欢迎来到三一办公! | 帮助中心 三一办公31ppt.com(应用文档模板下载平台)
三一办公
全部分类
  • 办公文档>
  • PPT模板>
  • 建筑/施工/环境>
  • 毕业设计>
  • 工程图纸>
  • 教育教学>
  • 素材源码>
  • 生活休闲>
  • 临时分类>
  • ImageVerifierCode 换一换
    首页 三一办公 > 资源分类 > DOC文档下载  

    电气技术员英文自我评价.doc

    • 资源ID:4567581       资源大小:49KB        全文页数:22页
    • 资源格式: DOC        下载积分:10金币
    快捷下载 游客一键下载
    会员登录下载
    三方登录下载: 微信开放平台登录 QQ登录  
    下载资源需要10金币
    邮箱/手机:
    温馨提示:
    用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)
    支付方式: 支付宝    微信支付   
    验证码:   换一换

    加入VIP免费专享
     
    账号:
    密码:
    验证码:   换一换
      忘记密码?
        
    友情提示
    2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
    3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
    4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。
    5、试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。

    电气技术员英文自我评价.doc

    电气技术员英文自我评价电气技术员英文自我评价篇一This year is coming to an end, in order to be able to work better in the next year, sum up experience, adhere to the advantages and correct deficiencies, according to company requirements, summarized as follows: in a year's work, through the summary, although made some progress, A lot of shortcomings and deficiencies. As an electrical and mechanical workshop electrical technicians, in the production of work is only constantly sum up the lessons learned and found that in order to make their own faster progress.First, in-depth, solid workAs an electrical technician in the electromechanical workshop of the coal preparation plant, my main responsibility is to be responsible for the management of electrical technology in the electromechanical workshop, to work out the maintenance arrangement of the electrical equipment and the corresponding management rules and technical operation measures, organize the staff to do well in the business training; Often in-depth site, continue to promote new technology and new technologies.Over the past year, I have been working hard, fulfilling my duties seriously, constantly improving myself from the technical and management level, and have made great achievements in all aspects. I work in the workshop with the same below the master of the workers, equipment problems encountered actively to the scene to deal with failures, eliminate hidden dangers. Insist on the scene every day to check the operation of equipment, high and low voltage equipment for power supply and distribution; master production process of coal preparation to learn the principle of centralized control; understand the control signal routing layout, information transmission. Now many aspects have made great progress, for example: the communication 2 × × station system, the elevator running system, automatic control system concentrator, filter closed-loop control system, King configuration system, pressurized filter system, the main Plant and new plant coal washing system, from shallow to deep grasp the basic control structure and principle of the system. So I have a very thorough understanding of the production process of coal washing, and have learned the knowledge and the actual production of effective combination for the future to better theory with practice, better promote the production, better reduce the workers The master of the labor intensity, more effective to improve labor productivity, for enterprises and the community to create more benefits laid a solid foundation. Other aspects of meticulous improvement and completion of electrical safety regulations and measures to seriously monitor the implementation of the annual maintenance in the XX 11, through the replacement and overhaul of the transformer, but also learned a lot of things usually do not see, so I coal washing Plant electrical equipment with a deeper understanding.Material plan to provide timely, comprehensive, accurate spare parts parameters is the guarantee of normal operation of the equipment, I am responsible for the electrical equipment materials plan to report work, at work, I ran the scene, check the problem, so that spare parts can be more comprehensive and reliable , To avoid the lack of spare parts and delay the status of production. And through the low-voltage power distribution room to find the problem, and other technical staff together proposed the transformation of low-voltage distribution room equipment plan, and through the production of selection, use, the basic solution to the production of spare parts for the purchase of passive, and Resulting in equipment failure problems. Low voltage power distribution room of the new plant are used in the domestic production of electrical components, AC contactor with the use of materials often aging, poor access to auxiliary early, the signal is not normal and so on, after the decision to use imported Siemens contactor to transform it, So far, basically solved the problem caused by the contactor accident occurred, reducing the accident rate, a substantial increase in the driving rate, to ensure the normal production of coal washing.In the work, the first is strict on their own, do not allow the staff to do, their firm quit, for the field workers to set an example. In the implementation of the implementation of procedural measures, the strict on-site, the work of a number of measures do not quit. The illegal behavior of workers and non-standard behavior resolutely stop. In the production of security incidents and accidents affecting the production of serious organizational analysis, do not go through the motions, accountability does not take the form, so that the implementation of responsibility, education, alert everyone's purpose. The second is to consider the work of small, so that the overall balance, that is, there are safety education and specific work arrangements, taking into account the production and taking into account the electrical and mechanical and business, so that the face of all non-leakage control, the work done a layout, , There are checks. Third, pragmatic, through the daily study, and constantly improve their theoretical level, operational level, practical experience and personal qualities. Fourth, a solid work, the work does not remain on the surface, not afraid of difficulties, not afraid of wounding, truth-seeking results, and further improve their management level.Second, join the technical innovation, never in innovationIn the work, seriously to the old comrades to learn, and constantly improve themselves, and use other time, learn more new knowledge. And actively participate in the plant plc program control system to the transformation, and achieved certain results, including the following: First, seriously involved in the flotation automation system, and basically mastered the flotation automatic control system, mastered the The new control system, learned to solve and deal with problems in ways and methods; followed by the thickener automatic control system transformation, the OMRON plc with updated understanding; Third, the design of the plant ash measurement system configuration screen Designed to make better use of gray instrument in the production, to make the configuration screen, you can use the unit time of the various instantaneous ash, the unit time to calculate the average ash to solve the ash analyzer average ash value The design and transformation of the chain of 302 chain-link protection procedures, and in the configuration screen to add 302 chain-link chain protection alarm, reducing the chain once the parking chain will be mistaken for a broken chain protector Motion problems, and solve the previous chain protection device action, the alarm can also start the car issue, reducing the electrician to determine the fault and solve the problem of processing time; Fifth, add the belt belt ash tester fault alarm device, the use of Ash measured ash content of the actual value, compared with the set percentage, when the ash over 12.00ash, that is audible and visual alarm (now only the optical signal, not the use of sound alarm), the other is now on the ash measuring instrument Adjustments are being made to meet actual production requirements. So that the driver in accordance with the production needs of the timely adjustment of ash to avoid excessive ash caused unnecessary losses.Third, shortcomings and shortcomingsAs the time to the coal preparation plant is still small, so in many aspects of technology and experience are inadequate, less problems encountered, the problem can not be handled handy. In the future work, we must adhere to run more than the scene, dare to find, solve and deal with problems encountered problems, never escape, humbly to the experienced veteran workers, the old master learning; In addition, the timely organization of lessons learned, Of the problem, do not understand the problems are recorded, and seize the time to resolve the deal, do a good job in the record in order to encounter the same problem in the future, can be faster to deal with the organization. Serious study of management methods and methods to make their own production organization in the future, to better complete the leadership of the work and tasks assigned. In previous work, consider the problem is often not comprehensive, do not consider the consequences of doing things, not only delayed their own, but also affected the others, in the future work and study, must strengthen the study to make themselves more quickly mature.Fourth, self-evaluationIn short, through a year of productive labor and technical learning, I thought and technically have been greatly improved and progress. That is, broaden the horizons, a wealth of knowledge, but also improve their management and operational level, the most important thing is for their own work in the future, to better completion of the task to lay a good foundation.In the political and ideological aspects have also made great progress, I actively move closer to the party organization, through the cadre study, understanding of the social development of the new situation and new trends, deepened understanding and understanding of the Communist Party of China in the spirit of the 17th CPC National Congress Under the guidance of more efforts to achieve individual ideological progress and leap in the struggle more than.Summed up the work of the past year, that there are many problems and shortcomings. In the future work, only the continuous careful summary, found deficiencies, correct shortcomings, individuals can get faster progress. I think I work well.电气技术员英文自我评价篇二Time flies, blink of an eye to the company has been a year, feeling a lot, a lot of harvest. Into the * City * Electrical Equipment Co., Ltd., for me is a good opportunity for development, is also a good exercise and enhance their ability to various aspects of the opportunity. In this first special thanks to the leadership and colleagues to give me the strong support, care and help so that I can quickly adapt to the company's management system, and strive to do their jobs. Into the company, I seriously understand the company's development profile, learning the company's rules and regulations, familiar with the company's processes. At the same time, it is truly feel positive, inspiring corporate culture, so I benefited from. Now I work over the past year summarized as follows:First, solid workI entered the workshop from the sheet metal began to do chest box shell, can be said that the sheet metal shop is my first impression of the company. Have to say, in the sheet metal workshop a month, the master who gave me a good image, so I benefited.Last September, I went into the assembly workshop internship, I deeply feel my colleagues work diligently, and strive to perfect the spirit. In the assembly workshop, I focus on access to relevant information, manuals, drawings and instructions to understand the operation of electrical equipment and principles, learning equipment layout, wiring, do row, the second line. Into the assembly plant began, I know that their burden is very heavy, I always remember this sentence to give others a bowl of water, they will have a bucket of water. Because I know that in order to become a qualified technician is not an easy task, as a technician not only to be able to deal with the requirements of customers, more importantly, to be able to solve the problems on the scene, on-site equipment operation Situation to be aware of.In May this year, following the installation team to Panzhihua, I seize the time familiar with the drawings, construction plans, drawings, the construction site management, acceptance and other requirements. In the face of difficulties and problems, take the initiative to consult the leadership, and design units and construction units to communicate and coordinate relations, in order to smooth the work of the project. The actual work, due to some local civil engineering changes and drawings, resulting in the wall without leaving holes, bridge and pipe unreasonable, need to open or re-layout to take the line, increase the workload, and after the leadership communication has been resolved. Therefore, in future work, I will pay attention to relevant knowledge, so that their own from the civil, decoration, budget and other aspects of strengthening, good external coordination, and actively design units, construction units and government departments to communicate, to develop a good overall planning, Where the interests of the main companies.Second, efforts to learn and progressIn the work, serious study, and constantly improve themselves, and the use of other time, learn more advanced knowledge. From the simplest manufacturing standards start to do a complete set of equipment, where both their own studious, but also inseparable from the workshop colleagues Q & A FAQ. From the old engineer who I not only learned a lot, but also gave me a lot of sentiment. For the first time I do equipment, colleagues not only help me carefully but also patiently explained to me, very grateful to colleagues for their help, but also in our culture so that the company better work with sufficient confidence.Third, shortcomings and shortcomingsAs I participated in the work soon, so in many ways the technology and experience are inadequate, the problems encountered, the problem can not be handled handy. In the future work, we must dare to solve and deal with problems encountered problems, never escape, humbly to the experienced technicians, the old workers to learn; In addition, the timely organization of lessons learned, the existence of doubt, do not understand the aspects are recorded Down, and seize the time to solve the problem, make a record, so that later encountered the same thing, can solve the problem faster. Conscientiously learn all kinds of knowledge, so that their future work, to better complete the leadership of the work and tasks assigned to make themselves more mature faster.Fourth, self-evaluationAlthough I participated in the production of labor and technology study time is only one year, but in the ideological and technical have been greatly improved and progress. Not only enrich the knowledge, but also to improve their management and business level, the most important thing is for their own work in the future, to better completion of the task to lay a good foundation.Summing up the work of the past year, both achievements and deficiencies. In the future work, only continue to seriously sum up, found inadequate, and strive to correct, in order to get faster progress in order to better serve the company, realize the value of life.电气技术员英文自我评价

    注意事项

    本文(电气技术员英文自我评价.doc)为本站会员(sccc)主动上传,三一办公仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知三一办公(点击联系客服),我们立即给予删除!

    温馨提示:如果因为网速或其他原因下载失败请重新下载,重复下载不扣分。




    备案号:宁ICP备20000045号-2

    经营许可证:宁B2-20210002

    宁公网安备 64010402000987号

    三一办公
    收起
    展开