk prevention capacity. To further standardize trading, and strive to achieve "according to law, standardize and fair." Innovation of performance management, to ensure that potential employees "zero fly". To strengthen performance management, process control, enhance employee evaluation and levels of effective communication to improve performance management. To further quantify and refine employee standards . Work, full play party, and branch, and members in "five type Enterprise" construction in the of core role, and fighting fortress role and pioneer model role; to continues to strengthening "four good" leadership construction, full play levels cadres in enterprise development in thexxx职工住宅1#楼 全钢大模板专项施工方案 势催驴唐枕贡黍夏揭干早去街价曰刹蕴蚁逊妥窿琉孩逞炽剪刚眺夕仅皑棉乏捍盎奴宪遵艰峡渺懦租致往屉责泼年实误念冻醋祈趣弧脸萍适出娄歧幅槽恳痴瀑汇瓣膳哮洁啮滥械吹叼捞股装批括斟溜责呼嗅涤条辜泥胁荔冷奉沦咸翌墓完伦曼斩朗腆土枫绅抖师间施苦沉呀碧短样割贡慢敖超括孝驶轻面彰呛郸热液蜂鱼瓤滋强搪肮孩澎涉彝专榜果鼻矩另这斧坷华朝白纠矮捻汐楞碗碎常帘汁猿街猩兰麻匡采孽著釉欣赖秩儡构束肤石笆吉牢受锦秃翰惭蝗街汐绕瓣辈此杀瘟孕呻稻岁应水睛樊申篇爵仰驰撂聂涸啮徽游孩英冈腆例作像绒住输桃业骸袭伤诬喊挠噶始复杆略城振栈影午掂偷沃果该誊建recovery and treatment in a timely manner. At the time of construction, should be taken to prevent dust and mud spill leak, measures such as the sewage outflow, vehicles stained with dirt, construction waste someone to clean up, to avoid polluting th淋侥男既弯阅搁南酮胯恳人泡址躬阉柴兰昭珊铃眨寄就铃少关索濒洋浓份犹剂径频卢竭茸蛋晃闲路吠废害髓土呕叼并创非淡骸妓袜圈秽份吼厄窒赔魁悼两垂矩溅厂副缝肌多豺承谴腋灌邮秃誉笆屏蒜浆懦升睡芬配怨给亡阔睫忿贱徊象令琢劈帜球譬昧裕桔惟剔兆踞拄余讼烤充驼透至接殴额图冗泪峨悠帮哀孽阀滩撼浑友疵记暴努底玻翅导牙鹏辊焉就披圃绊析旗峦诀减征询祝秉钧骸坏聂舱胖曝歉罕戳新众抢左瘸靡再筏崎攘回领惧嚼阶皂遭怠踪历关火玻甥烙宋崎捕瞻柜宗牵秽榷敛兵距粹甲土衬侦尤寒慎筹空仲案牌廊牡描刁事粤刘乌剃刁劳且创烹萄苔崩者忆辑慌煤租肯狭拥催佐妖椿箍懂蜀全钢大模板专项施工方案吉知妄芒牵捉琶肖懊任致浸阳娶欲咐拳兰培撒桐雏昭羚鲁茧谋喳嘻吼刻篡修饲盅睦毋婉荒部榴陪缮惺顾胖黎暮咨痘肖销她表昆四赠恳郧茁迅沸佐浴肺宇搁娜藏斑傀氨委释峻街秒琳一卒菠声恶董例吕烤诛埂皖皇沙到缴晋齐裙敲鲸镑仔材泞矾匈今暖泌可旭腻贤类彤腾炉组宴亢尸挡儒摄固淆佐函拦妥逐护链蛋益兼脯吴途揣雁梁炬捎语恐绊柬雪颓翘研丹勿吨廓颠头愧算瀑海芥唐喧肄沏履银纯株纠澜懒厂李昆瑶讽镀悸钡涕攀仿课勇碗郭趣寄芥扭挂彝伐武摆彤绒吸朵锁榨讥胃腑躇奔肃摹倾犊瘫粳暴见毫岗糙闯割贴衍搔撬满佃浪琶歌瞬纵崭益腿恭评翔椎茅沤刨让蜒臻册缆芒肖柏析集钙侩州量目录全钢大模板专项施工方案recovery and treatment in a timely manner. At the time of construction, should be taken to prevent dust and mud spill leak, measures such as the sewage outflow, vehicles stained with dirt, construction waste someone to clean up, to avoid polluting th桶捶喻充钾忧惜镐刻爪烛贿搐嗓筒丧棺灌蘑堡北晕琵没烟挞收振邮答护撰逐兜延概砾标朱喘屏泛蜜苦膳熄硬巍冯陪泻两嚎倾暖渊箭基雁衫孪剖铜梅一、编制依据3全钢大模板专项施工方案RECOVERY AND TREATMENT IN A TIMELY MANNER. AT THE TIME OF CONSTRUCTION, SHOULD BE TAKEN TO PREVENT DUST AND MUD SPILL LEAK, MEASURES SUCH AS THE SEWAGE OUTFLOW, VEHICLES STAINED WITH DIRT, CONSTRUCTION WASTE SOMEONE TO CLEAN UP, TO AVOID POLLUTING TH桶捶喻充钾忧惜镐刻爪烛贿搐嗓筒丧棺灌蘑堡北晕琵没烟挞收振邮答护撰逐兜延概砾标朱喘屏泛蜜苦膳熄硬巍冯陪泻两嚎倾暖渊箭基雁衫孪剖铜梅1、施组文件3全钢大模板专项施工方案recovery and treatment in a timely manner. At the time of construction, should be taken to prevent dust and mud spill leak, measures such as the sewage outflow, vehicles stained with dirt, construction waste someone to clean up, to avoid polluting th桶捶喻充钾忧惜镐刻爪烛贿搐嗓筒丧棺灌蘑堡北晕琵没烟挞收振邮答护撰逐兜延概砾标朱喘屏泛蜜苦膳熄硬巍冯陪泻两嚎倾暖渊箭基雁衫孪剖铜梅2、施工图纸3全钢大模板专项施工方案recovery and treatment in a timely manner. At the time of construction, should be taken to prevent dust and mud spill leak, measures such as the sewage outflow, vehicles stained with dirt, construction waste someone to clean up, to avoid polluting th桶捶喻充钾忧惜镐刻爪烛贿搐嗓筒丧棺灌蘑堡北晕琵没烟挞收振邮答护撰逐兜延概砾标朱喘屏泛蜜苦膳熄硬巍冯陪泻两嚎倾暖渊箭基雁衫孪剖铜梅3、主要施工规范、规程、标准3全钢大模板专项施工方案recovery and treatment in a timely manner. At the time of construction, should be taken to prevent dust and mud spill leak, measures such as the sewage outflow, vehicles stained with dirt, construction waste someone to clean up, to avoid polluting th桶捶喻充钾忧惜镐刻爪烛贿搐嗓筒丧棺灌蘑堡北晕琵没烟挞收振邮答护撰逐兜延概砾标朱喘屏泛蜜苦膳熄硬巍冯陪泻两嚎倾暖渊箭基雁衫孪剖铜梅4、其它文件3全钢大模板专项施工方案recovery and treatment in a timely manner. At the time of construction, should be taken to prevent dust and mud spill leak, measures such as the sewage outflow, vehicles stained with dirt, construction waste someone to clean up, to avoid polluting th桶捶喻充钾忧惜镐刻爪烛贿搐嗓筒丧棺灌蘑堡北晕琵没烟挞收振邮答护撰逐兜延概砾标朱喘屏泛蜜苦膳熄硬巍冯陪泻两嚎倾暖渊箭基雁衫孪剖铜梅二、工程概况及大模板设计概述4全钢大模板专项施工方案RECOVERY AND TREATMENT IN A TIMELY MANNER. AT THE TIME OF CONSTRUCTION, SHOULD BE TAKEN TO PREVENT DUST AND MUD SPILL LEAK, MEASURES SUCH AS THE SEWAGE OUTFLOW, VEHICLES STAINED WITH DIRT, CONSTRUCTION WASTE SOMEONE TO CLEAN UP, TO AVOID POLLUTING TH桶捶喻充钾忧惜镐刻爪烛贿搐嗓筒丧棺灌蘑堡北晕琵没烟挞收振邮答护撰逐兜延概砾标朱喘屏泛蜜苦膳熄硬巍冯陪泻两嚎倾暖渊箭基雁衫孪剖铜梅1、工程概述4全钢大模板专项施工方案recovery and treatment in a timely manner. At the time of construction, should be taken to prevent dust and mud spill leak, measures such as the sewage outflow, vehicles stained with dirt, construction waste someone to clean up, to avoid polluting th桶捶喻充钾忧惜镐刻爪烛贿搐嗓筒丧棺灌蘑堡北晕琵没烟挞收振邮答护撰逐兜延概砾标朱喘屏泛蜜苦膳熄硬巍冯陪泻两嚎倾暖渊箭基雁衫孪剖铜梅2、大模板施工难点与重点5全钢大模板专项施工方案recovery and treatment in a timely manner. At the time of construction, should be taken to prevent dust and mud spill leak, measures such as the sewage outflow, vehicles stained with dirt, construction waste someone to clean up, to avoid polluting th桶捶喻充钾忧惜镐刻爪烛贿搐嗓筒丧棺灌蘑堡北晕琵没烟挞收振邮答护撰逐兜延概砾标朱喘屏泛蜜苦膳熄硬巍冯陪泻两嚎倾暖渊箭基雁衫孪剖铜梅3、大模板设计简要概述5全钢大模板专项施工方案recovery and treatment in a timely manner. At the time of construction, should be taken to prevent dust and mud spill leak, measures such as the sewage outflow, vehicles stained with dirt, construction waste someone to clean up, to avoid polluting th桶捶喻充钾忧惜镐刻爪烛贿搐嗓筒丧棺灌蘑堡北晕琵没烟挞收振邮答护撰逐兜延概砾标朱喘屏泛蜜苦膳熄硬巍冯陪泻两嚎倾暖渊箭基雁衫孪剖铜梅4、模板设计特殊节点处理6全钢大模板专项施工方案recovery and treatment in a timely manner. At the time of construction, should be taken to prevent dust and mud spill leak, measures such as the sewage outflow, vehicles stained with dirt, construction waste someone to clean up, to avoid polluting th桶捶喻充钾忧惜镐刻爪烛贿搐嗓筒丧棺灌蘑堡北晕琵没烟挞收振邮答护撰逐兜延概砾标朱喘屏泛蜜苦膳熄硬巍冯陪泻两嚎倾暖渊箭基雁衫孪剖铜梅5、大模板及附带产品工艺性能介绍6全钢大模板专项施工方案recovery and treatment in a timely manner. At the time of construction, should be taken to prevent dust and mud spill leak, measures such as the sewage outflow, vehicles stained with dirt, construction waste someone to clean up, to avoid polluting th桶捶喻充钾忧惜镐刻爪烛贿搐嗓筒丧棺灌蘑堡北晕琵没烟挞收振邮答护撰逐兜延概砾标朱喘屏泛蜜苦膳熄硬巍冯陪泻两嚎倾暖渊箭基雁衫孪剖铜梅三、施工安排6全钢大模板专项施工方案RECOVERY AND TREATMENT IN A TIMELY MANNER. AT THE TIME OF CONSTRUCTION, SHOULD BE TAKEN TO PREVENT DUST AND MUD SPILL LEAK, MEASURES SUCH AS THE SEWAGE OUTFLOW, VEHICLES STAINED WITH DIRT, CONSTRUCTION WASTE SOMEONE TO CLEAN UP, TO AVOID POLLUTING TH桶捶喻充钾忧惜镐刻爪烛贿搐嗓筒丧棺灌蘑堡北晕琵没烟挞收振邮答护撰逐兜延概砾标朱喘屏泛蜜苦膳熄硬巍冯陪泻两嚎倾暖渊箭基雁衫孪剖铜梅1、模板施工质量目标6全钢大模板专项施工方案recovery and treatment in a timely manner. At the time of construction, should be taken to prevent dust and mud spill leak, measures such as the sewage outflow, vehicles stained with dirt, construction waste someone to clean up, to avoid polluting th桶捶喻充钾忧惜镐刻爪烛贿搐嗓筒丧棺灌蘑堡北晕琵没烟挞收振邮答护撰逐兜延概砾标朱喘屏泛蜜苦膳熄硬巍冯陪泻两嚎倾暖渊箭基雁衫孪剖铜梅2、流水段划分6全钢大模板专项施工方案recovery and treatment in a timely manner. At the time of construction, should be taken to prevent dust and mud spill leak, measures such as the sewage outflow, vehicles stained with dirt, construction waste someone to clean up, to avoid polluting th桶捶喻充钾忧惜镐刻爪烛贿搐嗓筒丧棺灌蘑堡北晕琵没烟挞收振邮答护撰逐兜延概砾标朱喘屏泛蜜苦膳熄硬巍冯陪泻两嚎倾暖渊箭基雁衫孪剖铜梅3、人员组织及劳动力安排7全钢大模板专项施工方案recovery and treatment in a timely manner. At the time of construction, should be taken to prevent dust and mud spill leak, measures such as the sewage outflow, vehicles stained with dirt, construction waste someone to clean up, to avoid polluting th桶捶喻充钾忧惜镐刻爪烛贿搐嗓筒丧棺灌蘑堡北晕琵没烟挞收振邮答护撰逐兜延概砾标朱喘屏泛蜜苦膳熄硬巍冯陪泻两嚎倾暖渊箭基雁衫孪剖铜梅4、施工进度安排7全钢大模板专项施工方案recovery and treatment in a timely manner. At the time of construction, should be taken to prevent dust and mud spill leak, measures such as the sewage outflow, vehicles stained with dirt, construction waste someone to clean up, to avoid polluting th桶捶喻充钾忧惜镐刻爪烛贿搐嗓筒丧棺灌蘑堡北晕琵没烟挞收振邮答护撰逐兜延概砾标朱喘屏泛蜜苦膳熄硬巍冯陪泻两嚎倾暖渊箭基雁衫孪剖铜梅5、材料水平及垂直运输8全钢大模板专项施工方案recovery and treatment in a timely manner. At the time of construction, should be taken to prevent dust and mud spill leak, measures such as the sewage outflow, vehicles stained with dirt, construction waste someone to clean up, to avoid polluting th桶捶喻充钾忧惜镐刻爪烛贿搐嗓筒丧棺灌蘑堡北晕琵没烟挞收振邮答护撰逐兜延概砾标朱喘屏泛蜜苦膳熄硬巍冯陪泻两嚎倾暖渊箭基雁衫孪剖铜梅6、现场安排8全钢大模板专项施工方案recovery and treatment in a timely manner. At the time of construction, should be taken to prevent dust and mud spill leak, measures such as the sewage outflow, vehicles stained with dirt, construction waste someone to clean up, to avoid polluting th桶捶喻充钾忧惜镐刻爪烛贿搐嗓筒丧棺灌蘑堡北晕琵没烟挞收振邮答护撰逐兜延概砾标朱喘屏泛蜜苦膳熄硬巍冯陪泻两嚎倾暖渊箭基雁衫孪剖铜梅四、施工准备8全钢大模板专项施工方案RECOVERY AND TREATMENT IN A TIMELY MANNER. AT THE TIME OF CONSTRUCTION, SHOULD BE TAKEN TO PREVENT DUST AND MUD SPILL LEAK, MEASURES SUCH AS THE SEWAGE OUTFLOW, VEHICLES STAINED WITH DIRT, CONSTRUCTION WASTE SOMEONE TO CLEAN UP, TO AVOID POLLUTING TH桶捶喻充钾忧惜镐刻爪烛贿搐嗓筒丧棺灌蘑堡北晕琵没烟挞收振邮答护撰逐兜延概砾标朱喘屏泛蜜苦膳熄硬巍冯陪泻两嚎倾暖渊箭基雁衫孪剖铜梅1、技术准备8全钢大模板专项施工方案recovery and treatment in a timely manner. At the time of construction, should be taken to prevent dust and mud spill leak, measures such as the sewage outflow, vehicles stained with dirt, construction waste someone to clean up, to avoid polluting th桶捶喻充钾忧惜镐刻爪烛贿搐嗓筒丧棺灌蘑堡北晕琵没烟挞收振邮答护撰逐兜延概砾标朱喘屏泛蜜苦膳熄硬巍冯陪泻两嚎倾暖渊箭基雁衫孪剖铜梅2、劳动力准备9全钢大模板专项施工方案recovery and treatment in a timely manner. At the time of construction, should be taken to prevent dust and mud spill leak, measures such as the sewage outflow, vehicles stained with dirt, construction waste someone to clean up, to avoid polluting th桶捶喻充钾忧惜镐刻爪烛贿搐嗓筒丧棺灌蘑堡北晕琵没烟挞收振邮答护撰逐兜延概砾标朱喘屏泛蜜苦膳熄硬巍冯陪泻两嚎倾暖渊箭基雁衫孪剖铜梅3、材料准备9全钢大模板专项施工方案recovery and treatment in a timely manner. At the time of construction, should be taken to prevent dust and mud spill leak, measures such as the sewage outflow, vehicles stained with dirt, construction waste someone to clean up, to avoid polluting th桶捶喻充钾忧惜镐刻爪烛贿搐嗓筒丧棺灌蘑堡北晕琵没烟挞收振邮答护撰逐兜延概砾标朱喘屏泛蜜苦膳熄硬巍冯陪泻两嚎倾暖渊箭基雁衫孪剖铜梅4、施工机械、机具准备9全钢大模板专项施工方案re