地基处理强夯法(英文PPT) .ppt
我们毕业啦其实是答辩的标题地方,地基处理强夯法(动力固结法),汇报人,指导老师,Introduction,Preliminary evaluation,Design considerations,Contracing procedures,Constraction monitoring,CONTENT,Adjustments duringdynamic compaction,介绍,预先评估,设计考虑,招投标程序,建设监管,The mass of the tampers generally ranges from 5.4 to 27.2 Mg,and drop heights range from 12.2to 30.5 m.,Lighter tampers and smaller drop heights result in depths of improvement on the order of 3.0 to 4.6 m.Heavier tampers and greater drop heights result in improvements on the order of 6.1 to 9.1 m,“,”,强夯调整,1,Categorize soil type:(1)Site Investigation(2)General Description of Soil Categories,Assess site restraints:(1)Ground Vibrations(2)Lateral Ground Displacements(3)High Water Table(4)Presence of Hard or Soft Layers,2,Determine design requirements:(1)Tolerable Settlement(2)Minimum Soil Property(3)Depth Of Improvement Limitation,3,论文绪论,研究背景,研究方法,研究结果,问题讨论,论文总结,介绍,预先评估,设计考虑,招投标程序,建设监管,强夯调整,Estimate costs:(1)Dynamic Compaction Costs(2)Alternate Ground Improvement Techniques,4,论文绪论,研究背景,研究方法,研究结果,问题讨论,论文总结,介绍,预先评估,设计考虑,招投标程序,建设监管,强夯调整,Selection of the tamper mass and drop height to correspond to the required depth of improvement.Determination of the applied energy to be used over the project site to result in the desired improvement.Selection of the area to densify.Determination of the grid spacing and number of phases.Establishing the number of passes.The need for a surface stabilizing layer.,研究背景,研究背景,研究方法,研究结果,问题讨论,论文总结,介绍,预先评估,设计考虑,招投标程序,建设监管,强夯调整,研究背景,研究方法,研究结果,问题讨论,论文绪论,论文总结,论文绪论,研究背景,研究方法,研究结果,问题讨论,论文总结,介绍,预先评估,设计考虑,招投标程序,建设监管,强夯调整,DEVELOPMENT OF DESIGN PLAN,MULTIPLE PASSES,AREA TO DENSIFY,论文绪论,研究背景,研究方法,研究结果,问题讨论,论文总结,论文绪论,研究背景,研究方法,研究结果,问题讨论,论文总结,介绍,预先评估,设计考虑,招投标程序,建设监管,强夯调整,论文绪论,研究背景,研究方法,研究结果,问题讨论,论文总结,介绍,预先评估,设计考虑,招投标程序,建设监管,强夯调整,研究背景,研究方法,研究结果,问题讨论,论文绪论,论文总结,论文绪论,研究背景,研究方法,研究结果,问题讨论,论文总结,介绍,预先评估,设计考虑,招投标程序,建设监管,强夯调整,Design considerations,GRID SPACING AND NUMBER OF DROPS,SURFACE STABILIZING LAYER,APPLIED ENERGY REQUIREMENTS,SELECTION OF TAMPER AND DROP HEIGHT,论文绪论,研究背景,研究方法,研究结果,问题讨论,论文总结,介绍,预先评估,设计考虑,招投标程序,建设监管,强夯调整,研究背景,研究方法,研究结果,问题讨论,论文绪论,论文总结,论文绪论,研究背景,研究方法,研究结果,问题讨论,论文总结,介绍,预先评估,设计考虑,招投标程序,建设监管,强夯调整,SELECTION OF TAMPER AND DROP HEIGHT,n has been found at project sites to range from 0.3 to 0.8.The variation in n is attributed to the:Efficiency of the drop mechanism of the crane.Total amount of energy applied.Type of soil deposit being densified.Presence of energy absorbing layers.Presence of a hard layer above or below the deposit being densified.Contact pressure of the tamper.,论文绪论,研究背景,研究方法,研究结果,问题讨论,论文总结,论文绪论,研究背景,研究方法,研究结果,问题讨论,论文总结,介绍,预先评估,设计考虑,招投标程序,建设监管,强夯调整,论文绪论,研究背景,研究方法,研究结果,问题讨论,论文总结,介绍,预先评估,设计考虑,招投标程序,建设监管,强夯调整,论文绪论,研究背景,研究方法,研究结果,问题讨论,论文总结,介绍,预先评估,设计考虑,招投标程序,建设监管,强夯调整,研究背景,研究方法,研究结果,问题讨论,论文绪论,论文总结,论文绪论,研究背景,研究方法,研究结果,问题讨论,论文总结,介绍,预先评估,设计考虑,招投标程序,建设监管,强夯调整,APPLIED ENERGY REQUIREMENTS,研究背景,研究方法,研究结果,问题讨论,AREA TO DENSIFY,Dynamic compaction is generally completed over an area larger than the plan area of the embankment or the loaded area.,GRID SPACING AND NUMBER OF DROPS,A drop point spacing of 1.5to 2.5 times thediameter or width of the tamper is common.,MULTIPLE PASSES,The number of drops that can be applied at a grid point location at onetime could be limited by the depth of the crater.,SURFACE STABILIZING LAYER,At sites where the surface is in an extremely loose condition,such as an old landfill,it might beNecessary to add a stabilizing surface material of granular soil to form a working mat.,论文绪论,论文总结,论文绪论,研究背景,研究方法,研究结果,问题讨论,论文总结,介绍,预先评估,设计考虑,招投标程序,建设监管,强夯调整,If the design agency and/or their consultant do not have expertise in dynamic compaction,a performance type contract should be selected for the work.,performance specifications,Preparation of a method specification requires knowledge of the various facets of dynamic compaction either within the design agency or by their consultants.,method specifications,研究背景,研究方法,研究结果,问题讨论,论文绪论,论文总结,研究背景,研究方法,研究结果,问题讨论,论文绪论,论文总结,论文绪论,研究背景,研究方法,研究结果,问题讨论,论文总结,介绍,预先评估,设计考虑,招投标程序,建设监管,强夯调整,研究背景,研究方法,研究结果,问题讨论,论文绪论,论文总结,研究背景,研究方法,研究结果,问题讨论,论文绪论,论文总结,论文绪论,研究背景,研究方法,研究结果,问题讨论,论文总结,介绍,预先评估,设计考虑,招投标程序,建设监管,强夯调整,Two basic types of specifications are used for dynamic compaction projects:method specifications and performance specifications.,研究背景,研究方法,研究结果,问题讨论,论文绪论,论文总结,研究背景,研究方法,研究结果,问题讨论,论文绪论,论文总结,论文绪论,研究背景,研究方法,研究结果,问题讨论,论文总结,介绍,预先评估,设计考虑,招投标程序,建设监管,强夯调整,研究背景,研究方法,研究结果,问题讨论,论文绪论,论文总结,研究背景,研究方法,研究结果,问题讨论,论文绪论,论文总结,论文绪论,研究背景,研究方法,研究结果,问题讨论,论文总结,介绍,预先评估,设计考虑,招投标程序,建设监管,强夯调整,研究背景,研究方法,研究结果,问题讨论,论文绪论,论文总结,研究背景,研究方法,研究结果,问题讨论,论文绪论,论文总结,论文绪论,研究背景,研究方法,研究结果,问题讨论,论文总结,介绍,预先评估,设计考虑,招投标程序,建设监管,强夯调整,method specifications,The contractors primary duties:,研究背景,研究方法,研究结果,问题讨论,论文绪论,论文总结,研究背景,研究方法,研究结果,问题讨论,论文绪论,论文总结,论文绪论,研究背景,研究方法,研究结果,问题讨论,论文总结,介绍,预先评估,设计考虑,招投标程序,建设监管,强夯调整,method specifications,General description,Work area,Equipment required,Energy application,Backfill and ground leveling,Required testing,Recordkeeping,Payment,问题讨论,研究结果,研究背景,研究方法,论文绪论,论文总结,研究背景,研究方法,研究结果,问题讨论,论文绪论,论文总结,研究背景,研究方法,研究结果,问题讨论,论文绪论,论文总结,论文绪论,研究背景,研究方法,研究结果,问题讨论,论文总结,介绍,预先评估,设计考虑,招投标程序,建设监管,强夯调整,performance specifications,研究背景,研究方法,研究结果,问题讨论,论文绪论,论文总结,研究背景,研究方法,研究结果,问题讨论,论文绪论,论文总结,论文绪论,研究背景,研究方法,研究结果,问题讨论,论文总结,介绍,预先评估,设计考虑,招投标程序,建设监管,强夯调整,研究背景,研究方法,研究结果,问题讨论,论文绪论,论文总结,研究背景,研究方法,研究结果,问题讨论,论文绪论,论文总结,研究背景,研究方法,研究结果,问题讨论,论文绪论,论文总结,论文绪论,研究背景,研究方法,研究结果,问题讨论,论文总结,介绍,预先评估,设计考虑,招投标程序,建设监管,强夯调整,Project description,Work area,Requiredimprovement,Prequalification,Timeduring fordynamiccompaction,Site preparation,Required testing,Recordkeeping,Payment,Close coordination between the design engineer and the person writing the specifications is essential!,问题讨论,研究结果,研究背景,研究方法,4,2,3,Induced settlement,论文绪论,论文总结,问题讨论,研究结果,研究背景,研究方法,论文绪论,论文总结,研究背景,研究方法,研究结果,问题讨论,论文绪论,论文总结,研究背景,研究方法,研究结果,问题讨论,论文绪论,论文总结,论文绪论,研究背景,研究方法,研究结果,问题讨论,论文总结,介绍,预先评估,设计考虑,招投标程序,建设监管,强夯调整,1,MONITORING,问题讨论,研究结果,研究背景,研究方法,论文总结,A,B,C,Multiple phases and passes,Thickness of granular working mat,Ground water control,论文绪论,问题讨论,研究结果,研究背景,研究方法,论文绪论,论文总结,研究背景,研究方法,研究结果,问题讨论,论文绪论,论文总结,研究背景,研究方法,研究结果,问题讨论,论文绪论,论文总结,论文绪论,研究背景,研究方法,研究结果,问题讨论,论文总结,介绍,预先评估,设计考虑,招投标程序,建设监管,强夯调整,D,Ground vibrations,Buried energy absorbing layers,E,THANKS,