欢迎来到三一办公! | 帮助中心 三一办公31ppt.com(应用文档模板下载平台)
三一办公
全部分类
  • 办公文档>
  • PPT模板>
  • 建筑/施工/环境>
  • 毕业设计>
  • 工程图纸>
  • 教育教学>
  • 素材源码>
  • 生活休闲>
  • 临时分类>
  • ImageVerifierCode 换一换
    首页 三一办公 > 资源分类 > DOC文档下载  

    On the relationship between Staff Training and the Quality of Customer Service.doc

    • 资源ID:3024002       资源大小:487.50KB        全文页数:63页
    • 资源格式: DOC        下载积分:8金币
    快捷下载 游客一键下载
    会员登录下载
    三方登录下载: 微信开放平台登录 QQ登录  
    下载资源需要8金币
    邮箱/手机:
    温馨提示:
    用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)
    支付方式: 支付宝    微信支付   
    验证码:   换一换

    加入VIP免费专享
     
    账号:
    密码:
    验证码:   换一换
      忘记密码?
        
    友情提示
    2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
    3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
    4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。
    5、试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。

    On the relationship between Staff Training and the Quality of Customer Service.doc

    On the relationship between Staff Training and the Quality of Customer Service英语专业必修课程作业要求 (专升本课程)Course:Practical Business Project DesignAssignment:02 (Units 6-10)Assignment title:Data Collection/Appendices, Project Implementation, Discussion, Conclusion, Introduction, Abstracts, and the first draft of the whole paperBased on the project design you have completed in the previous stage, you are asked to implement your project and then compose the core parts of your BA degree paper in this assignment. Please refer to units 6-10 of Practical Business Project Design for guidance and support to this assignment. The information in brackets indicate the specific unit you can refer to. There are SIX parts in this assignment.Part One Data Collection/Appendices (Unit 6>Activity 2)DIRECTIONS FOR STUDENTS:In your online courseware, two categories of forms/methods are introduced to collect primary data: l Observation and logsl Surveys and interviewsPlease present the types of forms you plan to use to collect data in this project, which are going to be attached as appendices in your BA degree paper. You should give a title to each of the form, such as “Focus Group Discussion Outline”, “Training Evaluation Form” and “Questionnaire”. But first, please restate your project objective and hypothesis to which your tutor can refer while they evaluate the types of data you are going to collect.Project objective: My project goal is to improve the overall performance of our staff so as to better satisfy our customers needs for qualified and conscientious staff. Therefore, the objective of my project is to carry out a two weeks training course for new staffs on the key topics as follows:Increasing professionalism on the frontline Project hypothesis: Based on the study of theories and measures related to customer service, the thesis comes up with a hypothesis for the project. It is hypothesized that a well trained, not merely a courteous, workforce will be the best tool to ensure high-quality customer service. OJT (on the job training) is one means by which to achieve that end.Insert your description after the prompts in the space below.I designed an adequate amount of activities to complete my project in two month. In regard of trainees, I plan the following activities:Arrange trainer to take a discussion with trainees about their needs and wantsPrepare the training material for all the traineesl Make a evaluation of the whole trainingIn regard of trainer, I plan the following activities:l Decide on the trainer(choose from our qualified staff or invite professional trainer from training company), the training time as well as the training placel Interview trainer to judge his or her qualificationl Discuss with trainer about the training material and training contentsl Pre-assessment of traineesl Prepare the field trip behavior modeling case study role-play etc. to support the OJT.l Invite company manager or experienced staff to deliver lectures during the training coursel Arrange evening activities which make the course more attractive and enable trainees better understood the training objectives.l Post-assessment of traineesIn regard of training facilities, I plan to do the following things:l Make reservation of the classroom and the relevant equipmentl Arrange the hotel and meals as well as the transfer coachl Negotiate the price with hotel and coach supplierIn regard of monitoring and evaluation, I plan to do as follows: l Draft out the flow-chart of activities with timings.l Work out The Project Framework.l Keep a Project Master File.l Set out evaluation criteria.l Collect data/results from trainees feedback.l Interview customers l Take a follow-up survey among the trainees one month laterAll the above activities will be finished in five steps:The first step is to get budget approval. The second step is to decide on the trainer, training material and other relevant work.The third step is to make arrangement of the training facilities.The fourth step is to take on the training course and field practice.The fifth step is to do training evaluation.Form I:Activity Flow chart with time-scaleWEEK 1WEEK 2WEEK 3WEEK 4WEEK 5Draft out the training plan and apply for the budgetGet budget approval from the head officeInterview trainerDecide on thetraining materialandPre-assessment of trainees Prepare the training material for all the traineesArrange discussion to get trainees needs and wants Hand over and take over of works between trainees and the rest of staffsDecide on training time and training placeReserve the classroom, hotel and coachBrief all staffs about the training planWEEK 6Start the training courseWEEK 7Training course continuesWEEK 8End of training and Make a evaluation of the whole training Invite company manager or experienced staff to deliver lectures Arrange vening activitiesarrange trainees to follow up a three days tourA follow-up surveypost-assessment of traineesFOR TUTORS:You are required to provide between-text comments on the students writing by using the “Edit” function or a contrasting font color to highlight your comments or suggestions. Please tick in the proper cell and write your overall comments in the box of “Tutors Comments” below.评价指标Assessment Criteria评估(Acceptable/Revise)请打勾进行评估()合格需修改用了不同的工具来采集数据。A variety of tools are used to collect data.通过这些表格/工具等可获取充分的数据。Sufficient results can be obtained by using these forms.表格中的题项或问题设计严谨,有助于检验项目假设。The items or questions in the forms are well-designed to help verify the credibility of the project hypothesis.语言正确、准确,无歧义。Each form is expressed in clear, accurate and unambiguous English.Tutors Comments:Part Two Data Presentation (units 6 & 9)DIRECTIONS FOR STUDENTS:After having implemented your project and analyzed the data collected, you are now asked to describe in detail what you have found. You should describe your findings with the support of necessary graphs, charts, tables, etc. This important part will later on be presented in your BA degree paper under the heading such as “Data Presentation” or “Project Findings”.Write your text under the following blank space according to the above areas. (Suggested length: no fewer than 800 words.)I categorize the data (results) collected for the project in four groups and found out that, generally speaking, our staffs have gotten a significant improvement in their work performance after the implementation.The previous problem analysis: Before the project was taken, we carried out an activity of new employee performance appraisal.These appraisal showed that our new staffs was short of the capability in the aspect of work quality, efficiency, and teamwork.Records of the implementation of the project as shown above, i.e. the Project Checklist, Project Managers Diary, and Project Members Daily Feedback Form. These records showed the activities we had taken from the beginning to the end of project. Besides, members comment and feedback towards each activity is provided as well.Project Members Daily Feedback FormDate: July7th , 2008 Name: HR staff Lean Role: Logistics What activities are you involved in?1. Project team analyzing the needs and wants for the training project and establishing training focuses.2. Presenting plan for facilities support of the project.3. Making reservation for hotel, meal and transfer coach.4. Negotiating price with hotel sales.What are the results of the activities?1. The project team has decided upon the projects training focuses: staffs knowledge, attitudes, communication skills, teamwork, etc.2. More additional training activities were suggested by project member in order to make the course attractive and enable trainees better understand the training objective, such as: evening activities, inviting general manager to deliver lectures, field practices etc.3. I have presented a plan for facilities support on issues relating to the location of the training course, the price of hotel accommodation and other facilities to be used for the project such as BARCO, video machine, laptop etc.What are comments and suggestions?1. I have a better view about our current business situation.2. We have the strong ability (budget and personnel) to support this training project.3. Our weak points are time problems: two weeks is a little short for new staff training, but our daily business will not allow us to extend the time.I suggest the training should be made regularly according to levels of staff, not only the new staff but also the senior staff because the market is changing so quick, we have to recruit all staff the new knowledge and concept to meet the competition.Project progressive checklistTime-scaleActivitiesResultsCommentsWeek 1-2l Get budget approvalThe head office gave my training plan a highly support which is make me more confident to do it well.Week 3l Decide on the trainer, time as well as the training placel Interview trainer to judge his or her qualificationInformation about the location of the training course, training time and the trainer.Choose the qualified and professional trainer as we need.Week 4l Arrange trainer to take a discussion with trainees about their needs and wantsl Discuss with trainer about the training material and training contentsl Pre-assessment of traineesl Make reservation of the classroom and the relevant equipmentl Arrange the hotel and meals as well as the transfer coachGot information of trainees needs and wants which help the trainer and our responsible staff to design the training course.Decided on the material to be used for the training.Collected the information or data for further evaluation.Got confirmation of relevant arrangement for the training in advance.Week 51. Brief all staffs about the training plan as well as the work assignment during the training period2. Prepare the training material for all the trainees3. Hand over and take over of works between trainees and the rest of staffsLet all of my staffs make a good preparation for the training.In order to keep the daily work going smoothly.The trainees feedback of the course well illustrated the success of our training project. All the trainees are satisfied with the course design and learning results. 64% trainees strongly agreed that the instructor style, methods and pace help them to learn. 100% trainees agreed (59% strongly agreed) the skill (concepts) taught were highly relevant to the demands of their job/role. This feedback also shows no one dissatisfied with the course.FOR TUTORS:You are required to provide between-text comments on the students writing by using the “Edit” function or a contrasting font color to highlight your comments or suggestions. Please tick in the proper cell and write your overall comments in the box of “Tutors Comments” below.评价指标Assessment Criteria评估(Acceptable/Revise)请打勾进行评估()合格需修改简要概括了项目实际实施情况,包括是否调整了原设计方案。A brief summary of the actual implementation is given, including any deviations from the original design.明确描述数据收集的方法、时间、对象以及数量。Conditions for collecting the data are specified, including dates, times, research subjects and quantity.用图表或表格呈现数据,每个图表或表格有编号和标题。Tables or charts are used to compile the data and show trends. Tables and charts have proper titles and numbers so that variables are clear.数据描述清楚、呈现方式恰当。The data is clearly and properly presented.语言正确、准确,无歧义。This whole part is expressed in clear, accurate and unambiguous English.Tutors Comments:Part Three Discussion and Conclusion (Unit 10)DIRECTIONS FOR STUDENTS:Based on the data you have presented in Part Two, you are now required to select some significant facts and interpret these findings in a broader context. Instead of simply restating your results, you should draw inferences about their implications for business in general. This important part will later on be presented in your BA degree paper under the heading like “Discussion”.Write your text under the following blank space according to the above areas. (Suggested length: no fewer than 500 words.)My project hypothesis is that a well trained, not merely a courteous, workforce will be the best tool to ensure high-quality customer service. OJT (on the job training) is one means by which to achieve that end. From above data analysis, it is undoubtedly to say that the trainees have gotten great improvement in their job performance that lead to the rising of customers satisfaction. The results prove that my project hypothesis is applicable.Yet I should not be too optimistic, Since the percentage of customers satisfaction hasnt arrived the 100%. The improvement should keep on growing. This implies that a single training will not solve every performance problem because it is inappropriate when the problem stems from a cause other than the performers lack of knowledge or skill or the performers poor attitude. As I mentioned in the rationale, “When OJT has been carefully planned, organizations can effectively shorten unproductive breaking-in periods for newcomers.” But how to make sure that our OJT training is well and carefully planned? Through my project implementation, I aware that more attention should be paid to the difference between planned and unplanned OJT training in order to enhance staffs improvement in the field of customer service.Therefore, reviewing aids and alternatives to OJT is necessary. Combine other training or delivery alternative methods for OJT is required for next step training course.In my project, I used SWOT problem analysis method, questionnaire survey and brainstorming activation. They are all acceptable methods suitable to the problem analysis and have been properly used. I worked out the time-scale activities plan and implemented accordingly. By analyzing the data (results) collected from implementation, I believe that my project objective is realistic and researchable. Project members were co-operated with each other during the whole process of implementation. With the efforts of all, we achieved our final goal successfully. New employees are satisfied with the training arrangement and the course design. They are not only well equipped with professional knowledge; through field practice, but also improved the ability and skill in problem dealing. As the objective of my project is to increasing professionalism on the frontline; improvi

    注意事项

    本文(On the relationship between Staff Training and the Quality of Customer Service.doc)为本站会员(文库蛋蛋多)主动上传,三一办公仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知三一办公(点击联系客服),我们立即给予删除!

    温馨提示:如果因为网速或其他原因下载失败请重新下载,重复下载不扣分。




    备案号:宁ICP备20000045号-2

    经营许可证:宁B2-20210002

    宁公网安备 64010402000987号

    三一办公
    收起
    展开