NMR loading procedure核磁共振加载程序文档资料.ppt
-
资源ID:4674075
资源大小:6.06MB
全文页数:14页
- 资源格式: PPT
下载积分:10金币
友情提示
2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。
5、试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。
|
NMR loading procedure核磁共振加载程序文档资料.ppt
,load button needs to be held to continually supply air to the sample chamberIf the air is not on the sample will drop into the chamber and break!Very bad!,When loading sample:,Check the depth of the sample by placing the tube+spinner into the depth gaugePress down lightly on the tube until you feel resistanceThis ensures that the sample is at the correct depth in the sample chamber,Insert the sample into the spinner while holding down the“sample retrieval/load button”(air line button),Release tube,then release the air line button.The sample+spinner will slowly sink down into the sample chamber.,To unload sample:,Press the air line buttonThe sample will float to the top of the sample chamberGive the spinner to the next person.If no one is waiting for the NMR,place the dummy sample into the sample chamber,