欢迎来到三一办公! | 帮助中心 三一办公31ppt.com(应用文档模板下载平台)
三一办公
全部分类
  • 办公文档>
  • PPT模板>
  • 建筑/施工/环境>
  • 毕业设计>
  • 工程图纸>
  • 教育教学>
  • 素材源码>
  • 生活休闲>
  • 临时分类>
  • ImageVerifierCode 换一换
    首页 三一办公 > 资源分类 > PPT文档下载  

    Offshore Concept Summary.ppt

    • 资源ID:2875445       资源大小:11.61MB        全文页数:56页
    • 资源格式: PPT        下载积分:8金币
    快捷下载 游客一键下载
    会员登录下载
    三方登录下载: 微信开放平台登录 QQ登录  
    下载资源需要8金币
    邮箱/手机:
    温馨提示:
    用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)
    支付方式: 支付宝    微信支付   
    验证码:   换一换

    加入VIP免费专享
     
    账号:
    密码:
    验证码:   换一换
      忘记密码?
        
    友情提示
    2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
    3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
    4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。
    5、试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。

    Offshore Concept Summary.ppt

    Offshore Concept Summary,2008-06-25By Baomin Zhang,Topsides,The topsides component covers processing facilities for oil or gas,including wellhead manifolding,separation,gas treatment,gas compression,condensate handling,export metering,water or gas injection,utilities,power generation,communications and control,quarters,drilling facilities,bulk materials and structural steel.,Topsides,Topsides:can range from a small well protector platform weighing a few hundred tonnes,to a large drilling platform including processing,compression and quarters and weighing more than 30,000 tonnes.The main process systems can be specified together with the associated utilities,quarters and drilling and estimates equipment and bulk weights,material and fabrication costs,installation durations,design,management and HUC man-hours to produce an overall cost estimate,Jackets,The Jacket component provides costs for jacket steelwork and all appurtenances including piles,pile guides,anodes,conductor guides,riser guides,J tubes and lifting/installing aids.,Jackets,Jackets:traditional steel-piled jackets with three,four,six or eight legs can be selected based on the topsides weight,installation method and local environmental conditions.For topsides operating weights up to 1,600 tonnes and water depths up to 90m lightweight structures including guyed caissons,braced monotowers and lightweight jackets can be selected.,Gravity Based Structures,The Gravity Based Structure(GBS)component includes costs for the concrete gravity base together with all reinforcement,the transition piece,mechanical outfitting,grouting and ballasting systems and oil storage facilities.,Gravity based structures GBS,Gravity based structures GBS:concrete GBS either conventional or monotower can be selected with or without storage.Typically used in the Norwegian sector of the North Sea.,Offshore Pipelines,The offshore pipelines component allows calculation of pipeline sizes,wall thicknesses,materials,fittings,installation,design and project management costs for pipelines and riser systems.The pipelines can include single phase or multiphase product export,water injection,gas injection and gas lift lines to shore,to new or existing platforms(fixed or floating)and to existing pipelines for tie-in.The materials costs include for linepipe,flexible risers and support systems,steel risers(new or retrofit),shore approaches,corrosion protection,weight coating,cathodic protection,insulation,fixtures and fittings.Installation can be by a range of vessels suitable for the combination of pipeline diameter and water depth.Installation vessels include the lay barge,reel ship or heavy lift vessel as well as DSVs for tie-ins and testing,trenching and survey vessels.,Pipelines,Pipelines:are defined by size,wall thickness,material and installation.The cost includes for risers,pipeline tie-ins and shore approaches.Used in water depths down to 4,000m.,Semi-submersibles,The semi-submersible component includes costs for the vessel purchase,mooring system,accommodation units,upgrading of converted vessels,installation and project management.,Semi-submersible,Semi-submersible:second to fifth generation new builds and second to fourth generation converted semi-submersibles can be selected with or without rigs.Used in water depths down to 4,000m.,Spar Buoys,The spar buoy component includes costs for the hull,mooring system,risers materials and fabrication plus installation,design and project management.,Tankers,The tanker component includes costs for the vessel purchase,mooring system,quarters(for marine crew),vessel upgrades,installation and project management.,Tension Leg Platforms,a conventional TLP and a mini TLP.The conventional TLP hull is assumed to have four columns arranged in a square with a ring pontoon at the base of the columns.The topsides,including the deck,sits on the columns and a group of tethers attached to each column terminates at the seabed in a piled foundation.Tensioned steel risers are assumed,Tension Leg Platforms,The mini TLP hull is assumed to have a single central column supporting the topsides.Three radial pontoons project out from the bottom of the column and these are tapered with height decreasing towards the tip.The tendons are attached to the hull at the tip of each pontoon and terminate at the seabed in a piled foundation.Tensioned steel risers are assumed to run through the monopool of the central column,offshore loading,Catenary Anchor Leg Mooring(CALM)buoys,SingleArticulated Leg Moorings(SALMs)Floating Loading Platforms(FLP).,offshore loading,CALM:A catenary anchor leg mooring consisting of a buoy supporting fluid swivels anchored using a spread pattern of four or six chains.Connection to the tanker is via floating hose if only shuttle tankers are used and via rigid yoke if a permanent storage tanker is used.,offshore loading,SALM:A single articulated leg mooring based on the EMH articulated column design.The mooring system consists of a piled or gravity base,a solid or lattice construction articulated tower,rigid riser,rotating head and extended boom to support the loading hose.Temporary quarters and helideck are included.,offshore loading,FLP:A floating loading platform.This is similar in principle to the CALM buoy but is on a larger scale and includes temporary quarters and helideck.FLPs are not recommended in water depths less than 50m.In shallow water,(25m),it is not possible to install a SALM or FLP and therefore CALM is the only recommended option.SALMs are not recommended for water deeper than 250m.,Offshore Drilling,The drilling component estimates the drilling costs including rig hire(for jack-up and semi-submersible rigs),drill crew,well equipment,consumables,materials,conductors,etc.For a tender assisted platform rig the rig hire includes only for the hire of the tender assist vessel and its marine crew.,Offshore Drilling,Several drilling operations can be specified on a development and the total drilling operations can be a combination of platform wells,subsea wells and exploration/appraisal wells.However,if a combination of rig types is required,then each should be costed as a separate drilling component.,Offshore Drilling,Equipment CostsThe configuration of the Xmas trees is typically subsurface safety valve,lower master valve,upper master valve,choke valve,wing valve and(if subsea)tree cap.The wellhead sits below the Xmas tree and typically includes a casing hanger,casing head spool,tubing hanger,tubing spool and seals.Completion equipment costs vary dependent on the type of completion selected.ESP costs include for the downhole equipment plus the topsides electrical equipment.The downhole equipment typically includes the pump,motor and seal assembly,a packer,motor lead extension cable and a nominal 2000m of power cable per pump.The topsides electrical equipment includes for a step-up transformer,junction box and variable speed controller.If the wells are subsea,the subsea component will include electrical cables in the umbilicals to power the ESPs.,Subsea,Subsea:template or cluster wells linked to manifolds,covers flowlines,umbilicals and risers.Includes features such as diver or diverless installation,steel or flexible flowlines,round trip pigging,trawl protection structures and new or retrofit risers.Used in water depths down to 4,000m.,Subsea,The subsea component provides costs for all subsea equipment and materials including:Clusters,templates and satellites.Commingling and riser base manifolds.Production,test,injection and gas lift flowlines.Risers and riser systems.Umbilicals.Platform controls.,Subsea,Development typeThe default development type is Cluster manifold but Template manifolds and individual Satellite wells are also available.The selected development type is used to generate the default subsea configuration.Selecting Cluster or Template does not mean that satellite wells will not be included as the default configuration is derived based on matching the exact well count.A combination of clusters,templates and satellites can be specified in the subsea schematic.Any changes made in the subsea schematic will not update the development type.,Subsea,Features 1Through piggingIncludes a minimum of two production flowlines of equal size to allow round trip pigging from the host facility when a new subsea configuration is generated.If a test/service line is present this forms one of the flowlines.Chemical injectionIncludes chemical injection flowlines to all templates,clusters or satellite production wells when a new subsea configuration is generated.Chemical injection lines can be included in the umbilical so this should only be selected if a larger diameter chemical injection flowline(in addition to the chemical tubes in the umbilicals-typically 1”diameter)is required for batch dosing the wells.Test serviceIncludes a test/service line in every flowline group when a new subsea configuration is generated.Gas liftAllows for all production wells to be gas lifted and includes a gas lift flowline in every flowline group when a new subsea configuration is generated.Gas lift rateThe required ratio of gas lift to produced oil,used to size lift and production lines.This only becomes active if Gas lift is selected and defaults to 600 scf/bbl,Subsea,Riser systemsWhen flexible risers are included,the cost for a riser support system consisting of an arch and buoy is included.Each system can support up to five risers.The number of riser systems required is determined assuming the maximum total diameter of risers that can be handled by any one system is 40 inch,Barges,It should be noted that barges are probably most suitable to shallow water/swamp regions.As such they are most applicable in the Far East/African regions.Some geographical databases have no suitable areas for barge installation and are not provided with barge cost data,e.g.North Sea regions.If it is required that a barge is to be used in such a region,the cost data should be manually entered.,Decommissioning,decommissioning cost estimate to each topsides,jacket and pipeline.Decommissioning,dismantling,removal and disposal costs are considered along with associated costs for design,project management,insurance and certification.,Oil Processing ToolbarToolbar buttonButton functionInsert separator/insert test separator(2nd occurrence of symbol to the right of the stabiliser icon)Insert heat exchanger Insert dehydratorInsert desalterInsert reboiled stabiliserDelete componentPrint.Print out contains the oil processing schematic plus a table containing the flow,temperature,pressure,oil SG and gas molecular weightPrint preview,Any question?,

    注意事项

    本文(Offshore Concept Summary.ppt)为本站会员(laozhun)主动上传,三一办公仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知三一办公(点击联系客服),我们立即给予删除!

    温馨提示:如果因为网速或其他原因下载失败请重新下载,重复下载不扣分。




    备案号:宁ICP备20000045号-2

    经营许可证:宁B2-20210002

    宁公网安备 64010402000987号

    三一办公
    收起
    展开