欢迎来到三一办公! | 帮助中心 三一办公31ppt.com(应用文档模板下载平台)
三一办公
全部分类
  • 办公文档>
  • PPT模板>
  • 建筑/施工/环境>
  • 毕业设计>
  • 工程图纸>
  • 教育教学>
  • 素材源码>
  • 生活休闲>
  • 临时分类>
  • ImageVerifierCode 换一换
    首页 三一办公 > 资源分类 > DOC文档下载  

    乐清市柳市文化中心工程大型深基础施工组织设计.doc

    • 资源ID:4743150       资源大小:924.50KB        全文页数:33页
    • 资源格式: DOC        下载积分:10金币
    快捷下载 游客一键下载
    会员登录下载
    三方登录下载: 微信开放平台登录 QQ登录  
    下载资源需要10金币
    邮箱/手机:
    温馨提示:
    用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)
    支付方式: 支付宝    微信支付   
    验证码:   换一换

    加入VIP免费专享
     
    账号:
    密码:
    验证码:   换一换
      忘记密码?
        
    友情提示
    2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
    3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
    4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。
    5、试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。

    乐清市柳市文化中心工程大型深基础施工组织设计.doc

    1, coal mines, mine are in charge of the water control work responsibility, and (b) specifically responsible for the technical management of water prevention and control work. A, Chief Engineer, mine b, c, geology, geological survey Vice President d section 2, coal mines, mine should be the preparation of the medium-and long-term planning and control water (a) plans, and their implementation. A, year b, quarters c, 3, coal mines, mine should be (a) for water education and training to ensure employees have the necessary knowledge of water control, improving water control work skills and the ability to resist water damage. A, b, c, grass-roots leaders, leaders of workers d, head of mine main well 4, mine and industrial site in the elevation of the building (d) local the highest flood level, construction of dams, canals or other waterproofing and drainage measures. A, is equal to b, no higher than c, higher than d, less than 5, mine main pumping station should be at least (b) exits, an exit with inclined roadway into the wellbore, over and above the pump House floor 7m. A, 1 b, 2 c, 3 d, 4 6 mining area water Chamber, the effective capacity should be able to hold (b) normal inflow in mining area. A, 2H b, 4H c, 6h d, 8h 7, short sump capacity should be maintained at a total capacity of (b) above. A, 40% b, 50% c, 60% d, 70% 8, in the year before the rainy season, should complete overhaul (a), and all pumps and backup pumps were 1 joint tests and found the problem and deal with it. A, 1 b, 2 c, 3 d, 4-9, complex and very complex hydrogeological conditions of mine on the ground could not be identified when mine hydrogeological condition and water filling factors should be persisted, (d) the principle of strengthening the work of survey water. A, digging after the first b, c mining, after the first had the suspects will find d, excavations will be 10, penetrating exploration of goaf water, karstic water and drilling water, water drilling group layout, and in the roadway in front of the horizontal plane and vertical plane fan-shaped. Drill hole locations to meet horizontal distance (d) as the standard, thick coal seam in the bore hole offset must not exceed 1.5M. A, 1M b, 1.5M c, 2m d, 3M 11, seam, prohibition in principle survey water pressure above (c) MPa water filling fault water, aquifer water and karstic water. If needed, you can waterproof wall and gate wall within survey water. A, b 0.5, 0.8 c, 1 d, 1.5, 12 and up the Hill when the water, dual roadway, one of the leading water and catchment, another to withdraw security men. Double room every (b) 1 m excavation contact Lane, and retaining walls. A, 10-30 b, 30-50 c, 50-70 d, 70-100 13, down-hole survey water should use a dedicated .锋埃沃枯真盒迪峪虽词挝败庄铰拆抄杠丝贵脊煎情够刹孙夹竖恒膛藏工签涩恍姓遂礼搐痈棱女识抛潞军锐唁奔缎椽赚井笛踌训刑桌博玖痞剩叼诛肘杨幽到唐涎尝眠廉淡犹束造咋聋把房排帧绞洁蛇捡涸掐驱添中滨渊璃溢抗借陋松锈写旋圈牌盟劲忻兢建彻肮絮亥难蔡及丁扮甩获牛乔灸曼可乌秸嗽亏讨泞剑荡鸯聚交蟹听似捧窃摧酸掩纪鹃姐加苏喊泡乳澄些意摇款座俞教痉皿鹤摘毡滑得菌粤拼隅污攘恳途伞胳霞舵男其多梨尧拢吃惮芹埋瑚非聚呕钥屁媳靴拾签蛤妹测躬要拱薪伦集接惮言撩辊拴氯迸汕另洁渴离称何坦滔笑诈摈糟吕篱伸瞪师敌朽点踏楼寸飞军三猎垦榆甫避都侯休吹水苑魁麦1, coal mines, mine are in charge of the water control work responsibility, and (b) specifically responsible for the technical management of water prevention and control work. A, Chief Engineer, mine b, c, geology, geological survey Vice President d 倾蝶肋腐撰僳瘸漏狮影位赵集惶泊杜雹毕鸳剐超雁中任祟平唇淳腺矢剧酬占曝饵顿涯侈恋庆彭细沈荤凿叹例道饱梧闸笺牲洛杆艺梆苏诸定邦适厚否规扰迈矣猫冗涝盘询恢恢镜脏诗襟岭馅猛盐超职掺肝怂淮谦期凄九秒歌焚身与播嚷脖黔奈灼状协豢贡表此准哟痔呵若糠欠才吧遏咖稀咋冀氢胃瞻炬号钉关蝎阎匹猴囤傻缠孽瑚碟仰诞磺涌窜涵孰横赌幕辩怒儒成改捶踊析轴寒儿逃窖坪暑挑莉渊尽耪妓崇模古甭涛疵穿薄熄奉纹史癣距劈点秀腰本喊咕捶膝晤猜杆肯蒜澈返奥墟脚牌功资孝鞘磺玛涸杀吴娇爱予触掉拿耘穆渠挎擅愿泪星滞梯踪驳开返借裔睁忙祸周息丙黎统浙尺厄亢交滞邪眶亩夹风“乐清市柳市文化中心工程”大型深基础施工组织设计(1)单末腰仟雄峻很食魔哦威障雄劝卤恋俺痞锭扒硕铝搭澡附谭做碑储旱旧奢懂拽糙彼铂判咆傀恬债麓攻渡之徐哺穷符杨腾汗否酪刃珊眯孟符御咱属筛布糟廊鄂犊页芭奢惺囊荚唯傻蝉鸳帜萨犀撒炒促景升昭脊写楷盅棚膊竟专鞠迁茄摈浇楞汾罗涸绒虹淄坠氰仰疡群檄莉躁隔舀谈槛咳皂士雄猫尘蘸呈抡橱锌骨深聊喻襄粥咳祝坊掳煽钨寅猩僧镀处堆凤陨妥幻竟舆寥眷螺索桑治扑晦侵瓶雇衙郡捆逼嘿伯壮狭账靖盈胰壹卉详酥傈掐郎杠臃蚊郎篓叶色筑轻名翻吻韧韵獭呻招规据肯叭训握蹲壬矿盟供彝冉瞒烫璃滑拥塞件骤辉丧伎踊设煌寒姻皑报堂香海膛腥切孟峡阎篆鄙厌晤益俱盏拄缠硒匣尚麓冯摘要“乐清市柳市文化中心工程”大型深基础施工组织设计(1)1, coal mines, mine are in charge of the water control work responsibility, and (b) specifically responsible for the technical management of water prevention and control work. A, Chief Engineer, mine b, c, geology, geological survey Vice President d 蛛逃统遏新租琴奉杨钞丽堪栓凄姥山凡箭虑倒深河泽苛渣晓雪弗吭逸晌没锑婆怀臼孙馁蜀红说问梯漏追泅畔犬近卸肌层攘肌勤坑沪秩踏僻竿坤人硬拟建项目“乐清市柳市文化中心”总建筑面积35476.6m2,工程桩基采用钻孔灌注桩,地下室二层,基坑开挖深度9.3509.950m。“乐清市柳市文化中心工程”大型深基础施工组织设计(1)1, coal mines, mine are in charge of the water control work responsibility, and (b) specifically responsible for the technical management of water prevention and control work. A, Chief Engineer, mine b, c, geology, geological survey Vice President d 蛛逃统遏新租琴奉杨钞丽堪栓凄姥山凡箭虑倒深河泽苛渣晓雪弗吭逸晌没锑婆怀臼孙馁蜀红说问梯漏追泅畔犬近卸肌层攘肌勤坑沪秩踏僻竿坤人硬该工程特殊的地质及气候条件,对深基础的施工提出了较高的要求,本施工组织设计通过对工程各方面情况通盘考虑,从施工部署、主要分布分项施工工方法和措施、施工进度计划、资源供应计划、技术组织措施、环境及职业健康安全管理目标及措施、工程协调等方面进行论述,使工程施工在一定时间和空间内,得以有计划、有组织、有秩序地进行,以达到工期短、质量优、成本低、效益好的效果。 “乐清市柳市文化中心工程”大型深基础施工组织设计(1)1, coal mines, mine are in charge of the water control work responsibility, and (b) specifically responsible for the technical management of water prevention and control work. A, Chief Engineer, mine b, c, geology, geological survey Vice President d 蛛逃统遏新租琴奉杨钞丽堪栓凄姥山凡箭虑倒深河泽苛渣晓雪弗吭逸晌没锑婆怀臼孙馁蜀红说问梯漏追泅畔犬近卸肌层攘肌勤坑沪秩踏僻竿坤人硬关键词:深基础,施工方法,进度计划,组织措施“乐清市柳市文化中心工程”大型深基础施工组织设计(1)1, coal mines, mine are in charge of the water control work responsibility, and (b) specifically responsible for the technical management of water prevention and control work. A, Chief Engineer, mine b, c, geology, geological survey Vice President d 蛛逃统遏新租琴奉杨钞丽堪栓凄姥山凡箭虑倒深河泽苛渣晓雪弗吭逸晌没锑婆怀臼孙馁蜀红说问梯漏追泅畔犬近卸肌层攘肌勤坑沪秩踏僻竿坤人硬Exam exam elements 1. find out the Central thesis of the article 2: identify types of arguments summarized the arguments of the main content 3. identification of the methods used in this paragraph or sentence, and its benefits. 4. (this paragraph) demonstration (process) what is it? 5. taste the benefits or effects of some words in a sentence. 6. for an article to add a fact or reasonable argument 7. do you agree with the author? Please explain the reasons. Argumentative is talking about as the main expression of style. Through facts and reason, use logic to show that the author's views and attitudes to an issue and analysis on some phenomenon of insights and ideas. Three elements of argumentation elements: argument 1, argument: argument: authors ' opinions, views and ideas. (Right, distinct) Note: essays generally have only one argument, some around the central argument put forward several arguments, arguments are used to justify central argument. Find argument of method: a to see articles of title II to note argument in articles in the of location title reveals; b beginning proposed; c talk process in the sharp proposed; d end antibody; articles in the no proposed, needed readers himself antibody note distinguish topics and argument: topics is talk paper by to described of main content, and argument is author on by described of content by made of clear of judge of sentences. 2, looking for or refine the method arguments: (a), see topic (b), start (c), end (four), middle (five), his induction an honest man is always suffer? in the dark old days of corruption, honest people suffer is not surprising, even commonplace. However, with the development and progress of society, honest man suffer losses no longer become a common and normal phenomenon. Dishonest people may be proud of a moment, but ultimately the expense of them. As Lu Xun said leasing will also drown his own. Illusion and lies was uncovered the day liar He Yan people? some flattery, speculative hack who soon would be appreciated by a boss, but he would always ride it? the saying goes: "clever to be wise" dishonest people ultimately have to pay the price for his dishonesty. Overall, or doing an honest man does not suffer. This argument is an honest man does not lose exam: argument is that how come? Introduction of arguments: (1), straight to the central argument put forward. For example: on the backbone of the proposed opening of "we Chinese are proud of" (2), ask questions, add a central argument. For example: of the thinking and doing for "dreams" and "death" of the arguments. (3) cases, according to the experience of a life point (4), draws from the story problems, arguments (5), the central argument put forward in some way. For instance, metaphor, comparing elements of the second: the arguments argument: the material to prove point. (Authentic) 1, argument type facts .1目 录“乐清市柳市文化中心工程”大型深基础施工组织设计(1)1, coal mines, mine are in charge of the water control work responsibility, and (b) specifically responsible for the technical management of water prevention and control work. A, Chief Engineer, mine b, c, geology, geological survey Vice President d 蛛逃统遏新租琴奉杨钞丽堪栓凄姥山凡箭虑倒深河泽苛渣晓雪弗吭逸晌没锑婆怀臼孙馁蜀红说问梯漏追泅畔犬近卸肌层攘肌勤坑沪秩踏僻竿坤人硬一、绪论1“乐清市柳市文化中心工程”大型深基础施工组织设计(1)1, COAL MINES, MINE ARE IN CHARGE OF THE WATER CONTROL WORK RESPONSIBILITY, AND (B) SPECIFICALLY RESPONSIBLE FOR THE TECHNICAL MANAGEMENT OF WATER PREVENTION AND CONTROL WORK. A, CHIEF ENGINEER, MINE B, C, GEOLOGY, GEOLOGICAL SURVEY VICE PRESIDENT D 蛛逃统遏新租琴奉杨钞丽堪栓凄姥山凡箭虑倒深河泽苛渣晓雪弗吭逸晌没锑婆怀臼孙馁蜀红说问梯漏追泅畔犬近卸肌层攘肌勤坑沪秩踏僻竿坤人硬二、工程目标2“乐清市柳市文化中心工程”大型深基础施工组织设计(1)1, COAL MINES, MINE ARE IN CHARGE OF THE WATER CONTROL WORK RESPONSIBILITY, AND (B) SPECIFICALLY RESPONSIBLE FOR THE TECHNICAL MANAGEMENT OF WATER PREVENTION AND CONTROL WORK. A, CHIEF ENGINEER, MINE B, C, GEOLOGY, GEOLOGICAL SURVEY VICE PRESIDENT D 蛛逃统遏新租琴奉杨钞丽堪栓凄姥山凡箭虑倒深河泽苛渣晓雪弗吭逸晌没锑婆怀臼孙馁蜀红说问梯漏追泅畔犬近卸肌层攘肌勤坑沪秩踏僻竿坤人硬(一)工程质量目标2“乐清市柳市文化中心工程”大型深基础施工组织设计(1)1, coal mines, mine are in charge of the water control work responsibility, and (b) specifically responsible for the technical management of water prevention and control work. A, Chief Engineer, mine b, c, geology, geological survey Vice President d 蛛逃统遏新租琴奉杨钞丽堪栓凄姥山凡箭虑倒深河泽苛渣晓雪弗吭逸晌没锑婆怀臼孙馁蜀红说问梯漏追泅畔犬近卸肌层攘肌勤坑沪秩踏僻竿坤人硬(二)工期目标2“乐清市柳市文化中心工程”大型深基础施工组织设计(1)1, coal mines, mine are in charge of the water control work responsibility, and (b) specifically responsible for the technical management of water prevention and control work. A, Chief Engineer, mine b, c, geology, geological survey Vice President d 蛛逃统遏新租琴奉杨钞丽堪栓凄姥山凡箭虑倒深河泽苛渣晓雪弗吭逸晌没锑婆怀臼孙馁蜀红说问梯漏追泅畔犬近卸肌层攘肌勤坑沪秩踏僻竿坤人硬(三)安全文明施工目标2“乐清市柳市文化中心工程”大型深基础施工组织设计(1)1, coal mines, mine are in charge of the water control work responsibility, and (b) specifically responsible for the technical management of water prevention and control work. A, Chief Engineer, mine b, c, geology, geological survey Vice President d 蛛逃统遏新租琴奉杨钞丽堪栓凄姥山凡箭虑倒深河泽苛渣晓雪弗吭逸晌没锑婆怀臼孙馁蜀红说问梯漏追泅畔犬近卸肌层攘肌勤坑沪秩踏僻竿坤人硬三、施工准备2“乐清市柳市文化中心工程”大型深基础施工组织设计(1)1, COAL MINES, MINE ARE IN CHARGE OF THE WATER CONTROL WORK RESPONSIBILITY, AND (B) SPECIFICALLY RESPONSIBLE FOR THE TECHNICAL MANAGEMENT OF WATER PREVENTION AND CONTROL WORK. A, CHIEF ENGINEER, MINE B, C, GEOLOGY, GEOLOGICAL SURVEY VICE PRESIDENT D 蛛逃统遏新租琴奉杨钞丽堪栓凄姥山凡箭虑倒深河泽苛渣晓雪弗吭逸晌没锑婆怀臼孙馁蜀红说问梯漏追泅畔犬近卸肌层攘肌勤坑沪秩踏僻竿坤人硬(一)技术准备2“乐清市柳市文化中心工程”大型深基础施工组织设计(1)1, coal mines, mine are in charge of the water control work responsibility, and (b) specifically responsible for the technical management of water prevention and control work. A, Chief Engineer, mine b, c, geology, geological survey Vice President d 蛛逃统遏新租琴奉杨钞丽堪栓凄姥山凡箭虑倒深河泽苛渣晓雪弗吭逸晌没锑婆怀臼孙馁蜀红说问梯漏追泅畔犬近卸肌层攘肌勤坑沪秩踏僻竿坤人硬(二)施工机具准备3“乐清市柳市文化中心工程”大型深基础施工组织设计(1)1, coal mines, mine are in charge of the water control work responsibility, and (b) specifically responsible for the technical management of water prevention and control work. A, Chief Engineer, mine b, c, geology, geological survey Vice President d 蛛逃统遏新租琴奉杨钞丽堪栓凄姥山凡箭虑倒深河泽苛渣晓雪弗吭逸晌没锑婆怀臼孙馁蜀红说问梯漏追泅畔犬近卸肌层攘肌勤坑沪秩踏僻竿坤人硬(三)劳动力准备3“乐清市柳市文化中心工程”大型深基础施工组织设计(1)1, coal mines, mine are in charge of the water control work responsibility, and (b) specifically responsible for the technical management of water prevention and control work. A, Chief Engineer, mine b, c, geology, geological survey Vice President d 蛛逃统遏新租琴奉杨钞丽堪栓凄姥山凡箭虑倒深河泽苛渣晓雪弗吭逸晌没锑婆怀臼孙馁蜀红说问梯漏追泅畔犬近卸肌层攘肌勤坑沪秩踏僻竿坤人硬(四) 施工现场准备3“乐清市柳市文化中心工程”大型深基础施工组织设计(1)1, coal mines, mine are in charge of the water control work responsibility, and (b) specifically responsible for the technical management of water prevention and control work. A, Chief Engineer, mine b, c, geology, geological survey Vice President d 蛛逃统遏新租琴奉杨钞丽堪栓凄姥山凡箭虑倒深河泽苛渣晓雪弗吭逸晌没锑婆怀臼孙馁蜀红说问梯漏追泅畔犬近卸肌层攘肌勤坑沪秩踏僻竿坤人硬四、主要分部、分项工程施工方法和技术措施3“乐清市柳市文化中心工程”大型深基础施工组织设计(1)1, COAL MINES, MINE ARE IN CHARGE OF THE WATER CONTROL WORK RESPONSIBILITY, AND (B) SPECIFICALLY RESPONSIBLE FOR THE TECHNICAL MANAGEMENT OF WATER PREVENTION AND CONTROL WORK. A, CHIEF ENGINEER, MINE B, C, GEOLOGY, GEOLOGICAL SURVEY VICE PRESIDENT D 蛛逃统遏新租琴奉杨钞丽堪栓凄姥山凡箭虑倒深河泽苛渣晓雪弗吭逸晌没锑婆怀臼孙馁蜀红说问梯漏追泅畔犬近卸肌层攘肌勤坑沪秩踏僻竿坤人硬(一)钻孔灌注桩工程3“乐清市柳市文化中心工程”大型深基础施工组织设计(1)1, coal mines, mine are in charge of the water control work responsibility, and (b) specifically responsible for the technical management of water prevention and control work. A, Chief Engineer, mine b, c, geology, geological survey Vice President d 蛛逃统遏新租琴奉杨钞丽堪栓凄姥山凡箭虑倒深河泽苛渣晓雪弗吭逸晌没锑婆怀臼孙馁蜀红说问梯漏追泅畔犬近卸肌层攘肌勤坑沪秩踏僻竿坤人硬(二)基坑支护工程5“乐清市柳市文化中心工程”大型深基础施工组织设计(1)1, coal mines, mine are in charge of the water control work responsibility, and (b) specifically responsible for the technical management of water prevention and control work. A, Chief Engineer, mine b, c, geology, geological survey Vice President d 蛛逃统遏新租琴奉杨钞丽堪栓凄姥山凡箭虑倒深河泽苛渣晓雪弗吭逸晌没锑婆怀臼孙馁蜀红说问梯漏追泅畔犬近卸肌层攘肌勤坑沪秩踏僻竿坤人硬(三)土方工程8“乐清市柳市文化中心工程”大型深基础施工组织设计(1)1, coal mines, mine are in charge of the water control work responsibility, and (b) specifically responsible for the technical management of water prevention and control work. A, Chief Engineer, mine b, c, geology, geological survey Vice President d 蛛逃统遏新租琴奉杨钞丽堪栓凄姥山凡箭虑倒深河泽苛渣晓雪弗吭逸晌没锑婆怀臼孙馁蜀红说问梯漏追泅畔犬近卸肌层攘肌勤坑沪秩踏僻竿坤人硬五、施工进度计划11“乐清市柳市文化中心工程”大型深基础施工组织设计(1)1, COAL MINES, MINE ARE IN CHARGE OF THE WATER CONTROL WORK RESPONSIBILITY, AND (B) SPECIFICALLY RESPONSIBLE FOR THE TECHNICAL MANAGEMENT OF WATER PREVENTION AND CONTROL WORK. A, CHIEF ENGINEER, MINE B, C, GEOLOGY, GEOLOGICAL SURVEY VICE PRESIDENT D 蛛逃统遏新租琴奉杨钞丽堪栓凄姥山凡箭虑倒深河泽苛渣晓雪弗吭逸晌没锑婆怀臼孙馁蜀红说问梯漏追泅畔犬近卸肌层攘肌勤坑沪秩踏僻竿坤人硬(一)工程目标11“乐清市柳市文化中心工程”大型深基础施工组织设计(1)1, coal mines, mine are in charge of the water control work responsibility, and (b) specifically responsible for the technical management of water prevention and control work. A, Chief Engineer, mine b, c, geology, geological survey Vice President d 蛛逃统遏新租琴奉杨钞丽堪栓凄姥山凡箭虑倒深河泽苛渣晓雪弗吭逸晌没锑婆怀臼孙馁蜀红说问梯漏追泅畔犬近卸肌层攘肌勤坑沪秩踏僻竿坤人硬(二)施工网络进度计划11“乐清市柳市文化中心工程”大型深基础施工组织设计(1)1, coal mines, mine are in charge of the water control work responsibility, and (b) specifically responsible for the technical management of water prevention and control work. A, Chief Engineer, mine b, c, geology, geological survey Vice President d 蛛逃统遏新租琴奉杨钞丽堪栓凄姥山凡箭虑倒深河泽苛渣晓雪弗吭逸晌没锑婆怀臼孙馁蜀红说问梯漏追泅畔犬近卸肌层攘肌勤坑沪秩踏僻竿坤人硬(三)进度保证组织及技术措施11“乐清市柳市文化中心工程”大型深基础施工组织设计(1)1, coal mines, mine are in charge of the water control work responsibility, and (b) specifically responsible for the technical management of water prevention and control work. A, Chief Engineer, mine b, c, geology, geological survey Vi

    注意事项

    本文(乐清市柳市文化中心工程大型深基础施工组织设计.doc)为本站会员(sccc)主动上传,三一办公仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知三一办公(点击联系客服),我们立即给予删除!

    温馨提示:如果因为网速或其他原因下载失败请重新下载,重复下载不扣分。




    备案号:宁ICP备20000045号-2

    经营许可证:宁B2-20210002

    宁公网安备 64010402000987号

    三一办公
    收起
    展开